News
Follow what has changed.
Reviewed news adds a checked explanation of a development and the stage the evidence supports. Automatic headlines are for discovery and are labelled as not yet reviewed. Publication dates and review dates are shown separately, and older items stay as history.
Reviewed news
894 reviewed developments across 151 chains. Each record retains its own review date. A missing review date stays unknown; a check or collection date never replaces it.
A weekly reviewed news run is planned and not yet running, so many chains will show Review overdue until it starts. The items stay available as history.
Sorted by publication date · newest first; equal dates follow the alphabetical chain order. Page 15 of 18.
One chain's developments, A to Z
-
Casper 2.2.0 activated with a one-time issuance and a 2% ecosystem share of yearly issuance
Casper mainnet upgraded to 2.2.0 at era 21742 on 23 March 2026, applying validator votes CVV006 and CVV008. The upgrade minted 4,763,091,158 CSPR once, held in a treasury wallet and released over two years; sent a quarter of new issuance, 2% of supply a year, to an ecosystem sustainability purse; added a minimum delegation rate setting, set to zero for now; cut the minimum validator bid to 500 CSPR; and fixed checks on delegation limits.
- Proposal:CVV008 posted 2026-02-22; vote held 23 to 25 February 2026 and passed
- Implementation:casper-node v2.2.0
- Release:released 2026-03-10
- Activation:activated 2026-03-23 at era 21742 per the Casper Association
Sources: Casper Association — Casper 2.2.0 Goes Live on Mainnet (external site) · Casper Network (GitHub) — casper-node v2.2.0 release notes (external site) · Casper Association — Governance Vote #008 Passes: Securing Validator Economics and Network Sustainability (external site) · Casper Network (casper-node repository, GitHub) — Casper mainnet chainspec, protocol version 2.2.2 (external site) · Casper Network forum — Casper forum: Proposal Discussion category (external site)
-
Osaka hard fork scheduled for mainnet block 213,333,000, adding blob transactions
Kaia v2.2.2 set the mainnet Osaka hard fork for block 213,333,000, estimated for 7 April 2026. The fork adds blob transactions (KIP-279), which carry data that nodes are expected to keep for 21 days against commitments recorded in blocks, a secp256r1 signature precompile for the signatures passkeys use, the eth_config method and other execution changes, and it turns address(0) into an ordinary account without code. It followed v2.2.0 (28 January 2026), which scheduled the Kairos testnet fork.
- Proposal:specified in KIP-279 and KIP-276, among others
- Implementation:shipped in Kaia v2.2.0 and v2.2.2
- Release:mandatory mainnet upgrade in v2.2.2
- Activation:Released mainnet configuration targets block 213,333,000, estimated 7 April 2026. No independent current RPC observation or exact activation-time measurement was made.
Sources: Kaia (GitHub) — Kaia v2.2.2 Release Notice (external site) · Kaia (GitHub) — Kaia v2.2.0 Release Notice (external site) · Kaia Blog — Kaia v2.2 Overview (external site) · Kaia Blog — [Breaking Change] v2.2.2 Hardfork Upgrade: Removal of Bytecode at address(0) (external site) · Kaia Improvement Proposals — KIP-279: BlobTx for Kaia (external site)
-
Manta announces Atlantic retirement and consolidation on Pacific
Manta's Atlantic FAQ announces non-renewal of the Polkadot slot and a focus on Pacific, with Atlantic cessation planned around July–August 2026. Manta's claim portal now states that Atlantic has stopped producing blocks and sets a claim window from 17 September to 16 November 2026 at 08:00 UTC, using an offline ownership signature followed by a Pacific claim. The FAQ explicitly distinguishes Pacific from the Atlantic shutdown.
- Proposal:non-renewal and migration plan described in the FAQ dated 10 March 2026; table names 11 March as announcement day
- Implementation:claim portal describes an offline ownership signature and a Pacific claim; no claim was tested
- Release:not a Pacific software release
- Activation:portal states Atlantic has stopped producing blocks; claim window stated as 17 September to 16 November 2026, 08:00 UTC; date of Atlantic's final block not established
Sources: Manta Network — Manta Atlantic Migration FAQ (external site) · Manta Network — Manta Claim Portal (external site) · Manta Network Documentation — Staking FAQs (external site)
-
Grin node 5.4.0 released, the first node release since 2024
Grin v5.4.0 was the first new reference-node version since v5.3.3 in September 2024 (a rebuild of 5.3.3 followed in November 2024). Its commits make long-overdue upgrades to the networking libraries (Tokio 1.x and Hyper 0.14), fix a case where fast state sync could stall, add a chain-type field to node status, allow running without the terminal interface, and publish Docker images for x86 and ARM.
- Implementation:shipped in v5.4.0
- Release:stable release published 2026-03-09
- Activation:no consensus change; takes effect as nodes upgrade
Sources: Grin developers (mimblewimble/grin) — Grin v5.4.0 (external site) · GitHub API (mimblewimble/grin) — Grin commits between v5.3.3 and v5.4.0 (external site)
-
Sonic Labs launched USSD, a dollar stablecoin built on Frax's frxUSD
Sonic Labs announced USSD on Frax's frxUSD infrastructure. It describes asset-backed minting and supported token-redemption routes. These are issuer and smart-contract arrangements; direct fiat redemption is described as subject to eligibility, KYC/AML and issuer approval, with future phases contemplated.
- Implementation:contracts deployed; Sonic docs list the USSD contract address
- Release:Launched
- Activation:live according to Sonic's current documentation, reread 2026-10-11; interactive minting and redemption were not tested
Sources: Sonic Labs blog — USSD: Sonic's Native, Permissionless USD Stablecoin Built With Frax (external site) · Sonic Labs docs — USSD (external site) · Sonic Labs blog — Day 100 - Where We Are, And Where We're Headed. (external site)
-
Evmos approves v20.2.0 so governance can force IBC withdrawals
As shown on the third-party explorer Stakeflow when read on 27 September 2026, proposal 326 approved an Evmos Mainnet v20.2.0 software upgrade that lets only the governance module force IBC transfers withdrawing tokens from remote chains. No v20.2.0 tag or release appears in the evmos/evmos repository, and the proposal page could not be read again on 4 October 2026.
- Proposal:Passed
- Implementation:upgrade approved; code location not verified
- Release:no v20.2.0 tag or release in evmos/evmos
- Activation:upgrade height not verified
Sources: Stakeflow — Evmos Proposal #326: Evmos Mainnet v20.2.0 (external site) · Stakeflow — Evmos Proposal #328: Gov IBC Transfer to Cosmoshub (external site) · Evmos core maintainers — evmos/evmos releases (external site)
-
Orca disabled trading on Eclipse and moved to withdrawals only
Orca wound down its services on Eclipse: trading and adding liquidity were disabled, its main Eclipse interface shut down, and a permanent withdrawal-only tool was made available for closing positions. Orca says assets remain on-chain and there is no withdrawal deadline.
- Implementation:trading and new liquidity disabled
- Release:withdrawal-only tool published
- Activation:trading and new liquidity ended effective 6 March 2026, per Orca
Sources: Orca — Eclipse Sunset (external site) · Orca — Whirlpool Position Closer (external site)
-
Report on the 23 February 2026 emergency prover upgrade
A bug bounty report found that Scroll's zkVM prover skipped a subgroup check on one kind of curve point in the ecPairing precompile, so some inputs gave different results in the sequencer and the prover and could have stopped batches from finalizing. The Security Council deployed a patched prover as an emergency upgrade on 23 February 2026 and published the fix and this report afterward.
- Implementation:patched prover release v0.7.2
- Release:patch published in the public repository after deployment
- Activation:deployed on mainnet 2026-02-23
Source: Scroll Governance Forum — Report: Scroll Mainnet Emergency Upgrade on 2026-02-23 (external site)
-
ar.io handed operation of the arweave.net gateway back to Forward Research
ar.io wrote that on 1 March 2026 it transitioned operation of the arweave.net gateway, the default access point many apps hardcode, back to the Forward Research team. It said the handover brought temporary instability, with slower loads and occasional timeouts, while the underlying Arweave data was unaffected, and it urged apps to route requests across several gateways with its Wayfinder protocol.
- Implementation:operator change completed on 1 March 2026 according to ar.io
- Release:not a software release
- Activation:in effect from 1 March 2026; no statement from Forward Research itself was found
Sources: ar.io — The Dock Isn't the Lake (external site) · Arweave Docs — HTTP API (external site)
-
Besu removes Ethereum Classic support in version 26.2.0
The Besu client, which the community timeline records as supporting Ethereum Classic since 2019, marked Ethereum Classic and Mordor support as deprecated in versions 25.12.0 and 26.1.0 and removed it, including all Ethereum Classic hard-fork settings, in version 26.2.0.
- Implementation:support removed in Besu 26.2.0
- Release:Released
- Activation:applies to anyone who upgrades Besu to 26.2.0 or later
Sources: Besu maintainers (GitHub) — Besu 26.2.0 release notes (external site) · Besu maintainers (GitHub) — Besu CHANGELOG (main branch) (external site) · ethereumclassic.org (community site) — Classic History (roadmap timeline) (external site) · Core-Geth maintainers (GitHub) — Core-Geth v1.13.0 release notes (external site) · Chippr Robotics (GitHub) — Fukuii releases (external site)
-
Legacy Fantom Opera node client v1.2.1-j released as an optional peer-connection fix
Version 1.2.1-j of the legacy Fantom Opera node client was published in the Fantom-foundation/Sonic repository. The notes list two fixes: a check for a no-archive error when a node sends new-block notifications, and explicit name lookup for bootstrap nodes. They say operators need it only if their node cannot find a peer to connect to. The repository states this client runs Fantom Opera only and will not work with the Sonic network, whose client lives in the 0xsoniclabs/sonic repository.
- Implementation:two fixes merged: no-archive error check for block notifications and bootstrap-node name lookup
- Release:released 2026-03-05 as GitHub release v1.2.1-j
- Activation:no network upgrade or activation; optional install for Opera node operators, per the release notes
Sources: Fantom-foundation (GitHub) — v1.2.1-j (external site) · Sonic Labs blog — Sonic's Successful Network Migration: What This Means for Fantom Opera (external site)
-
zUSDC via XBridge introduced; deBridge support on Zilliqa set to end 31 March 2026
Zilliqa introduced zUSDC, a USDC representation minted by its own XBridge, after unwinding bridged USDC through Ethereum and re-bridging the liquidity. It asked holders of the older bridged USDC to bridge out through deBridge before 31 March 2026, the date it set for deBridge support on Zilliqa to end. Its 19 March follow-up reports automated processing restored; current service availability was not independently tested.
- Implementation:zUSDC and its trading pair announced deployed; automated processing reported restored on 19 March 2026
- Release:announced as completed phases 1 to 3
- Activation:deBridge sunset set for 2026-03-31; not independently checked
Sources: Zilliqa blog — Strengthening Stablecoin Infrastructure on Zilliqa: Introducing zUSDC via XBridge (external site) · Zilliqa — Community Updates: Strengthening the Foundations (external site) · Zilliqa — Zilliqa Bridge (XBridge) (external site) · Circle — USDC contract addresses (external site)
-
Harmony v2026.0.0 adds Stream Sync and sets shard constants to two
Harmony published node release v2026.0.0, a mandatory upgrade without a hard fork. It added an open beta of Stream Sync, a peer-to-peer way to sync that removes reliance on DNS-based syncing but stayed optional, and changed configuration and consensus constants from four shards to two to match the network running since November 2023.
- Implementation:Released
- Release:v2026.0.0 published 2026-03-04
- Activation:no hard fork; took effect as nodes upgraded
Sources: Harmony (GitHub) — Mainnet Release 2026.0.0 (external site) · Harmony (GitHub) — Harmony releases (external site)
-
MONAD_NINE hard fork: linear memory, reserve-balance precompile and a new CLZ opcode
Client release v0.13.0 reached mainnet operators on 12 March 2026 and activated the MONAD_NINE revision at 14:30 UTC on 19 March 2026. It brought MIP-3 (linear memory pricing), MIP-4 (a precompile for reserve-balance checks) and MIP-5 (the CLZ opcode and changed modexp bounds and gas). The same release made the RPC tag "latest" return the latest Proposed block and sped up receipts and websocket notices.
- Proposal:MIP-3, MIP-4 and MIP-5 adopted into the MONAD_NINE revision
- Implementation:shipped in monad-bft v0.13.0 and monad v0.13.0+1
- Release:mainnet release 12 March 2026
- Activation:activated on mainnet 19 March 2026 at 14:30 UTC
Sources: Monad Documentation (Monad Foundation) — Releases (external site) · Monad Documentation (Monad Foundation) — v0.13.0 (MONAD_NINE) upgrade instructions (external site) · Monad Documentation (Monad Foundation) — Changelog (revisions and chain configs) (external site) · Category Labs (GitHub) — monad-bft v0.13.0 (MONAD_NINE) (external site)
-
Monero v0.18.4.6 released
The reference-client bugfix release fixed daemon peer-list filtering, P2P connection issues and a trusted-multisig key-exchange failure. It is software-release evidence and does not establish a new consensus-rule activation.
- Stage:Stable release
- Activation:Not claimed
Sources: Monero community — Monero 0.18.4.6 'Fluorine Fermi' released (external site) · The Monero Project contributors — Monero v0.18.4.6 release (external site)
-
CIP-0105 ties Super Validator reward weight to locked Canton Coin
CIP-0105 was approved on March 2, 2026. It links Super Validator reward weight to retention of a tiered share of lifetime CC rewards. The transitional phase uses disclosed party balances and weekly weight evaluation; a second phase requires MainNet locking contracts and automatic daily vesting. The configuration and its history show reward allocations and enforcement adjustments, but do not by themselves prove that second-phase activation.
- Proposal:approved on 2026-03-02
- Implementation:transitional retained-balance policy and configuration adjustments documented; automatic MainNet locking deployment not verified
- Release:no MainNet release of automatic locking contracts verified
- Activation:reward-weight enforcement changes are visible in configuration history; second-phase on-chain enforcement remains unverified
Sources: Canton Foundation (CIPs repository) — CIP-0105: Super Validator (SV) Locking & Long-Term Commitment Framework (external site) · Canton Foundation (configs repository) — MainNet approved-sv-id-values.yaml (external site) · Canton Foundation (configs repository) — Commit history of the MainNet approved-sv-id-values.yaml file (external site)
-
hostd v2.7.0 added optional consensus pruning
hostd v2.7.0 added an experimental, off-by-default option that limits how many blocks a host stores, since the v2 state design no longer needs every past block to validate new ones. The release advises keeping at least one day of blocks (144 on mainnet) to retain a window for reorganization handling; this is not a maximum reorganization depth. It also fixed contracts wrongly shown as active when a revision and resolution landed in the same block.
- Implementation:shipped in hostd v2.7.0
- Release:released as an experimental option, off by default
- Activation:opt-in per host
Sources: Sia Foundation (GitHub) — hostd v2.7.0 release notes (external site) · Sia Foundation blog — The State of Sia, February 2026 (external site)
-
Juno cuts its active validator set to 25
Governance proposal 372 passed and set the maximum number of active validators to 25, down from the 80 set in April 2025. The proposal said falling network activity and fee income left rewards spread too thinly, and that operators were already leaving. Validators outside the top 25 became inactive, and their delegators had to redelegate to keep earning rewards.
- Proposal:proposal 372 passed
- Implementation:parameter change executed by the proposal
- Release:no software release needed
- Activation:active: staking parameters showed a cap of 25 and 25 bonded validators on 2026-10-12
Sources: Juno on-chain state via PublicNode REST endpoint — Juno proposal 372: Reduce Maximum Validator Set to 25 (external site) · Juno on-chain state via Polkachu REST endpoint — Juno proposal 362: Reduction of the Validator Set (external site) · Juno on-chain state via PublicNode REST endpoint — Juno staking parameters (external site) · Juno on-chain state via PublicNode REST endpoint — Juno bonded validators (external site)
-
SKALE Labs' chief executive proposed shrinking the Ethereum deployment and focusing on SKALE on Base
In a forum post, SKALE Labs' chief executive described SKALE on Base, the first SKALE Expand deployment, as moving beyond a trial, said SKL could now move between Ethereum, Base and SKALE on Base, and put the SKALE on Ethereum network at about 800 nodes and 16 chains. He proposed contracting that network: a rising minimum stake per extra supernode and consolidating apps onto about five main chains while retiring underused ones.
- Proposal:strategy post; the minimum-stake part was proposed separately as SIP-5
- Implementation:not verified
- Release:no software release involved
- Activation:not verified; which chains were retired was not checked
Sources: SKALE Network Forum — Expand. Contract. Grow: The Next Evolution of the SKALE Network (external site) · SKALE Network Forum — SIP-5: Progressive MSR for Network Efficiency (external site)
-
Batch amendment signature flaw disclosed before activation
A disclosure report described a loop error in the proposed Batch amendment's signature checks that would have let an attacker run inner transactions from other accounts without their keys. The amendment was still in voting and had not activated, so no funds were at risk. Server version 3.1.1 marked Batch as unsupported, and a corrected replacement amendment was prepared.
- Proposal:original Batch withdrawn; corrected BatchV1_1 subsequently adopted
- Implementation:fix and replacement implemented in later server releases
- Release:3.1.1 released 2026-02-23 marking Batch unsupported
- Activation:original Batch never activated; BatchV1_1 and fixBatchV1_2 activated October 9, 2026
Sources: XRP Ledger blog (xrpl.org) — Vulnerability Disclosure Report: XRPL Batch Amendment - Unauthorized Inner Transaction Execution (external site) · XRP Ledger documentation (xrpl.org) — October 2026 vulnerability disclosure (external site)
-
Tenfold block reward boost activated at height 5,110,000
The Waves feature table records activation of feature 23 at height 5,110,000 in February 2026; that block is timestamped 24 February 2026 and pays a 60 WAVES reward. Its documented rule multiplies the block reward by ten for 300,000 mainnet blocks. The boost ended at height 5,410,000 on 20 September 2026, whose block pays 6 WAVES.
- Proposal:feature 23 documented in the version 1.5 release notes
- Implementation:implemented in the reference node
- Release:version 1.5 release notes document the reward multiplier
- Activation:activated at height 5,110,000 (24 February 2026); boost period ended at height 5,410,000 (20 September 2026)
Sources: Waves documentation (docs.waves.tech) — Features (external site) · Waves documentation (docs.waves.tech) — Release Notes (external site) · Waves documentation (docs.waves.tech) — Community-Driven Monetary Policy (external site) · Waves public node pool (nodes.wavesnodes.com) — Waves mainnet block 5,110,000 header (node REST API) (external site) · Waves public node pool (nodes.wavesnodes.com) — Waves mainnet block 5,410,000 header (node REST API) (external site)
-
Delegates halted IoTeX after the ioTube bridge exploit and restarted it with an address blacklist
An attacker used a compromised ioTube Ethereum-side owner key to upgrade its validator contract on 21 February 2026, mint CIOTX and drain reserves. Delegates halted IoTeX and resumed on 24 February at 06:06 UTC with v2.3.4 and a 29-address blacklist. The March review reports CIOTX deprecation and the opening of a compensation portal. Current route availability and completion of compensation were not verified.
- Implementation:v2.3.4 blacklist confirmed by IoTeX's incident reports
- Release:Deployed by the reported 2026-02-24 restart; exact release timestamp not reverified
- Activation:Chain resumed 2026-02-24 06:06 UTC per IoTeX
Sources: IoTeX blog — Security Incident Update: ioTube Bridge Exploit and Recovery Roadmap (external site) · IoTeX blog — ioTube Bridge Incident Update No.2: Chain Resumed, Recovery Underway (external site) · IoTeX blog — How IoTeX Responded to the ioTube Bridge Incident: A Full Month in Review (external site) · IoTeX Improvement Proposals (GitHub) — IIP-56: Deprecation of CIOTX Across All Networks (external site)
-
MANTRA released v7.0.0 for the OM redenomination, later recorded as active
The v7.0.0 release includes the migration from OM to MANTRA and the 10-billion MANTRA cap. Current token documentation records the completed 1:4 split at block 13,000,000; the release date and activation date are separate.
- Proposal:upgrade proposal 29 refers to prior redenomination approval; the staged proposal-26 attribution was not confirmed
- Implementation:migration code included in v7.0.0
- Release:released 20 February 2026
- Activation:completed at block 13,000,000 according to current token documentation; guides differ between 2 and 3 March
Sources: MANTRA-Chain — Mantrachain v7.0.0 release (external site) · MANTRA-Chain — v7.0.0 upgrade handler (external site) · MANTRA Chain Docs — MANTRA Token Background (external site) · MANTRA Chain Docs — MANTRA Tokenomics (external site) · MANTRA Chain Docs — Inflation and Vesting Schedule (external site) · Polkachu (governance proposal mirror) — Mantra proposal 29: v7.0.0 mainnet upgrade (external site)
-
Foundation closed its interim Hyperscale research phase after a public test
The interim Hyperscale lead reported that a public test on 31 January 2026 sustained the throughput target set for it, using swap transactions across 128 shards with cross-shard atomic transactions, on commodity cloud machines plus community nodes; a private test showed per-shard throughput holding when the shard count doubled. The closing post hands the work to the community and says the Foundation intends to open-source the remaining code and publish the test setup and network configuration, with no date because parties outside the Foundation must agree. Hyperscale is a research network, not Radix mainnet.
- Implementation:research network tested; not integrated into mainnet software
- Release:no release; open-sourcing of remaining code pending
- Activation:not activated on mainnet
Sources: Radix Blog — Interim Hyperscale: Closing the Chapter (external site) · Radix Blog — Hyperscale Update: 500k+ Public Test Done (external site) · RadixTalk (community-run) — [RFC] Xi'an: Delivering Hyperscale for Radix (external site)
-
Protocol work reorganized around scaling, UX and L1 hardening
The 2026 priorities described Scale, Improve UX and Harden the L1 tracks while summarizing Pectra and Fusaka as 2025 upgrades. Roadmap ideas are not activation promises.
- Type:Roadmap
- Proposal:Mixed
- Release:Mixed
- Activation:Mixed
Source: Ethereum Foundation — Protocol Priorities Update for 2026 (external site)
-
PowPeg signer set changed and maximum signer count raised
Rootstock announced a PowPeg composition change in which Collider left the signer set and a new signer run by RootstockLabs, using an Intel SGX-based hardware module audited by Quarkslab, joined. The set stayed at nine signers with the same threshold, and the maximum supported signer count had been raised from 9 to 20.
- Proposal:on-chain vote by the signers completed
- Implementation:announced composition reflected in the current member list
- Release:not a software release
- Activation:current list includes RootstockLabs and excludes Collider; announced height 8,558,281, exact activation timestamp unverified
Sources: Rootstock — PowPeg Composition Change: Signer Set Update (external site) · Rootstock — PowPeg (external site)
-
Dash Core 23.1.0 speeds up InstantSend processing and adds experimental hardware signing
Dash Core 23.1.0 changed how nodes prioritise and relay quorum messages and process signature shares to speed up InstantSend, added a dust-attack protection option, declared descriptor wallets no longer experimental and added experimental support for handing signing to an external hardware device. It had no breaking changes but was required for masternodes.
- Implementation:shipped in Dash Core 23.1.0
- Release:stable release published 2026-02-14; later 23.1.x patch releases followed
- Activation:no consensus change; took effect as nodes upgraded
Sources: Dash Core developers (dashpay) — Dash Core 23.1.0 release announcement (external site) · Dash Core developers (dashpay) — Dash Core v23.1.0 release notes (external site)
-
Beam described Beam Warp as a staked sidechain
Beam described Beam Warp as a delegated proof-of-stake sidechain. Staking, rewards, slashing and jailing run in a contract, BEAMX holders stake through validators to earn sidechain fees, and a two-way bridge locks funds on the main chain and releases them by validator multisignature.
- Implementation:delegated proof-of-stake contract completed on developer networks
- Release:no public release
- Activation:not on mainnet
Source: Beam blog — Beam Warp Development Update #1 (external site)
-
Blast mainnet v1.7.0 and v1.8.0 fixed the blob fee schedule
Blast released node software v1.7.0 for mainnet with fixes to the blob fee schedule; Blast's blog says it activated on 12 February 2026. A day later v1.8.0 supplied a missing default value from v1.7.0 and was scheduled to activate on 13 February 2026. Operators of the rollup node had to add new blob-schedule settings.
- Implementation:released as v1.7.0 and v1.8.0
- Release:mainnet releases published 2026-02-11 and 2026-02-12
- Activation:v1.7.0 activated 2026-02-12 by timestamp per the blog note; v1.8.0 scheduled by timestamp for 2026-02-13, with no separate confirmation found
Sources: Blast contributors — Releases: blast-io/blast (external site) · Blast — Release v1.7.0 (MAINNET) (external site)
-
Pakistan Digital Authority and DFINITY signed an MoU for a dedicated Pakistan subnet
The 10 February 2026 DFINITY release records an MoU with Pakistan's Digital Authority for a dedicated subnet, a planned national messenger, 1,500 Caffeine licences and a local DFINITY presence. As read on 10 October, the project home page says the Pakistan cloud engine is operating and ChatT is in post-pilot rollout. The public release still describes the original agreement; the later operating claims have no activation date or verified node list here.
- Proposal:MoU signed 2026-02-10
- Implementation:project now describes a running Pakistan cloud engine and ChatT post-pilot rollout
- Release:original agreement followed by undated project operating claims
- Activation:operation claimed by project; activation date, membership and rollout scope not independently verified
Sources: Internet Computer (internetcomputer.org) — Pakistan Digital Authority and DFINITY partner on sovereign cloud infrastructure (external site) · Internet Computer (internetcomputer.org) — Media releases (external site) · Internet Computer (internetcomputer.org) — Internet Computer (external site)
-
Robinhood announced the public testnet
Robinhood's February 10 newsroom post announced a live developer public testnet; Arbitrum cross-confirmed the live testnet in a February 11 post. This was a testnet milestone and does not by itself establish the later mainnet launch.
- Type:Testnet
- Proposal:Completed announcement
- Release:Public testnet announced live
- Activation:Testnet only at publication superseded for mainnet status
Sources: Robinhood — Robinhood Chain Launches Public Testnet (external site) · Arbitrum — Robinhood Chain Launches Testnet on Arbitrum, Commits $1M to Jumpstart Developer Ecosystem (external site)
-
Token holders elected a five-member Radix Accountability Council
A consultation weighted by XRD, run from 30 January to 6 February 2026, chose a five-member council from 22 nominees to guide the move from the Foundation to a community structure; about 1.34 billion XRD from 1,151 accounts took part. The council's remit is to set up its operating framework, coordinate transition tasks and act as the interface between the community and the Foundation. A separate consultation, published on 13 February, approved tapering the Foundation's validator subsidy to zero by June 2026.
- Proposal:consultation opened 30 January 2026
- Implementation:council elected
- Release:results published 7 February 2026
- Activation:five-member council elected in February; a Transition RAC closed charter discussion on 18 September; ratification, legal formation and later governance activation remain distinct and unverified
Sources: Radix Blog — Consultation Results: Radix Accountability Council (external site) · Radix Blog — Consultation Results: The Future of the Validator Subsidy (external site) · Radix Blog — Foundation Update: Moving to Maintenance Mode (external site) · RadixTalk (community-run) — Charter & Policies Ratification Discussion (external site) · Transition Radix Accountability Council — Charter discussion phase closure (external site)
-
ICON Foundation announced a phased halt to ICX emissions and a seven-node validator set
The Foundation set out five phases: a governance vote to remove the 1% validator bond (16 February), four added Foundation nodes (2 March), moving Foundation delegations so seven core nodes hold ranks 1 to 7 (16 March), excluding nodes ranked eighth and below from consensus (23 March), and an economic shutdown ending new ICX emissions (26 March). It said the chain would stay live for transactions and migration to SODA.
- Proposal:bond-removal governance vote announced for 16 February 2026
- Implementation:phased plan announced
- Release:Announced
- Activation:the Foundation's 26 March 2026 post says emissions ended and seven core nodes run consensus
Sources: ICON Foundation — ICON Network Phased Halt to Emissions (external site) · ICON Foundation — ICON Network: Economic Shutdown (external site)
-
Stake holders approved the four Mesa proposals in an on-chain vote
o1Labs reported that the December 2025 on-chain vote on MIP6 to MIP9 (faster slots, larger zkApp state, higher event and action limits, more account updates) ended with 100% of votes cast in favour. The same update said testnet stress tests found memory spikes and that the planned per-block cap on zkApp transactions was halved to limit node memory use.
- Proposal:approved by on-chain memo vote
- Implementation:implemented in the Mesa 4.0.0 node release
- Release:Mesa mainnet release published 2026-09-03
- Activation:later activated on mainnet 2026-09-03
Sources: Mina Protocol blog (o1Labs) — Road to Mesa: Status Update (Feb 2026) (external site) · Mina Protocol blog — The Mesa Upgrade On-Chain Vote (external site) · MinaProtocol/mina maintainers (o1Labs) — Mina Mainnet Stable 4.0.0 Mesa Release (external site) · Mina Protocol blog (o1Labs) — Welcome to Mesa: Mina's Latest Upgrade (external site)
-
Ronin's Saigon testnet completed its move to the OP Stack
Ronin announced that its Saigon testnet had migrated to an OP Stack Layer 2 with Optimism and Conduit, as a rehearsal for mainnet, and told node operators to switch to reth and op-node.
- Proposal:OP Stack adoption voted by governing validators in 2025
- Implementation:completed on testnet
- Release:testnet only
- Activation:active on Saigon testnet
Sources: Ronin blog — The Saigon Testnet Migration is Complete (external site) · Ronin blog — Powering Ronin's Homecoming to Ethereum (external site)
-
x402nano published open-source tools for paying web APIs in XNO
A community developer published x402nano, open-source packages for the x402 HTTP payment protocol on Nano: a payment scheme, helpers and a facilitator that verifies Nano blocks inside payment requests and settles them through a configured Nano RPC node. The earliest commits date from 5 February 2026 and the facilitator's from 6 March 2026. The Nano Foundation's May roundup groups it with other agent-payment tools and says autonomous agents began transacting on Nano mainnet in early 2026; no audit was found.
- Implementation:open-source packages published on GitHub
- Release:published; no audit found
- Activation:no protocol change; each service adopts it separately
Sources: x402nano (GitHub) — x402nano schemes commit feed (external site) · x402nano (GitHub) — x402nano facilitator (external site) · x402nano (GitHub) — x402nano (external site) · Nano Foundation (Nano Blog) — Nano Ecosystem Round Up of 2026 So Far (external site)
-
java-tron GreatVoyage-v4.8.1 (Democritus) released as a mandatory upgrade
The TRON developer community released GreatVoyage-v4.8.1 (Democritus) as a mandatory upgrade and asked nodes to upgrade by 23:59 Singapore time on 9 March 2026. It adds ARM64 support with JDK 17, restricts SELFDESTRUCT through TIP-6780, moves the proposal voting window into chain governance (TIP-767), adds peer-to-peer message rate limits and new APIs for live SR vote counts.
- Proposal:TIP-6780 and TIP-767 referenced in the release notes
- Implementation:shipped in java-tron v4.8.1
- Release:mandatory release; upgrade deadline 2026-03-09 23:59 SGT
- Activation:SELFDESTRUCT restriction shown enabled on mainnet in a 2026-10-11 parameter query; activation date not verified
Sources: tronprotocol (GitHub) — GreatVoyage-v4.8.1 (Democritus) release notes (external site) · TRON Developer Hub — Release Announcements (external site) · TRON Developer Hub — TVM vs EVM (external site) · TronGrid — Chain parameters (public API response) (external site)
-
B² announces B² Mind, an AI agent skill platform
B² announced B² Mind, a service in which AI agents turn a user's plain-language request into planned on-chain actions drawn from a library of skills, then ask the user to sign. B² says skills never hold private keys or send transactions themselves, and that each plan is simulated and risk-rated before the user confirms.
- Implementation:announced as launched
- Release:not a protocol release
- Activation:availability not independently verified
-
Sonic announced a mainnet move to runtime v2.3.0
Sonic said it would migrate mainnet to new hardware and upgrade the runtime from v1.18.23 to v2.3.0, with about three hours of planned downtime starting 4 February 2026 and no endpoint or code changes for developers.
- Implementation:migration scheduled by the operator
- Release:v2.3.0 named in operator notice
- Activation:current activation not independently reverified; notice gives a planned February migration
Source: Sonic SVM — Sonic Mainnet Infrastructure Upgrade Notice (external site)
-
Seven companies join the Liquid Federation, bringing membership to 87
The Liquid Federation added Cowbolt, Eulen, illuminodes, Mooze, OrderMoon, Sorted Wallet and SOUSTA, bringing total membership to 87.
- Implementation:membership change
- Release:Announced
- Activation:members admitted
-
Horace release recalibrates issuance and locked-stake reward weight
PIP Labs released story v1.5.2 (Horace), a mandatory hard fork at mainnet block 13,780,500 that implements SIP-00009: yearly issuance moves from about 25.3 million tokens, the result of the original per-block rate and a faster block rate, to 15,315,000, and the reward weight of locked-token delegations drops from 0.5 to 0.025. Locked and unlocked stake keep equal voting power.
- Proposal:SIP-00009 posted on the forum on 18 January 2026
- Implementation:shipped in story v1.5.2
- Release:mandatory hard-fork release
- Activation:took effect at mainnet block 13,780,500, which the official explorer dates to 5 February 2026; the live parameters were not read in this review
Sources: PIP Labs (GitHub) — Horace (Story v1.5.2) release notes (external site) · DATA Foundation forum — [Proposal] SIP-00009: Emissions Recalibration & Locked Staking Multiplier Adjustment (external site) · DATA Foundation Docs — Staking Design (external site) · Datanetscan — Block 13,780,500 (Horace upgrade height) in the Datanetscan API (external site)
-
Osmosis v31.0.1 moved to the CometBFT version that fixes the Tachyon block-time flaw
Osmosis v31.0.1 was released on 27 January 2026. Its only listed change moves the node software to CometBFT v0.38.21. Four days earlier CometBFT published advisory CSA-2026-001, known as Tachyon and rated critical. The advisory says a mismatch between how commit signatures are checked and how block time is calculated let faulty validators push block timestamps forward. It lists CometBFT v0.38.20 and earlier as affected, names v0.38.21 as the patched v0.38 version and says upgrading is the only fix.
- Implementation:CometBFT v0.38.21 included in Osmosis v31.0.1
- Release:released 2026-01-27
- Activation:takes effect on each node when its operator installs it; how many validators run it was not checked
Sources: Osmosis maintainers — Osmosis v31.0.1 release (external site) · CometBFT maintainers — CSA-2026-001: Tachyon (GHSA-c32p-wcqj-j677) (external site) · Osmosis maintainers — Osmosis v31.0.0 go.mod (external site) · Cosmos chain-registry maintainers — Osmosis chain registry record (external site)
-
FIP-441 fixed FRAX supply and set out a move of Frax governance to Fraxtal
The Frax Core Team proposed capping FRAX, Fraxtal's gas coin, at 143 million with yearly spending caps, dropping the planned long-term tail emission and providing a path to move vote-escrowed positions from Ethereum to Fraxtal. In the thread, a Frax Core Team reply says Fraxtal gas-fee flows will be recycled rather than burned. The appendix reports the North Star hard fork, which made FRAX the gas coin, as complete.
- Proposal:approved in a Snapshot vote closing 2026-02-05
- Implementation:partly implemented; the veFRAX migration was listed as not yet built in the proposal
- Release:not a software release
- Activation:policy in effect; implementation status not verified
Sources: Frax governance forum — [FIP-441] $FRAX: 1 Token, 1 Mission, 1 Vision (external site) · Frax Finance — Fraxtal Snapshot Voting (external site)
-
Governance restores Archway's IBC client to Injective, which later lapses again
Proposal 60 passed with no votes against and replaced the expired light client for injective-1 with the state of a fresh client, reopening the existing Injective channels. When checked on 2026-10-12, the same client was listed as expired again.
- Proposal:proposal 60 passed
- Implementation:client substitution executed by the proposal
- Release:no software release needed
- Activation:expired again as of 2026-10-12
Sources: Archway on-chain state via Archway Foundation REST endpoint — Archway proposal 60: Recover IBC light client for Injective (external site) · Archway on-chain state via Archway Foundation REST endpoint — Archway IBC client 07-tendermint-67 status (Injective) (external site) · Archway on-chain state via Archway Foundation REST endpoint — Archway governance proposals (latest 30) (external site)
-
Tallinn upgrade activated: six-second blocks on Tezos layer 1
Tezos activated its 20th protocol upgrade, Tallinn, on 24 January 2026 at block 11,640,289. It cut the minimum block time from 8 to 6 seconds, bringing two-block finality to about 12 seconds, added a mode in which all bakers attest every block once half of active bakers use BLS consensus keys, and added an address-indexing registry to shrink contract storage.
- Proposal:adopted by on-chain vote
- Implementation:implemented in Octez
- Release:released with supporting Octez versions
- Activation:Tallinn active since 2026-01-24; all-bakers-attest remained below its threshold in the late-August report and had no activation level at the 11 October 2026 head
Sources: Nomadic Labs on Tezos Spotlight — Faster Blocks, Stronger Security, Improved Storage: Tallinn is Live! (external site) · Tezos documentation (docs.tezos.com) — History of amendments (external site) · Tezos Commons on Tezos Spotlight — Month At A Glance: August 2026 (external site) · Tezos mainnet node RPC served by TzKT — Tezos mainnet head block metadata (read at level 15,333,535 on 2026-10-11) (external site)
-
Aurora Engine 3.10.1 released
Aurora Labs published engine 3.10.0 on 2026-01-14 and 3.10.1 on 2026-01-23. The release notes include Osaka-related precompile code, updated gas calculation and removal of legacy ETH-connector code. These are software-release facts; deployment and enabled behavior require separate checks.
- Implementation:Released
- Release:3.10.0 on 2026-01-14; 3.10.1 on 2026-01-23
- Activation:current deployment and activation date not independently verified
Sources: Aurora Labs — Aurora Engine Release 3.10.0 (external site) · Aurora Labs — Aurora Engine Release 3.10.1 (external site)
-
Kava node software v0.28.2 updates its CometBFT consensus engine
Kava Labs published node software v0.28.2. Its release notes list one change: the bundled CometBFT consensus engine moves to v0.37.18. The notes give no upgrade height, do not say whether the update is required and describe no change for wallet or app users. It was the newest release on Kava's release page on 27 September 2026, and Kava Labs' public API node reported running it that day.
- Implementation:CometBFT dependency updated to v0.37.18
- Release:released 23 January 2026; newest release on 27 September 2026
- Activation:no network-wide activation height given; Kava Labs' API node reported v0.28.2 on 27 September 2026
Sources: Kava-Labs/kava on GitHub — Kava v0.28.2 release notes (external site) · Kava-Labs/kava on GitHub — Kava node software releases (Atom feed) (external site) · Kava Labs public REST endpoint — Kava node and application version (REST endpoint) (external site)
-
Instant sync reached hostd (v2.6.0) and walletd (v2.12.0)
hostd v2.6.0 added instant sync: a new host can start from a checkpoint whose compact state is committed in the block header and fully validate blocks from there, without replaying the whole chain. walletd v2.12.0 followed on 2026-02-12 with a checkpoint option for the same purpose. hostd's notes say the host's wallet must have only v2 history to use it.
- Implementation:shipped in hostd v2.6.0 and walletd v2.12.0
- Release:released; hostd's README labels it experimental
- Activation:opt-in per node; no network activation
Sources: Sia Foundation (GitHub) — hostd v2.6.0 release notes (external site) · Sia Foundation (GitHub) — walletd v2.12.0 release notes (external site) · Sia Foundation — Learn / Consensus / Instant Syncing (external site) · Sia Foundation blog — The State of Sia, January 2026 (external site) · Sia Foundation (GitHub) — hostd repository (external site) · Sia Foundation (GitHub) — walletd changelog (external site)
-
Minimum gas price cut from 2,500 to 500 after a node vote
Ontology put a cut of the mainnet minimum gas price to a node vote from 6 to 9 January 2026, and on 22 January said the new minimum of 500, down from 2,500, was live. OWallet v0.10.4 changed its default to 500 and warned that the ONT Ledger app cannot yet adjust the gas price.
- Proposal:node vote held 6 to 9 January 2026; Ontology reported it as successful
- Implementation:network setting changed, per Ontology; the announcements name no node release
- Release:OWallet v0.10.4 updated its default, released 22 January 2026
- Activation:Ontology said the new minimum was live on 22 January 2026; not checked on chain
Sources: Ontology News — Ontology Gas Price Reduction Now Live On MainNet (external site) · Ontology News — Gas Price Reduction Governance Vote Now Live (external site) · Ontology (GitHub) — OWallet v0.10.4 release (external site)
-
SagaEVM halted after an exploit moved about 7 million US dollars of assets to Ethereum
Saga's January 22, 2026 notice reports a January 21 SagaEVM incident involving cross-chain withdrawals and nearly US$7 million moved to Ethereum. It records a pause at height 6,593,800 and explicitly excludes the Security Chain.
- Implementation:SagaEVM pause announced for investigation
- Release:incident notice January 22; full primary post-mortem not found
- Activation:January 21 pause confirmed; exact restart and current access unverified
Sources: Saga — SagaEVM Security Incident: Investigation Update (external site) · Saga — Staking Rewards Return to Saga Mainnet (external site)