News
Follow what has changed.
Reviewed news adds a checked explanation of a development and the stage the evidence supports. Automatic headlines are for discovery and are labelled as not yet reviewed. Publication dates and review dates are shown separately, and older items stay as history.
Reviewed news
894 reviewed developments across 151 chains. Each record retains its own review date. A missing review date stays unknown; a check or collection date never replaces it.
A weekly reviewed news run is planned and not yet running, so many chains will show Review overdue until it starts. The items stay available as history.
Sorted by publication date · newest first; equal dates follow the alphabetical chain order. Page 1 of 18.
One chain's developments, A to Z
-
Chiliz governance executed the inactive-validator cleanup proposal
Chiliz's governance application marked CIP-052 executed. Its description proposed disabling eight inactive legacy validators. The matching on-chain transaction was included on November 17 and emitted a ProposalExecuted event and eight ValidatorModified events. The proposal limited this action to legacy inactive validator records.
- Proposal:CIP-052 marked Executed in the official governance application
- Implementation:eight validator-modification events matched the proposal's disable calls
- Release:not stated in the sources opened
- Activation:governance execution recorded 2026-11-17T09:58:05Z
Sources: Chiliz Chain governance — Chiliz governance proposals (external site) · Chiliscan (Routescan) — Chiliz CIP-052 execution transaction (external site) · Chiliscan (Routescan) — Chiliz CIP-052 execution event log (external site)
-
Flare scheduled a fee-refund limit on Coston and Songbird
Flare published v1.15.2-rc.0 and scheduled refund-eligibility changes for Coston on November 24 and Songbird on December 1, both at 12:00 UTC. Prioritized-contract transactions would receive refunds only with a gas limit of at most 3,000,000; transactions above that limit would execute and pay the full fee. The notes called for those networks' nodes to update before the scheduled times. The available build remained a release candidate; activation was not established.
- Implementation:refund-eligibility change documented in release candidate v1.15.2-rc.0
- Release:release candidate published 2026-11-17; stable release not established
- Activation:Coston scheduled 2026-11-24T12:00:00Z; Songbird scheduled 2026-12-01T12:00:00Z; activation not confirmed
Sources: flare-foundation/go-flare — v1.15.2-rc.0 (external site) · flare-foundation/go-flare — Release Notes: Flare and Songbird networks at v1.15.2-rc.0 (external site)
-
NEAR House of Stake disclosed an MPC operator compromise and key-share rotation
House of Stake's operations security update reported an MPC operator node compromise through an exposed endpoint. It said an attacker replaced the node image and extracted key shares. An on-chain vote removed the affected node, and all active key shares were rotated. Applications were encouraged to migrate to replacement domains; completed migration, user losses and a layer-one halt were not reported.
- Proposal:affected-node removal approved by on-chain vote
- Implementation:affected node removed and all active key shares rotated
- Release:official security update published 2026-11-17
- Activation:mitigations reported; completed application migration was not established
-
Astar's council reported trapped transfers and a Portal route removal
Astar's council-backed recovery proposal reported that transfers to Hydration became trapped after a destination fee-currency change. It said Astar Portal removed that route on November 11 and the Technical Committee prepared and locally tested a recovery call. Referendum 67 had started on November 16 and remained open; successful recovery of the affected transfers was not established.
- Proposal:recovery referendum 67 started November 16; vote remained open
- Implementation:recovery call prepared and locally tested, according to the council proposal
- Release:not a node-software release
- Activation:Portal route removed November 11; transfer recovery not confirmed
-
Astar approved an update to its recorded XCM versions
Astar referendum 66 passed on November 16. It proposed changing recorded XCM versions for Asset Hub and Hydration from 3 to 5 and the default safe version from 3 to 4. The proposal described preparation for XCMv3 removal. The opened timeline showed passage, without an execution event or confirmation that the new configuration was live.
- Proposal:referendum 66 passed November 16
- Implementation:configuration changes specified in the proposal
- Release:not a node-software release
- Activation:execution and live configuration not established
-
Canton reported validators falling out of consensus after an upgrade
Canton maintainers reported that a small percentage of active Mainnet validators had fallen out of consensus after being unprepared for the latest Logical Synchronizer Upgrade. They were testing a recovery procedure with selected operators before publishing a runbook. The report did not give the upgrade's date or confirm that all affected validators had recovered, and it did not report a network-wide halt.
- Implementation:recovery method being tested with selected operators
- Release:public recovery runbook conditional on validation
- Activation:affected validators out of consensus; complete recovery not confirmed
Source: Canton Network Forum — MainNet LSU – Validator Recovery Progress Update (external site)
-
Celestia reported v11 activation on Corto and planned its Mocha rollout
The emergency v11 testnet builds restricted listed accounts to a recovery address in response to exposed social-login keys. The November 16 release notice said v11 activated on Corto that day; Mocha still required validator signalling and delayed activation. Each test network used three test accounts. Mainnet v11 had not been released, according to the upgrade docs.
- Proposal:Validator signalling required for version 11.
- Implementation:Testnet account restrictions and DA-node compatibility build released.
- Release:Corto build November 15; Mocha app and node builds November 16; mainnet v11 unreleased.
- Activation:Corto activated November 16 per team; Mocha pending without a fixed height.
Sources: celestiaorg — celestia-app releases (external site) · Celestia Docs — Network upgrades (external site) · Celestia Foundation / Celestia Network Status — Mocha: celestia-app fibre v11.0.0-mocha and celestia-node v0.36.0-mocha upgrade (external site) · celestiaorg/celestia-node — v0.36.0-mocha (external site)
-
Kava reported a contained security incident in HARD Lend
Kava's November 16 report attributed a November 14 HARD Lend exploit to lending-accounting errors involving BUSD collateral. The team said it blocked repetition of the exploit and froze some proceeds, while recovery continued. It said the underlying chain was not compromised. Accelerated retirement of legacy lending remained a plan requiring a future governance vote; completed recovery or shutdown was not established.
- Proposal:Future proposal planned to disable new lending and borrowing.
- Implementation:Team reported containment and some proceeds frozen.
- Release:Incident response report published November 16.
- Activation:Protective measures reported in force; permanent retirement and complete recovery not established.
Sources: Kava Chain / HARD Lend Incident Response Team — HARD Lend Security Incident (external site) · Kava Chain (Medium) — Stories by Kava Chain on Medium (RSS feed) (external site) · Kava — Lend (external site)
-
NEAR House of Stake ratified HSP-029's issuance-reduction schedule
NEAR reported that House of Stake ratified HSP-029 after its Security Council review closed without a veto. The proposal set a 24-month, per-epoch reduction of maximum annual issuance from 2.5% to 1.6%, retaining the existing allocation split. The post said a grace quarter, a Near One software release and independent validator adoption were still required before the reduction began.
- Proposal:ratified 2026-11-16 after the veto window closed
- Implementation:a Near One upgrade remained required
- Release:implementing release not identified in the sources opened
- Activation:not established; validator adoption and a confirmed schedule remained required
Sources: NEAR Protocol — NEAR Protocol Inflation Rate Reducing to 1.6% | HSP-029 (external site) · NEAR Forum / hos_official — HSP-029: Establish a 24-Month Issuance Ramp to a 1.6% Target Rate Of NEAR Token Emissions (external site)
-
Oasis published Core 26.5 node software
Oasis published Core 26.5 as a node-software release. Its notice linked the detailed changelog and cautioned operators to review removals and breaking changes before upgrading. The announcement did not establish mainnet adoption or a network activation date.
- Implementation:Core 26.5 release published; detailed changes not established in the sources read
- Release:released 2026-11-16
- Activation:not stated in the sources opened; no activation inferred from the release
Source: oasisprotocol/oasis-core — Oasis Core 26.5 (external site)
-
Sei required v6.7.5 for RPC nodes to correct failed-transaction traces
The release corrected traces for transactions included onchain that failed before execution and changed trace-cache format handling. Its notice required the update for RPC nodes, with no governance proposal or coordinated chain halt.
- Implementation:Corrected failed-transaction traces and trace-cache version handling.
- Release:v6.7.5 released November 16.
- Activation:Per-node update; adoption not observed.
Source: Sei Protocol contributors — sei-chain releases (external site)
-
Solana retired the mainnet-beta label and announced shared protocol versioning
The Solana Foundation retired the mainnet-beta designation and introduced a shared protocol-version model independent of individual client versions. It said accounts, assets, applications and history remained unchanged, while feature activations retained separate rollout timelines.
- Stage:Announced
Source: Solana Foundation — Solana 1.0: Dropping -beta, and what comes next (external site)
-
Zebra 7.1.0 fixed ten security issues affecting sync and memory use
The Zcash Foundation announced Zebra 7.1.0 with ten security fixes, including peer-triggered sync disruption and memory exhaustion affecting nodes and public wallet services. The release added limits on recent-block indexes and verification queues. The Foundation advised every node operator to upgrade and stated that upgrades from 7.0.0 needed no database migration or resync.
- Stage:Release
Sources: Zcash Foundation — Zebra 7.1.0: Security Fixes for Sync and Memory Exhaustion (external site) · ZcashFoundation/zebra — Zebra 7.1.0 (external site) · Zcash Foundation — Zebra 7.1.0: Security Fixes for Sync and Memory Exhaustion (external site)
-
Zora's operator scheduled a testnet contract upgrade for November 24
Conduit named Zora among enterprise testnets scheduled to receive OP Contracts v8.0.0 and v9.0.0 on November 24, 2026. It described a contracts-only upgrade with withdrawal-handling and custody-contract changes, without an accompanying hard fork or node-software update. The notice remained a schedule; it did not confirm testnet activation.
- Implementation:contract changes described by operator
- Release:OP Contracts v8.0.0 and v9.0.0 named in notice
- Activation:Zora enterprise testnet upgrade scheduled November 24, 2026; not confirmed active
Source: Conduit — [Enterprise Testnets] OP Contracts v8.0.0 + v9.0.0 Upgrade [Notice] (external site)
-
Bitcoin Cash Node committed to implementing Faster Blocks for May 2027
The Bitcoin Cash Node maintainers committed to implementing CHIP-2025-03 Faster Blocks in their next node release, targeting mainnet activation on 15 May 2027. They described a Chipnet preview and said the mainnet release would follow later. The announcement established the maintainers' implementation plan and schedule, not completion or activation of the upgrade.
- Proposal:BCHN maintainers committed to CHIP-2025-03 implementation
- Implementation:Chipnet preview described; next mainnet node release planned
- Release:proper mainnet release still pending
- Activation:mainnet activation planned for 2027-05-15; not observed
-
Acurast released fixes for staking cooldown and overstake checks
Acurast released v0.27.3 with Mainnet Runtime 20 and Canary Runtime 65. It rejected cooldown periods above the maximum, closing a path that let a commitment's reward weight exceed its stake, and repaired an overstake check skipped when only the cooldown period increased. The notes did not establish exploitation or runtime enactment dates.
- Implementation:fixes included in Mainnet Runtime 20 and Canary Runtime 65
- Release:v0.27.3 published November 13
- Activation:not stated in the sources opened
Source: Acurast/acurast-substrate — acurast-v0.27.3 (external site)
-
Aptos released node v1.50.1 for mainnet operators
Aptos published the mainnet v1.50.1 node release and marked both validators and fullnodes for upgrade. Its notes included consensus commit-vote matching against complete ledger information and virtual-machine accounting changes. Publication of the client software did not establish execution of the separate mainnet framework-governance proposal.
- Implementation:node software v1.50.1 published
- Release:mainnet release published 2026-11-13
- Activation:software release; framework-governance execution not established
Source: aptos-labs/aptos-core — [Mainnet] Aptos Node Release v1.50.1 (external site)
-
Nervos's Fiber project released V2 channel messaging in v0.10.0
Fiber v0.10.0 introduced V2 peer-to-peer messaging and recommended that users upgrade. Its maintainers stated that existing V1 channels could continue operating, but new channels could not be opened between this release and older versions. They asked operators to settle V1 channels because V1 support was planned for removal in the next major release. This was a Fiber migration, not a CKB consensus activation.
- Implementation:V2 P2P messaging implemented in Fiber v0.10.0
- Release:stable Fiber v0.10.0 released 2026-11-13
- Activation:per-node upgrade; V1 support removal planned for the next major release; no CKB activation claimed
-
Optimism reported two failed Security Council ratification votes
The Optimism Foundation reported on November 13 that a second Security Council ratification vote had failed to reach quorum, after an earlier failure. It submitted the same proposal for a third vote without changing the proposal or calculations. The opened vote pages showed the first two defeated and the third active; they did not confirm that the membership change took effect.
- Type:Proposal
- Proposal:Failed quorum twice third vote active
- Release:Not applicable
- Activation:Membership change not confirmed
Sources: Optimism Foundation on governance forum — Proposed Security Council changes: members proposed by Lead and subject to Token House veto (external site) · Optimism Agora — Proposed Security Council changes (external site) · Optimism Agora — Proposed Security Council changes (external site) · Optimism Agora — Proposed Security Council changes (external site)
-
Polygon publicly released Bor v2.11.1 with security and stability fixes
Polygon released public Bor v2.11.1 with the same code as v2.11.1-priv. The release checked block headers and bodies before execution and adjusted handling of simulation calls carrying blob hashes. Polygon Labs described security and stability fixes, and confirmed there was no hard fork, consensus change, activation block, database migration or resync requirement.
- Implementation:security and stability fixes included in Bor v2.11.1
- Release:public stable release published 2026-11-13; matched v2.11.1-priv
- Activation:no hard fork or activation block; applies per node when updated; adoption not independently observed
Sources: 0xPolygon/bor — v2.11.1 (external site) · Polygon Labs / Polygon Community Forum — Bor v2.11.1 for mainnet and Amoy. (external site)
-
dYdX outlined a USDC migration with its v9.9 software rollout
dYdX outlined a gradual change in USDC backing from Noble to Injective while retaining the existing denomination and balances. Stable v9.9 software followed on November 13. The proposer targeted November 17 around 17:00 UTC, suggesting height 114,220,000, subject to governance. The pages opened did not establish a passed vote or activation.
- Proposal:Governance approval required; result not established by the pages opened.
- Implementation:New canonical USDC module included in v9.9 software.
- Release:Stable protocol v9.9.0 published November 13.
- Activation:Target November 17 around 17:00 UTC at suggested height 114,220,000; activation unconfirmed.
Sources: dYdX — USDC on dYdX Chain: Migration from Noble USDC to Injective USDC (external site) · dydxprotocol maintainers — v4-chain releases (external site) · dYdX Operations SubDAO / dYdX Community Forum — [DRC] Proposal for dYdX Protocol Upgrade to v9.9 (external site)
-
Lotus 1.39.1 tightened backup paths and JSON-RPC validation
Lotus published a node and miner patch that rejected backup paths outside the configured backup directory and noncanonical or oversized JSON-RPC quantities. It moved the Filecoin virtual machine to the Wasmtime 48 long-term-support runtime. The notes recommended the release for node operators and storage providers and warned about API compatibility changes.
- Implementation:backup-path and API checks included in Lotus 1.39.1
- Release:released 2026-11-12
- Activation:takes effect per installation when upgraded; no new consensus activation established
Sources: filecoin-project/lotus — v1.39.1 (external site) · filecoin-project/lotus — Lotus releases (external site)
-
Initia reported a MoveVM exploit, halt and patched restart
Initia reported that an October 23 MoveVM flaw allowed forged token balances and bridge withdrawals. Validators halted the L1 that day. The report confirmed a November 2 restart with patched initiad v1.4.11 and quarantine of remaining forged balances. It said legitimate users' balances were unchanged; investigation continued.
- Implementation:MoveVM fix and recovery changes applied
- Release:v1.4.11 publicly released 2026-11-04
- Activation:report confirmed restart 2026-11-02; recovery active from block 23,365,926
Sources: Initia; initia-labs/audits — Initia Security Incident of October 23, 2026 Report (external site) · Zellic; published in initia-labs/audits — Initia Incident Investigation and Remediation Review (external site) · initia-labs/initia on GitHub — v1.4.11 (external site) · initia-labs — initia binaries (external site)
-
Kaia released v3.0.0 and scheduled Kairos's permissionless upgrade
Kaia's v3.0.0 release announcement implemented the permissionless validator lifecycle, validator evaluation and revised node topology. It set Kairos hardfork block 233366400, estimated for November 18 at 14:06 UTC. The mainnet hardfork block would be specified in a later release. This advanced the existing permissionless policy to a released implementation and scheduled testnet stage; activation was not confirmed.
- Proposal:existing GP-20 policy passed; KIP-286 page still labelled Draft
- Implementation:permissionless implementation included in v3.0.0
- Release:v3.0.0 published 2026-11-12T00:05:25Z; official blog announcement dated 2026-11-12
- Activation:Kairos block 233366400 estimated 2026-11-18 14:06 UTC; mainnet block later; no completed activation confirmed
Sources: Kaia official blog, Praveen Challa — Kaia v3.0.0 Release Notice (Kairos Testnet) (external site) · Kaia Governance Forum — [GP-20] Kaia Permissionless Network Policy (English) (external site) · Kaia Improvement Proposals — KIP-286: Permissionless Validator Lifecycle (external site) · Kaia Blog — PGT Part 1: Kaia's Structural Transition to a Permissionless & Performance-Based Network (external site) · Kaia Docs — Kaia Governance (external site) · kaiachain/kaia — Kaia v3.0.0 Release Notice (external site)
-
Astar closed eight XCM channels after referendum 65
The Astar Foundation reported that referendum 65 passed on November 9 and enacted on November 11 at block 15,451,200. Its November 12 follow-up said it checked the relay chain and confirmed closure of all eight HRMP channels, covering both directions with Phala, Polkadex, Pendulum and Unique.
- Proposal:referendum 65 passed November 9
- Implementation:eight HRMP channels closed, according to the Foundation's relay-chain check
- Release:not applicable to a runtime release
- Activation:enacted November 11 at block 15,451,200; confirmed in November 12 follow-up
Sources: Astar Foundation on Astar Forum — Closing XCM channels with four more Polkadot parachains (Round 2) (external site) · Astar governance via Subsquare — Closing XCM channels with four more Polkadot parachains (external site)
-
Celestia announced a node security-release rollout for Mocha and mainnet
The foundation announced the v0.35.0 line for Mocha on November 11 and mainnet on November 12. It described security and stability fixes, replacement of Bitswap with shrex and token revocation for node access. The stable release also documented bounded proof caching and stricter proof verification. No coordinated upgrade was required.
- Implementation:Proof/resource hardening and node-access token revocation documented.
- Release:Mocha rollout announced November 11; mainnet v0.35.0 released November 12.
- Activation:No coordinated upgrade; operator adoption not observed.
Sources: Celestia Foundation / Celestia Network Status — Mocha: celestia-node v0.35.0-mocha upgrade (external site) · Celestia Foundation / Celestia Network Status — Mainnet Beta: celestia-node v0.35.0 upgrade (external site) · celestiaorg/celestia-node — v0.35.0 (external site) · celestiaorg/celestia-node — v0.35.0-mocha (external site)
-
Hedera Council added Apex Group as a member
Hedera announced that Apex Group had joined the Council governing the public network. The notice established a membership change; it did not announce a protocol activation or a change to the network's consensus rules.
- Implementation:Council membership announced
- Release:not applicable to membership change
- Activation:membership confirmed in November 11 notice
Source: Hedera — Apex Group joins Hedera Council to advance institutional digital assets (external site)
-
Ink's Upgrade 21 contract proposal received optimistic approval
The Upgrade 21 governance vote showed optimistic approval, and its proposal explicitly included Ink in the L1 contract execution batch. It covered withdrawal handling, pause and lockbox consistency, and contract-management changes. November 16 remained a conditional execution target; the opened sources did not confirm completion or operational interoperability.
- Proposal:optimistic approval shown by governance
- Implementation:contract changes specified in Upgrade 21
- Release:not stated in the sources opened
- Activation:November 16 conditional target; execution not confirmed
Sources: Optimism Agora — Upgrade 21: Interop Readiness (external site) · Optimism governance forum — Upgrade 21: Interop Readiness (external site)
-
Kaia confirmed JPYC recognition applied in Contribution Reward Epoch 4
Kaia's official Epoch 3 report stated that Epoch 4 was in progress and JPYC deposited in Unifi had been added to recognized contribution assets. Epoch 4 began at block 230342400. The existing cap, matching ratio and monthly budget were unchanged. This confirmed operation beyond the October 14 eligibility schedule.
- Implementation:JPYC deposits in Unifi recognized from Epoch 4
- Release:operation confirmed in official report dated 2026-11-11
- Activation:Epoch 4 in progress from block 230342400; JPYC recognition applied
Sources: Kaia_Governance, Kaia Governance Forum — [CR] Contribution Reward Monthly Report - Epoch 3 (external site) · Kaia Marketing Team, Kaia blog (blog.kaia.io) — CR Mission 1 完全ガイド:預け入れ、ステーキング、報酬の獲得 (external site)
-
Metis reported its Hybrid Rollup live on devnet
Metis reported its Hybrid Rollup deployed on devnet with validity-proof verification. The article said the code supported conventional and post-quantum cryptographic paths while initially enabling the conventional path. A testnet stage was planned for the first quarter of 2027; mainnet timing was not stated. The source did not establish completed post-quantum protection or a mainnet activation.
- Proposal:testnet planned for Q1 2027; later mainnet stages described
- Implementation:Hybrid Rollup deployed on devnet; conventional cryptographic path initially enabled
- Release:devnet deployment reported 2026-11-11; stable mainnet client release not stated
- Activation:devnet running as reported 2026-11-11; no mainnet activation established
Source: Metis — The Metis post-quantum Hybrid Rollup Goes Live on Devnet (external site)
-
NEAR released nearcore 2.14.1 to fix node crash and denial-of-service flaws
NEAR published nearcore 2.14.1 as a security upgrade for mainnet and testnet. Its release notes said critical flaws could cause node crashes or denial of service and called for prompt operator upgrades. The release did not include a protocol or database upgrade.
- Implementation:security fixes included in nearcore 2.14.1
- Release:released 2026-11-11
- Activation:takes effect per node when upgraded; operator adoption not observed
-
Optimism governance approved Upgrade 21 for OP Mainnet's L1 contracts
The Upgrade 21 vote showed optimistic approval, and its proposal included OP Mainnet in the L1 contract changes. The scope covered pause and lockbox consistency, withdrawal handling and contract-management changes. November 16 was a conditional execution target. The opened pages did not confirm execution, and this preparation upgrade did not itself activate interoperability.
- Type:Upgrade
- Proposal:Optimistically approved
- Release:Contract upgrade described
- Activation:Execution not confirmed
Sources: Optimism Agora — Upgrade 21: Interop Readiness (external site) · Optimism governance forum — Upgrade 21: Interop Readiness (external site) · Optimism documentation — Upgrade 21 (external site)
-
Scroll reported an emergency replacement of its bundle-proof verifier
Scroll reported that it registered a corrected verifier for batch version 10 on 10 November after a 3 November bug-bounty report. The previous wrapper could route proof-supplied input to an unintended verification function. The team said its review found no exploitation on mainnet.
- Implementation:verifier wrapper corrected
- Release:incident report published 2026-11-11
- Activation:corrected verifier registered on mainnet 2026-11-10, according to the report
-
Symbol released Catapult v1.0.3.10 with a VRF validation fix
Symbol published Catapult Client v1.0.3.10 with a breaking-fork fix for verification accepting proofs made with an invalid VRF public key. The notes said rejection would apply at the strictVrfPublicKeyCheck fork height. They did not supply a numeric height, scheduled date or completed activation. The release also addressed finalization synchronization and memory-safety problems.
- Implementation:VRF validation and other node fixes included
- Release:Catapult Client v1.0.3.10 released November 11, 2026
- Activation:fork height named but numeric height, date and completed activation not stated
Source: Symbol (GitHub) — symbol/symbol releases (external site)
-
Etherlink activated the 7.3 security kernel upgrade
Etherlink's official upgrade history reported that version 7.3 went live on November 11 through fast kernel governance. The team had announced security patches to the Ganesha kernel on November 9 and said the upgrade carried no new features. The history confirmed activation; the opened sources did not disclose the patches' technical root causes.
- Proposal:fast-governance submission announced 2026-11-09 for 2026-11-10
- Implementation:security patches included in Etherlink kernel 7.3
- Release:the proposal did not publish patch details ahead of the vote
- Activation:activated on Etherlink mainnet 2026-11-11 according to the official upgrade history
Sources: Etherlink documentation — Kernel upgrades (external site) · Nomadic Labs, Trilitech and Functori / Tezos Agora — Etherlink 7.3 — undisclosed security upgrade via Fast governance on Tuesday, November 10th (external site)
-
Unichain's Upgrade 21 contract proposal received optimistic approval
Optimism governance showed approval for Upgrade 21, whose contract execution scope included Unichain. The proposal covered withdrawal handling, pause and lockbox consistency, and contract-management changes. Its notice retained a conditional November 16 execution target. The sources opened did not confirm completed execution, and the upgrade did not itself activate interoperability.
- Proposal:optimistic approval shown by governance
- Implementation:contract changes specified in Upgrade 21
- Release:not stated in the sources opened
- Activation:November 16 conditional target; execution not confirmed
Sources: Optimism Agora — Upgrade 21: Interop Readiness (external site) · Optimism governance forum — Upgrade 21: Interop Readiness (external site) · Optimism documentation — Upgrade 21 (external site)
-
Cosmos Hub proposed a Gaia v29.1.0 mainnet upgrade
Cosmos Hub published a conditional plan to upgrade to Gaia v29.1.0 at height 33,935,300, estimated for 18 November at 12:40 UTC, with proposal 1061 voting scheduled to end on 17 November at 12:00 UTC. The released client restored decoding of historical governance proposals and related queries and exports. The opened notice did not establish proposal passage or activation.
- Release:stable Gaia v29.1.0 published 2026-11-09
- Activation:conditional upgrade at height 33935300, estimated 2026-11-18 at 12:40 UTC; proposal result and activation not confirmed
Sources: Cosmos Hub software-upgrade forum — Gaia v29.1.0 Software Upgrade (external site) · cosmos/gaia maintainers — Gaia releases (external site)
-
Injective scheduled a conditional safeharbor.5 mainnet upgrade
The November 10 guide scheduled v1.20.4-safeharbor.5 for height 191,270,000, estimated November 11 at 12:30 UTC, subject to expedited proposal 714 passing. It required upgraded binaries across mainnet node infrastructure. The pages opened did not establish the vote's result or successful activation.
- Proposal:Subject to proposal 714 passing; result not established.
- Implementation:Upgrade procedure documented for height 191,270,000.
- Release:v1.20.4-safeharbor.5 released November 10.
- Activation:Estimated November 11, 12:30 UTC; activation not established by the sources opened.
Sources: Injective Labs / Injective Docs — Upgrade to v1.20.4-safeharbor.5 (external site) · InjectiveFoundation/injective-core on GitHub — injective-core releases (external site)
-
Ronin opened voting on revised RGP-1 and updated its governance process
Ronin reported that revised RGP-1 had entered a 14-day governance vote after discussion, holder confirmation and team review. Voting power used balances at the publishing snapshot, and the announced closing time was 24 November at 10:00 UTC. The team also described a simplified five-phase process and extended voting from seven to fourteen days. The opened news sources did not state a passed or failed result or completed execution.
- Proposal:revised RGP-1 entered a 14-day vote; result not stated in the sources opened
- Implementation:proposal execution remained conditional on the vote; completion not confirmed
- Release:not a software-release event
- Activation:vote announced open 2026-11-10, scheduled to close 2026-11-24 at 10:00 UTC; no approval or execution claimed
Sources: Ronin Network / Ronin's Newsletter — RGP-1: The vote is LIVE! (external site) · Ronin blog — Ronin Governance (external site) · Ronin Network / Ronin's Newsletter — RGP-1: Putting the Treasury to Work! (external site)
-
Sei required v6.7.4 for RPC nodes to correct historical traces
The release made historical debug traces load the full validator set. Its notice required the update for RPC nodes and recommended it for mainnet validators and node operators. It specified no governance proposal or coordinated chain halt.
- Implementation:Historical traces loaded the full validator set.
- Release:v6.7.4 released November 10.
- Activation:Per-node update; no coordinated chain halt.
Source: Sei Protocol contributors — sei-chain releases (external site)
-
SKALE Foundation promoted Fabio Tomaschett to president
The SKALE Foundation announced Fabio Tomaschett's promotion from Vice President of Business Operations to President. The notice assigned him responsibility for Foundation strategy and collaboration with developers, validators and other partners.
- Implementation:promotion to Foundation president announced
- Release:Foundation announcement published 2026-11-10
- Activation:promotion announced as current; a separate effective date was not stated in the sources opened
Source: SKALE Network / SKALE Foundation — Introducing Fabio Tomaschett, SKALE President (external site)
-
World Chain released v2.8.2 with TLS and DNS security fixes
World Chain described v2.8.2 as a patch release with TLS and DNS dependency security fixes. It updated Rustls and Hickory dependencies and locked reviewed dependency versions into native builds. Its notes said existing nodes needed an upgrade and restart to use the fixes, without configuration changes.
- Implementation:updated TLS and DNS dependencies in v2.8.2
- Release:released 2026-11-10
- Activation:per-node software update; no network activation claimed
-
ZKsync executed proposals transferring Guardian governance roles to the Foundation
ZKsync's official voting pages marked ZIP-19 executed on 10 November and its TPP-20 and GAP-7 companions executed on 13 November. The package removed Guardian governance powers, transferred veto and fallback roles to the Foundation, and requested dissolution of the Guardian entity. Governor execution did not itself establish completion of the entity's legal dissolution or every downstream L1 upgrade stage.
- Proposal:ZIP-19, TPP-20 and GAP-7 passed
- Implementation:governor actions executed for the role-transfer package
- Release:governance execution recorded 2026-11-10 and 2026-11-13
- Activation:governor execution established; downstream L1 stages and legal dissolution not independently established
Sources: ZKsync governance / Protocol Governor — [ZIP-19] Dissolve the ZKsync Guardians (external site) · ZKsync governance / Token Governor — [TPP-20] Remove Guardian Powers from the Token Governor (external site) · ZKsync governance / GovOps Governor — [GAP-7] Remove Guardian Powers from the GovOps Governor (external site)
-
Arweave's arweave.net gateway was reported running PermawebOS TEE nodes
HyperBEAM's compatibility release stated that arweave.net was running PermawebOS TEE nodes backed by v0.11.1. It supplied a v0.9-series compatibility update for nodes interacting with that gateway. This established the reported gateway software state by November 9; the actual cutover date and any Arweave consensus change were not stated.
- Implementation:arweave.net reported on v0.11.1-backed PermawebOS TEE nodes
- Release:HyperBEAM v0.9.1 compatibility release published November 9, 2026
- Activation:gateway state reported by November 9; precise cutover date not stated
Source: permaweb (GitHub) — HyperBEAM releases (external site)
-
Cronos disclosed an app-side mempool security issue
Cronos disclosed that a crafted transaction could disrupt nodes using the app-side mempool and cause disagreement over block results. The v1.8.2 notes described admission, gossip, recheck and block-result fixes and said all validators needed the update. GitHub marked v1.8.2 as a prerelease; a stable release and actual adoption were not established.
- Implementation:mempool and block-result fixes described in v1.8.2
- Release:published as prerelease 2026-11-09; stable release not established
- Activation:rolling update specified without a governance height; adoption not stated
Source: crypto-org-chain/cronos on GitHub — v1.8.2 (external site)
-
Injective required the bl.3 binary after an emergency upgrade exercise
Injective's operator notice said its November 9 readiness exercise completed and normal operations resumed. It required mainnet operators to install v1.20.4-bl.3 to avoid an AppHash mismatch, with new consensus rules enforced after height 191,016,661. The notice described a binary replacement and restart without an upgrade handler.
- Implementation:Binary replacement; no upgrade handler.
- Release:v1.20.4-bl.3 released November 9.
- Activation:Team reported exercise completed and rules enforced after height 191,016,661.
Sources: Injective Labs / Injective Docs — Emergency upgrade to v1.20.4-bl.3 (external site) · InjectiveFoundation/injective-core on GitHub — injective-core releases (external site)
-
Osmosis approved the corrected rate-limiter migration after an execution failure
Proposal 1058 failed at execution after its migration message was encoded incorrectly. The corrected proposal 1062 passed on November 9 with no failure reason in the governance response. It migrated the rate-limiter contract, adding optional absolute limits, correcting forwarded-token handling and tightening administrative validation. Individual absolute limits still required separate decisions.
- Proposal:Proposal 1058 failed; corrected proposal 1062 passed November 9.
- Implementation:Migration message corrected; absolute limits and administrative validation implemented.
- Release:Contract bytecode supplied through proposal 1062.
- Activation:Proposal 1062 passed with no execution failure recorded; individual absolute limits required separate decisions.
Sources: Osmosis on-chain state via Osmosis public REST endpoint — Osmosis governance proposals, newest 200 (on-chain query) (external site) · Osmosis Community Hall / JohnnyWyles — IBC Rate Limiting v3 - Upgrade contract (external site)
-
Polkadot executed Snowbridge's security upgrade instruction
Polkadot OpenGov executed referendum 1964 successfully on November 9. Snowfork's proposal described security hardening from a bug bounty program and an instruction to upgrade the Ethereum gateway with a new implementation and BeefyClient. The opened evidence established governance execution; its fork-test results did not establish completion on production Ethereum.
- Proposal:referendum 1964 successfully executed November 9
- Implementation:new gateway implementation and BeefyClient described; fork tests reported
- Release:upgrade implementation linked in the proposal
- Activation:Polkadot instruction executed; downstream production Ethereum activation not confirmed
Source: Polkadot OpenGov via Subsquare — Upgrade Snowbridge Gateway Contract (external site)
-
Waves required node 1.6.5 after reporting a mainnet rollback
Waves published node version 1.6.5 as a mandatory update for all nodes. The release notice reported that mainnet had been rolled back to block 5,481,020 and identified the next block on the correct chain. It supplied manual rollback steps for operators. The cause, duration and extent of network recovery were not stated.
- Implementation:mandatory node version 1.6.5 published with rollback instructions
- Release:released 2026-11-09
- Activation:mainnet rollback to block 5481020 reported by the release; exact time and recovery completion not stated
Source: wavesplatform/Waves — Version 1.6.5 (Mainnet + Testnet + Stagenet) (external site)
-
XRP Ledger scheduled Testnet and Devnet resets for November 25
The XRP Ledger team scheduled Testnet and Devnet resets for November 25, 2026 after Testnet's full-history server crashed. The notice said both networks' ledger data would be deleted and Testnet amendment statuses restored to match Mainnet. Mainnet was outside the reset's scope. The resets had not occurred by the research cutoff.
- Implementation:history-server storage upgrade described
- Release:not stated in the sources opened
- Activation:Testnet and Devnet reset scheduled November 25, 2026; not yet completed
Source: XRP Ledger — Upcoming Testnet and Devnet Resets (external site)