The profile review date applies to the whole profile. 20 individual fields have no separately recorded review date.
Summary
Horizen is an OP Stack rollup on Base using Caldera infrastructure. Its sequencer orders and executes transactions; batches let full nodes rebuild state from Base. Architecture docs describe optimistic state proposals, a trusted multisig rejection path and open fault-proof games. Their deployed settings and upgrade authorities are unverified. The legacy proof-of-work chain's July 2025 migration fork blocked ordinary transactions; ZEN balances became claimable on Base. 3451620212223
Design
Layer
Layer 2
Ledger structure
Chained blocks
Participation
Other
Class note
Horizen Mainnet (chain ID 26514) is an OP Stack rollup settling to Base, which settles to Ethereum; Horizen calls this a Layer 3. ETH pays gas. ZEN is an ERC-20 token on Base and an OFT token on Horizen. A dedicated sequencer orders transactions. Operating status: the current mainnet is live; the legacy chain stopped propagating user transactions at block 1,807,300 in July 2025.
Settles to
BaseHorizen settles to Base, which settles to Ethereum. Sequencer confirmation, batch inclusion, host finality and bridge withdrawal are distinct stages. Canonical ETH withdrawals to Base take at least seven days and require a claim transaction. Base's own batch-finality estimate is not a measured Horizen finality time.
Settlement family
Ethereum / EVM
Scarce resource
Other
State model
Accounts
Finality
Other
Who makes blocks
One sequencer. Horizen's docs describe a dedicated sequencer node, and the public RPC endpoint is hosted on Caldera infrastructure, but the reviewed pages do not name who holds the sequencer, proposer or contract-upgrade keys. Miners of the old proof-of-work chain no longer include user transactions.
Fork choice
No open fork choice on Horizen itself: the canonical chain is derived from batch data posted to Base, so Base's ordering, and through Base, Ethereum's finality, govern it. Horizen's docs say a trusted multisig can reject initial state proposals and that disputes are otherwise settled by interactive onchain fault-proof games open to anyone; this review did not confirm the live contract settings, the multisig members or who may propose.
Qualifications
Scarce resource · Not applicable. Recorded as other. Horizen uses dedicated sequencing rather than a local mining or validator-stake competition. ZEN holders can deposit into the Horizen team's reward contract, whose sources include sequencer fees; this does not select block producers.
Finality · Partial. Recorded as other. Horizen uses optimistic rollup settlement: sequencer confirmation is followed by batch derivation and settlement on Base. Canonical withdrawals wait at least seven days. The reviewed sources do not establish the deployed proof settings or a measured end-to-end finality time.
Data availability · Contested. Horizen's pages disagree in wording: the Layer 3 page and the Caldera announcement say data goes to Base, while the general architecture page says batches go to Base as calldata or, if configured, as blobs, and in another section that batches are recorded in Ethereum blobs. The reading most consistent with a Layer 3 is that Horizen posts to Base and Base posts to Ethereum; this is an inference, not a Horizen statement.
Proof system · Unknown. Horizen's architecture describes both a trusted multisig rejection path and open fault-proof games. Its token-address directory does not identify the Base rollup contracts or their upgrade authorities. The deployed proof settings, signers and forced-inclusion path remain unverified.
Chain level privacy · Partial. Horizen's base chain does not provide confidential computation. Tachyon's beta mainnet bridge offers opt-in private transfers using solvers and trusted hardware. Vela v0.2.0 is deployed on Base Sepolia and Horizen testnet; a mainnet release remains on its roadmap.
Operating status · Partial. Horizen Mainnet is live on Base. The legacy zend v6.0.0 fork stopped propagating ordinary transactions at block 1,807,300 in July 2025 while allowing coinbase transactions and certificate processing. ZEN balances migrated to Base; this is not continuation of the old chain's transaction history.
Participation · Unknown. Recorded as other. Horizen documents a dedicated sequencer on Caldera infrastructure, but does not name the party that admits sequencers or holds the proposer and upgrade keys.
Tradeoffs
This view follows one way of thinking about design priorities, often called the blockchain trilemma. The design-priorities lesson sets out the counter-view. Read the design-priorities lesson.
Emphasizes
Scalability Contested
Gives up
A dedicated sequencer orders transactions. Settlement depends on Base, Ethereum and Horizen's proof and upgrade arrangements. The live proof settings, sequencer operator and upgrade-key holders remain unverified. Canonical ETH withdrawals to Base take at least seven days plus a claim transaction.Horizen's current architecture material presents inherited security as a benefit, so this reading is contested. Security is not added as a priority until the deployed host verification is established. Privacy is application-specific: Tachyon offers a beta bridge using trusted hardware; Vela remains on testnets.
Full node at home
Unknown 45No published minimum hardware or operator guide for a Horizen Mainnet full node was found. The architecture describes replaying batch data from Base, but does not establish that operators must also run their own Base node. Legacy zend requirements do not describe this rollup.
Throughput claims
No classified figure recorded
Scaling layers
No scaling layer recorded in this profile.
Capabilities
Capabilities of Horizen: how each one is provided, or its research status
Capability
How it is provided
Notes and sources
Account abstraction
Independent softwareLimited scope
Safe accounts through Den are listed for Horizen Mainnet. Safe's owner and threshold changes preserve the account address and are provided by independent Safe/Den software. The reviewed Horizen sources do not establish mainnet EIP-7702 activation. Limited: opt-in; only accounts created as contract accounts gain changeable rules, and an ordinary account's key cannot change this way. 1533
Atomic swaps
Unknown
Building blocks only: EVM contracts can express conditional swaps. Garden and STON.fi do not show Horizen in their reviewed mainnet routes. Tachyon documents a solver-based bridge, without a verified Horizen atomic-swap mechanism satisfying this row. 4254346
Authenticated data publication
Unknown
Building blocks only: EVM contracts can hold data. Stork documents submitting signed feed values and reading verified values from its contract; that is data held in chain state, excluded by this row. Horizen's own batch publication belongs to its host's data service. No qualifying user publication-and-retrieval workflow was established. 442
Light clients
Unknown
The architecture describes full nodes replaying batches from Base. No maintained Horizen Mainnet light-verification implementation was found; full-node derivation and token-bridge messaging do not establish this capability. 4
Native staking or delegation
Not present
Horizen has no protocol staking or delegation: a dedicated sequencer orders transactions, and ETH, the gas asset, is not bonded for it. The nearest feature is the ZEN staking program: holders deposit the ZEN token in a HorizenOfficial reward contract and can withdraw at any time. ZenIP-42408 says it is not required for validator security, and rewards are top-ups from the DAO, ecosystem sources and sequencer fees sent by admin-authorized notifiers, which can change or stop. These are program rewards, not protocol rewards. 434353637
On-chain governance
Not present
Horizen has no on-chain vote that the protocol enacts or makes binding. The nearest feature, Horizen DAO voting on ZenIPs, runs in Snapshot spaces; Snapshot describes its voting as off-chain and gasless. After a vote passes, the Foundation's directors review the ZenIP and the Foundation implements it, so neither the vote nor its result is recorded or enforced on-chain. 283839
Parallel execution
Unknown
Building blocks only: Horizen documents an EVM engine and dedicated sequencer, but does not identify a production client configuration executing transactions against shared state concurrently. General EVM compatibility alone does not establish parallel execution. 4
Payment or state channels
Unknown
Building blocks only: the EVM can host channel contracts. Tachyon's 'settlement channels' describe a solver-based private bridge, without a verified channel opening, update and dispute lifecycle on Horizen. Yellow's published production matrix does not list Horizen. 42547
Programmable spending
Built into the protocolFull scope
Horizen's EVM executes Solidity contracts and their spending conditions on mainnet. 24
Protocol-verified messaging
Built into the protocolLimited scope
The canonical OP Stack bridge verifies deposits from Base and supports ETH withdrawals back to Base. Scope is limited to that route; the deployed proof configuration and upgrade authorities remain unverified. Stargate's separate messaging network and Tachyon's solver route are recorded under bridges. 410
Reversible transfers or recovery
Unknown
Building blocks only: EVM contracts permit delays and recovery logic. Safe/Den owner changes are account control; local RecoveryHub availability is unverified. Tachyon advertises refunds of pending bridges one hour after auction end, but its refund page could not be read. The contract, refund authority and a Horizen-side reclaim path were not established. 154145
Rollups
Unknown
No live rollup settling to Horizen was verified in its architecture or ecosystem directory. Horizen itself settles to Base. Vela is a confidential-compute coprocessor on testnets, not a documented mainnet rollup settling here. 31940
Shielded transfers
Independent softwareLimited scope
Tachyon provides opt-in private transfers between Base and Horizen mainnet through its beta bridge. Encrypted intents and trusted execution hardware conceal transfer relationships; solvers execute the route. This is independent Tachyon software, limited to the supported route and assets, with hardware trust. Vela remains on testnets. 25264041
Signed partial offers
Unknown
Building blocks only: EVM signature checks can support order contracts. ZENDEX is listed as coming soon, and the reviewed 1inch deployments do not list Horizen. No live implementation was verified that lets any taker settle a maker's signed offer atomically without prior escrow or a pool holding the maker's funds. 4192944
Reading these values
How this feature is provided
Built into the protocol, core-team software or independent software says where a feature lives and who can change it. These are implementation layers, not quality: core-team software is not closer to the protocol than independent software.
Structured assessment pending
The shared review has not assessed this feature for any chain yet. That does not mean it is absent, and a chain’s profile may already describe it.
Unknown
The review has not established this for this chain under the current definition; the note beside it says why. Unknown is not absent and not a low score. A feature reads “Not present” only when a source shows it is absent.
Reading across rows
The list of capabilities is incomplete. Do not read these rows as a chain leading or lagging overall.
The 30 September 2026 dataset has no DEX volume or exchange-deposit measure for Horizen Mainnet (26514); its Horizen EON entry is the retired chain. ZENDEX remains marked coming soon. Base liquidity for ZEN does not establish an exchange on Horizen. 192948As of Oct 11, 2026.
Issuer-native stablecoins
Unknown
Changed from none: the 30 September dataset reports US$3,248 of USDC under 'Horizen L3', with no chain ID to confirm the match. Horizen documents USDC.e as bridged from Base, not Circle-issued. This does not establish an issuer-native coin or prove chain-wide absence. 84950As of Oct 11, 2026.
Algorithmic stablecoins
Unknown
The 30 September snapshot's tentative 'Horizen L3' match lists USDC only. Horizen's documented USDC.e is a bridged issuer-backed asset, and cbBTC tracks Bitcoin rather than a stable unit. No live algorithmic or hybrid pegged coin was verified in the ecosystem directory. 891949As of Oct 11, 2026.
Horizen documents the canonical ETH route to Base, Stargate token routes and Tachyon's beta Base–Horizen bridge. Independent Stargate and Tachyon services establish bridge availability. Control of canonical verification and upgrades is unverified, so the protocol-control value is not established. Risk: Canonical ETH withdrawals take at least seven days plus a claim; live proof settings, multisig members and upgrade authority remain unverified. Stargate routes add LayerZero messaging and token-adapter risks. USDC.e is not Circle-issued; cbBTC also depends on Coinbase custody. Tachyon uses solvers and trusted hardware and remains beta software. Targeted searches found no verified incident affecting these named routes in the preceding 12 months; that is not a safety assurance. 48910112526As of Oct 11, 2026.
Block explorers
First-partyHorizen Explorer (explorer.horizen.io)
Horizen's docs say Horizen provides the mainnet and testnet block explorers, powered by Caldera. The mainnet explorer's public API served current block and transaction data on 12 October 2026. No second explorer operator was found. Explorer indexes are provider data, not consensus. 121327As of Oct 12, 2026.
Hardware wallets
ThinLedger (MetaMask or Rabby), Trezor (MetaMask or Rabby)
Third-party wallet paths are documented for Ledger and Trezor. Native Ledger Wallet or Trezor Suite support specifically for Horizen Mainnet was not established; Trezor's coin page lists Base and Horizen without mapping each network to a wallet app. 1531As of Oct 11, 2026.
Hardware-wallet custody
Hardware-wallet custody for Horizen
Device maker
Status
What users can and cannot do
Ledger
Through an intermediaryMetaMask or Rabby (third-party wallet apps)Same as native: Unknown
Can: Sign Horizen Mainnet transactions with a Ledger using MetaMask or Rabby as the interface, per Horizen's wallet docs Can: Claim migrated ZEN from the old chain by signing a message with the Horizen device app (v2.4.1 or later) and Horizen's Ledger signing tool, per Horizen's migration docs Cannot: Native Ledger Wallet management of Horizen Mainnet was not verified.Horizen documents Ledger through MetaMask or Rabby for its EVM mainnet. Its separate Ledger signing tool is for claiming legacy ZEN balances on Base. The vendor product page and network-code source could not be read, so they do not support a native-application absence claim.1518As of Oct 11, 2026.
Trezor
Through an intermediaryMetaMask or Rabby (third-party wallet apps named by Trezor)Same as native: Unknown
Can: Use Trezor Safe 3, Safe 5 or Safe 7 through the MetaMask or Rabby paths listed on Trezor's Horizen page. Cannot: Native Trezor Suite management specifically for Horizen Mainnet was not verified.Trezor lists ZEN, Base and Horizen and names Suite, MetaMask and Rabby. It does not map each network to each app. The current network-code source was unreadable, so the earlier categorical claim that Suite excludes Horizen is removed.3132As of Oct 11, 2026.
Public data
iKnow Blockchain has no public-data lookups for Horizen yet. This is a limit of the service, not a statement about the network.
Public-data lookups for Horizen
Lookup
Status
What it covers and its limits
Address or account
Not available yet
Public chain reads are not implemented for this chain in this build.
Tokens and assets
Not available yet
Public chain reads are not implemented for this chain in this build.
NFTs
Not available yet
Public chain reads are not implemented for this chain in this build.
Transactions
Not available yet
Public chain reads are not implemented for this chain in this build.
A lookup covers one address or transaction from one provider. It is never a complete wallet, and an error or private value is reported as unknown, not zero. About public data · Connect your AI
Sourced developments
Publication dates and individual review dates are kept apart. An unknown date remains unknown.
Publication date · newest first
Published ProtocolVerified against sources
Horizen confirmed that its L3 network had been decommissioned
Horizen's November 6 update confirmed that L3 decommissioning had completed on November 5. Its original October 23 notice announced migration of the ecosystem to Base and a November 4 bridging cutoff. The update said final migration activities and return of remaining balances continued; it did not confirm that all returns were complete.
Implementation:Horizen L3 decommissioned; ecosystem transition to Base announced
Release:shutdown notice published 2026-10-23; completion update 2026-11-06
Activation:L3 decommissioning completed 2026-11-05; final migration activities continued
Date basis: Explicit November 6, 2026 update confirmed November 5 completion; original shutdown announcement was published October 23.
Record review:Reviewed Nov 17, 2026Next review due Dec 17, 2026.
Published FoundationProposed, not adopted
Horizen announced the wind-down of its L3 staking program
Horizen's October 23 notice announced the end of its L3 staking program, set October 25 as the end of L3 staking rewards, and planned a replacement on Base. The November 6 update confirmed the L3's November 5 decommissioning. The sources opened did not confirm that replacement staking on Base had launched.
Proposal:replacement staking on Base planned in the October 23 notice
Implementation:existing L3 staking program winding down; replacement launch not confirmed
Activation:L3 reward end scheduled 2026-10-25; L3 decommissioned 2026-11-05; Base staking launch not stated
Date basis: October 23, 2026 notice set the staking wind-down; November 6 update confirmed L3 decommissioning on November 5. First recorded as live from the July 24 staking guide.
Correction history was not recorded for this historical item.
Record review:Reviewed Nov 17, 2026Next review due Dec 17, 2026.
Published ProtocolVerified against sources
Repository for the retired proof-of-work client archived
The HorizenOfficial/zen repository, home of the client for Horizen's former proof-of-work chain, was archived and made read-only; its notice says vulnerability reports are no longer accepted and points to the current Horizen docs.
Implementation:repository archived
Release:final release was zend 6.0.0 (1 July 2025)
Activation:archived 4 August 2026
Date basis: GitHub banner: archived by the owner on Aug 4, 2026.
Correction history was not recorded for this historical item.
Record review:Review overdueReviewed Oct 18, 2026; next review was due Nov 18, 2026.
Published ProductVerified against sources
Horizen Labs opened Vela confidential compute to developers
Horizen Labs named its confidential-compute environment Vela and released it as a local development kit, with dedicated testnet instances on request. Vela's docs now describe version 0.2.0 on Base Sepolia and Horizen testnet, and its roadmap names Base mainnet as the next milestone.
Implementation:version 0.2.0 released
Release:local development and testnets
Activation:not on mainnet as of this review
Date basis: Horizen Labs' own Medium announcement visibly carries 16 March 2026. Deployment status rechecked against current Vela docs on 11 October 2026.
Correction history was not recorded for this historical item.
Record review:Review overdueReviewed Oct 18, 2026; next review was due Nov 18, 2026.
Published ProtocolVerified against sources
Horizen Mainnet launched as a Layer 3 on Base
Horizen launched its OP Stack mainnet settling to Base, run on Caldera's rollup service, completing its move from a standalone proof-of-work chain. ZEN had already migrated to Base as an ERC-20 in July 2025.
Implementation:mainnet deployed
Release:Released
Activation:live since 9 December 2025
Date basis: Horizen's launch post, which says Horizen has officially launched its mainnet on Base, shows 9 December 2025 on its byline and in its publication metadata; Horizen's 2025 recap also cites the launch.
Correction history was not recorded for this historical item.
Record review:Review overdueReviewed Oct 18, 2026; next review was due Nov 18, 2026.
Automatic headlines
These saved automatic records have not received an editorial review.
No automatic headlines are available to display.
Source checks
Current source-check information is unavailable. Saved records retain their original publication and review dates.
Topics your AI can explain
Your AI can explain these topics for Horizen through the connection, with sources.
What Horizen is today
From a proof-of-work chain to Base: the 2025 migration
Who orders transactions and what secures Horizen
From UTXOs to accounts: Horizen's state model
Fees and units on Horizen
When is a Horizen transaction final?
Privacy on Horizen: opt-in tools, not a shielded chain
ZEN governance and staking
Education
The complete recorded explanations are available here with their sources and individual review evidence.
What Horizen is today
Record review:
Horizen is an EVM-compatible OP Stack rollup on Base, which settles to Ethereum; Horizen calls it a Layer 3. Mainnet was live by the end of 2025. ZEN has 18 decimals and a maximum supply of 21 million, and is used for governance, rewards and applications. ETH pays gas.
Horizen Mainnet uses chain ID 26514 and lists ETH as its currency. Its public RPC endpoint uses Caldera infrastructure, and Horizen identifies Caldera as its rollup infrastructure partner.
ZEN's Base contract is 0xf43eB8De897Fbc7F2502483B2Bef7Bb9EA179229. Its official source uses 18-decimal token units and caps supply at 21 million ZEN. The smallest unit is 10 to the minus 18 of a ZEN; the cap is not a statement of current circulating supply.
ZEN reaches Horizen through Stargate using LayerZero's token standard. On Horizen, ZEN is a token contract at 0x57da2D504bf8b83Ef304759d9f2648522D7a9280; Horizen's docs list the same address for the adapter contract on Base that locks ZEN while it is bridged. ZEN held on Base and ZEN held on Horizen sit on different chains, and moving between them costs a bridge fee.
The same name used to mean a separate proof-of-work chain forked from Zcash in 2017. That chain stopped accepting user transactions in July 2025, and old ZEN became claimable one for one on Base.
Horizen presents privacy as an application choice. Tachyon provides a beta private bridge using trusted hardware; Horizen Labs' Vela confidential-compute platform remains on testnets.
Common misunderstandings
ZEN is not Horizen's gas token; transactions on Horizen pay fees in ETH.
Horizen is no longer its own proof-of-work Layer 1, even though older guides and exchange listings may still describe it that way.
Limits
Horizen's documentation is recent and some pages disagree in detail (for example on where rollup data is stored); confirm specifics, especially contract addresses, in the current docs before sending funds.
Correction history was not recorded for this historical item.
From a proof-of-work chain to Base: the 2025 migration
Record review:
Horizen's legacy proof-of-work chain began in 2017; EON was a later EVM sidechain. In 2025 the project moved ZEN to Base. The migration fork at block 1,807,300 on 23 July stopped ordinary transactions on the legacy mainchain, and eligible ZEN balances became claimable one for one as an ERC-20 token.
zend 6.0.0 was the final mainchain release. Its migration fork stopped propagation of ordinary transactions after block 1,807,300 while allowing coinbase transactions and certificate processing. The release scheduled software deprecation at block 1,872,068, around 13 November 2025.
EON 1.5 stopped transfers back to the mainchain and supported balance export. Ordinary externally owned accounts and their directly delegated stakes migrated to the same Base addresses. Smart contracts, balances locked in contracts and stakes delegated by contracts were excluded.
Old main-chain balances need a manual claim, because a Horizen UTXO address is not an Ethereum address. Holders prove ownership by signing a message with the old key; Horizen says there is no claim deadline.
An authorized Horizen admin address loaded the balances into vault contracts on Base, and a cumulative hash let third parties check the loaded data against the snapshot.
ZenIP 42409 reallocated the remaining 5 million unmined ZEN to ecosystem budgets. The approved plan made 25% available at migration and vested the remainder over 48 months. The token cap stays at 21 million; migration contracts mint balances and allocate the remaining supply when the vaults finish.
The old chain had already disabled its Zcash-derived shielded pool in a February 2024 hard fork (zend 5.0.0), and the zend repository was archived on 4 August 2026.
Common misunderstandings
The migration was not a lock-and-mint bridge: balances were recreated on Base from a recorded state of the old chains.
Eligible unclaimed mainchain balances are represented in the claim vault; a successful ownership claim transfers the corresponding ZEN to its recipient.
Limits
Users had to trust the admin that loaded balances; the hash lets anyone check the result but not force the loading.
Exchange-held balances, multisig claims and wallet-specific claim steps are not covered here.
Correction history was not recorded for this historical item.
Horizen uses a dedicated sequencer to order and execute transactions, with full nodes deriving state from batches posted to Base. Its architecture describes optimistic proposals, a multisig rejection path and fault-proof games. The deployed proof configuration remains unverified. Settlement depends on Base, Ethereum and Horizen's own contracts and upgrade arrangements.
The sequencer is a single dedicated node. The reviewed Horizen pages do not say who holds its key, who may post state proposals, or who can upgrade the rollup contracts on Base.
Horizen's docs describe two dispute paths: a multisig of trusted parties can reject an initial proposal if a threshold of them attests that it is invalid, and anyone can submit a fault proof through interactive onchain games that narrow a disagreement down to one step. This review did not check the live contract settings or who sits on the multisig.
Base is itself a rollup with its own sequencer and proof system, so an outage or fault on Base also affects Horizen.
ZEN staking pays rewards through a non-custodial contract. Current sources include DAO funding, liquidity earnings, zkVerify-related emissions and Horizen sequencer fees. Stakers do not choose or validate Horizen blocks.
The legacy mainchain used proof of work. The current Horizen architecture assigns ordering to a dedicated sequencer, whose operator and admission process were not established by the reviewed pages.
Common misunderstandings
Staking ZEN does not secure Horizen's block production.
Anchoring to Base and Ethereum protects against invalid state only if disputes work, and it does not by itself stop a single sequencer from delaying or censoring transactions; no escape path was documented in the reviewed pages.
Limits
The Base rollup-contract addresses, deployed proof settings, rejecting multisig members, sequencer operator and upgrade authorities remain unverified. No published Horizen Mainnet node-hardware minimum was found.
Correction history was not recorded for this historical item.
Horizen uses an account-based EVM: addresses have ETH balances, contracts keep storage, and transactions update state. Its legacy mainchain recorded spendable value as unspent transaction outputs. The migration maps eligible historical balances into the new token system.
In an unspent-output model a wallet balance is the sum of separate unspent outputs. A payment spends whole outputs and usually creates a change output back to the sender; there is no stored per-address balance.
On Horizen today an ETH balance is a number recorded against an address, and a token balance such as ZEN is a number inside the token's contract; a transfer changes those numbers.
Legacy UTXO addresses cannot be used directly as Base recipient addresses. Holders sign a claim with the old key and specify an Ethereum-format destination; this is an address and claim-format distinction, not evidence of different signature cryptography.
EON, Horizen's former EVM sidechain, already used accounts, which is why its balances could be copied to the same addresses automatically.
Solidity contracts run in Horizen's EVM. Safe accounts through Den can change owners or signing thresholds while preserving the account address; a recovery module on Horizen was not verified.
Common misunderstandings
Horizen is no longer a UTXO chain, even though ZEN's history began on one.
Limits
This description leaves out nonces, contract storage costs and the old chain's script details.
Correction history was not recorded for this historical item.
Horizen fees are paid in ETH. Documentation describes execution costs and a data fee for posting to Base. ZEN uses 18 decimals, bridged USDC.e uses 6 and cbBTC uses 8.
One gwei is one billionth of an ETH, and one gwei equals one billion wei.
The OP Stack software calculates the Base data fee automatically. Horizen says it is usually a small share of the total, but the reviewed docs give no fee schedule, base-fee rule or typical fee level.
To transact you need some ETH on Horizen, normally bridged from Base through the native bridge; ZEN cannot pay gas.
Horizen's docs warn that treating cbBTC (8 decimals) or USDC.e (6 decimals) as 18-decimal tokens produces badly wrong amounts in code and displays.
Bridging has its own costs: Stargate charges 0.06% per transfer plus gas on the source chain.
Common misunderstandings
Holding ZEN on Horizen is not enough to transact there; you also need a little ETH.
Limits
Live fee levels were not measured. The staking service lists sequencer fees as a reward input, but the reviewed sources do not establish how all transaction-fee components are allocated.
Correction history was not recorded for this historical item.
Horizen's sequencer confirmation, batch posting to Base and subsequent host settlement are distinct stages. The reviewed sources do not provide a measured end-to-end finality time. Canonical ETH withdrawals to Base take at least seven days and require a separate claim transaction.
Until its batch reaches Base, a transaction rests only on the sequencer's word; transactions not yet posted could in principle be reordered or dropped.
Base gives an approximate time for its own batches to reach Ethereum finality. That is a host-chain estimate, not a measured minimum or end-to-end finality guarantee for Horizen.
Deposits from Base to Horizen arrive within a few minutes and have no challenge period.
Withdrawals from Horizen to Base take at least 7 days and require returning to the bridge to claim; Horizen's staking guide advises bridging only the ETH needed for gas for this reason.
Third-party routes such as Stargate finish in minutes, but they substitute the bridge's own security model for the rollup's dispute window.
Common misunderstandings
Sequencer confirmation is an early stage; settlement on Base and Ethereum depends on later batch processing.
Limits
The staged description is an inference from Horizen's architecture and Base's documentation, not a Horizen-published guarantee; how Horizen's sequencer handles reorgs was not documented.
Correction history was not recorded for this historical item.
Privacy on Horizen: opt-in tools, not a shielded chain
Record review:
Horizen's base EVM does not supply confidential computation. Applications can add privacy. Tachyon's beta bridge uses encrypted intents, solvers and trusted hardware for private transfers. Horizen Labs' Vela runs WebAssembly applications in AWS Nitro Enclaves; its v0.2.0 deployments remain on testnets.
Vela runs WebAssembly applications in enclaves whose memory the host and cloud provider cannot read; each result is signed by the attested enclave and checked onchain.
Vela's docs say attestation proves which code ran on genuine hardware, not that the application's logic is correct.
Vela's roadmap lists Base mainnet, multi-application support and self-service testnet deployment as next steps. It says one application currently runs per environment. The acceleration-program post describes Vela as early access.
Tachyon, a grant-funded project, launched a beta private bridge between Base and Horizen in May 2026 that uses solvers and trusted hardware to hide the link between sender and recipient.
ZENDEX, a planned private exchange, was listed as coming soon on Horizen's ecosystem page.
Common misunderstandings
The legacy chain's shielded pool was disabled by the 2024 upgrade. Current privacy tools are separate application-level systems.
Trusted-hardware privacy depends on the enclave vendor and its attestation, not on cryptography alone.
Limits
How private any application is depends on its own design; individual applications were not assessed.
Correction history was not recorded for this historical item.
ZEN holders vote on ZenIPs through the Horizen DAO's Snapshot process, followed by Foundation review and implementation. The DAO approved a reward program in March 2026. ZEN staking is now live on Horizen Mainnet; it does not select block producers.
ZenIP 42408 authorized 50,000 ZEN for the first year of rewards, plus up to half of net earnings from DAO-managed liquidity, within a planned four-year, 215,000-ZEN program that needs a new vote each year.
To stake, users bridge ZEN from Base to Horizen through Stargate and hold some ETH on Horizen for gas.
The staking service lists DAO bootstrap funds, DAO liquidity earnings, zkVerify node emissions and Horizen sequencer fees as live reward sources. Additional application fee sharing is onboarding and Vela contributions remain in development.
Horizen's transparency report describes the Foundation as a Cayman Islands entity through which the DAO governs.
Common misunderstandings
ZEN staking is a rewards program; it does not make stakers validators.
Limits
Deposits and withdrawals use the public staking contract; the documented program has no lock-up. Future funding and reward rates are variable, and DAO authorizations require renewal. This check did not audit the contracts.
Correction history was not recorded for this historical item.
Horizen Mainnet block explorer for looking up transactions, blocks, addresses, tokens and verified contracts; a separate testnet instance exists.
Categories
block-explorer
Recorded historical status
live; public API served current mainnet data at review
Inclusion reason
The only explorer Horizen documents for its mainnet.
Limits
A single provider-run index; its data is not independent verification of the chain.
Horizen's block-explorer docs say Horizen provides this mainnet explorer and a testnet instance, powered by Caldera. The explorer's public API returned current block and transaction counts on 12 October 2026.
Correction history was not recorded for this historical item.
The OP Stack bridge between Base and Horizen for ETH, reached through the Horizen Hub: deposits arrive in minutes, withdrawals wait at least 7 days and need a second claim transaction on Base.
Categories
bridge
Recorded historical status
live on mainnet
Inclusion reason
Canonical route for the ETH needed to pay gas on Horizen.
Limits
Depends on Base and Horizen's contracts. Deployed proofs, rejecting multisig membership and upgrade authority remain unverified; canonical ETH withdrawals take at least seven days plus a claim.
Horizen's current bridge documentation identifies hub.horizen.io as the canonical ETH route. The hub resolves, but its interactive contents were not readable; this review relies on the documentation for the route and withdrawal process.
Correction history was not recorded for this historical item.
Private cross-chain transfer service that routes transfers between Base and Horizen through a solver network and trusted hardware so the sender-recipient link is not public.
Categories
bridge, privacy
Recorded historical status
beta live on Base and Horizen mainnet since May 2026
Inclusion reason
Representative privacy tool operating on Horizen Mainnet.
Limits
Beta software that relies on solvers and trusted hardware; not audited in this review.
The bridge interface advertises refunds of pending transfers after a one-hour grace period from auction end. Its refund page could not be read; the refund authority, contract and a Horizen-side reclaim path remain unverified.
Horizen's blog reports Tachyon's beta as live on Base and Horizen mainnet and describes its solver and trusted-hardware design; Tachyon's site describes the same model.
Correction history was not recorded for this historical item.
Confidential-compute platform that runs WebAssembly applications in AWS Nitro Enclaves and posts enclave-signed results onchain.
Categories
privacy, developer-tooling
Recorded historical status
version 0.2.0, experimental; local development and test networks only
Inclusion reason
Documented confidential compute platform for developers; included with its testnet status explicit.
Limits
Not on mainnet at review time; privacy depends on trusting the enclave hardware and attestation.
Vela's docs describe the enclave design, onchain verification of signed results and deployments on Base Sepolia and Horizen testnet; its roadmap names Base mainnet as the next milestone.
Correction history was not recorded for this historical item.
Safe documents owner and threshold changes. Live recovery-module availability on Horizen was not verified, and the interactive wallet was not exercised.
Horizen's supported-wallets page lists Safe via Den at safe.horizen.io.
Correction history was not recorded for this historical item.
Sequencer operator, proposer admission, live fault-proof configuration, rejecting multisig members and contract-upgrade authorities remain unverified; the published directory lists tokens and integrations, not the Base rollup contracts.
Data-availability wording conflicts between Base calldata and Ethereum blobs; no definitive deployed configuration was found.
No published Horizen Mainnet full-node hardware minimum, light client, measured finality stages or forced-inclusion/escape path was verified.
Mainnet EIP-7702 activation and parallel transaction execution are unverified.
Garden, STON.fi, 1inch, Yellow, Safe RecoveryHub and ZENDEX did not establish local swaps, offers, channels or recovery. Tachyon's pending-bridge refund UI was found, but its mechanism and a Horizen-side reclaim path remain unverified.
The mandatory dataset has no Horizen Mainnet DEX metrics and an ambiguous 'Horizen L3' stablecoin match; legacy EON measurements are not substituted.
Only one mainnet explorer, provided by Horizen on Caldera infrastructure, was found serving data; no independent explorer operator was established.
Ledger's vendor page and both vendor network-code sources were unreadable; native vendor-app support for Horizen Mainnet remains unverified.
The ZEN staking program distributes program rewards without validating blocks. Funding is renewable and variable; the live contract does not make future contributions guaranteed.
Legacy chain survival and historical explorer availability were not established.
Sources
Oldest dated source check:Source check overdueSource checked Sep 30, 2026; next check was due Oct 30, 2026.
0 of 50 sources checked in the last 30 days; 50 are past the 30 days recheck.
Found something wrong or out of date? Reporting is free, and every chain goes through the same process. Published corrections appear in the public log.