News
Follow what has changed.
Reviewed news adds a checked explanation of a development and the stage the evidence supports. Automatic headlines are for discovery and are labelled as not yet reviewed. Publication dates and review dates are shown separately, and older items stay as history.
Reviewed news
894 reviewed developments across 151 chains. Each record retains its own review date. A missing review date stays unknown; a check or collection date never replaces it.
A weekly reviewed news run is planned and not yet running, so many chains will show Review overdue until it starts. The items stay available as history.
Sorted by publication date · newest first; equal dates follow the alphabetical chain order. Page 16 of 18.
One chain's developments, A to Z
-
Node release v3.0.1 switched the Security Chain software to a Saga-held fork of CometBFT
Saga published v3.0.1 of the Security Chain node software on 2026-01-22. Its release notes mention only build-configuration fixes, but the code change also replaces the CometBFT consensus engine with a Saga-held fork named cometbft-sec-tachyon, pinned to a build dated 2026-01-13. On 2026-01-23 CometBFT disclosed a critical block-time flaw it calls Tachyon, fixed in 0.38.21, and says ecosystem partners were told on 2026-01-13. Inference: v3.0.1 carried that fix early; Saga's notes do not say so.
- Implementation:CometBFT replaced by the sagaxyz/cometbft-sec-tachyon fork in pull request 138, merged 2026-01-22
- Release:released as v3.0.1 on 2026-01-22; superseded by v4.0.0, published 2026-03-12
- Activation:which validators ran v3.0.1 was not verified; no governance proposal for it was identified
Sources: Saga (GitHub) — ssc v3.0.1 release (external site) · Saga (GitHub) — ssc go.mod at v3.0.1 (external site) · Saga (GitHub) — sagaxyz/ssc pull request 138: small bug fixes (files changed) (external site) · CometBFT (GitHub security advisory) — CSA-2026-001: Tachyon (external site) · Saga (GitHub) — ssc go.mod at v4.0.0 (external site)
-
Node v0.20.0 scheduled a hard fork activating Cancun EVM rules
Zilliqa released node version 0.20.0 with a hard fork at mainnet block 19,486,411, estimated for 5 February 2026. The notes list Cancun activation for the EVM, a credit-based API rate limiter, faster checkpoint generation and a fix for empty-map Scilla queries.
- Implementation:shipped in zq2 v0.20.0
- Release:required upgrade before block 19,486,411
- Activation:scheduled for block 19,486,411 (estimated 2026-02-05); activation not independently verified
Sources: Zilliqa (GitHub) — zq2 v0.20.0 release notes (external site) · Zilliqa blog — Community Updates and Business Insights (external site)
-
dymd v4.0.2 released with the CometBFT Tachyon security patch
Dymension's v4.0.2 release, published on 2026-01-21, identifies a CometBFT Tachyon security patch. CometBFT's 2026-01-23 advisory rates the timestamp vulnerability critical: faulty behavior can advance block time and affect timestamp-dependent modules. The advisory identifies patched releases and no effective workaround. Current adoption across Hub validators was not established.
- Implementation:the v4.0.2 release explicitly names the CometBFT Tachyon patch; the tagged dependency file was unavailable
- Release:released 2026-01-21 as v4.0.2; still marked Latest on the releases page at review
- Activation:not established: no upgrade height or governance record was reviewed; adoption is per operator
Sources: Dymension contributors — Dymension v4.0.2 release notes (external site) · CometBFT maintainers — CSA-2026-001: Tachyon (external site) · Dymension contributors — Releases · dymensionxyz/dymension (external site) · Staking Explorer — Dymension network parameters (external site)
-
Acurast Mainnet opened to the public as Polkadot parachain 3396
Acurast announced that Mainnet was live, moving production use from the Canary network to Mainnet. Mainnet runs as Polkadot parachain 3396 with ACU as its native token. Acurast set a 90-day window for Canary users to migrate funds, while processors could move at any time; migrated ACU arrived locked under a time-based conversion.
- Implementation:Mainnet runtime running as Polkadot parachain 3396
- Release:public launch announced 2026-01-20
- Activation:live; Canary-to-Mainnet migration of balances is closed and the conversion pallet only allows unlocking
Sources: Acurast blog — Acurast Mainnet & TGE Are Live (external site) · Acurast Docs — Instances (Devnet, Canary and Mainnet) (external site) · Acurast Docs — Acurast Token (ACU): chains and token contracts (external site) · Acurast Docs — From Canary To Mainnet: Overview (external site) · Acurast Docs — Post mortem: Acurast Token Conversion, replay of conversion messages (external site)
-
Archway publishes v10.1.1, a patch release for CometBFT's Tachyon flaw
Archway published v10.1.1-tachyon-security-patch on 20 January 2026. The release describes patched binaries, but its tagged dependency file still pins CometBFT 0.38.17. CometBFT's 23 January advisory identifies the timestamp flaw and fixes in 0.38.21 and 0.37.18; it does not establish which Archway binaries were deployed.
- Implementation:patch described in release notes; tagged dependency remains 0.38.17; attached binaries not inspected
- Release:published on GitHub 20 January 2026
- Activation:Archway's public API node reported v10.1.0 with CometBFT 0.38.17 on 2026-10-12; network-wide adoption and patch contents on running nodes not verified
Sources: archway-network — v10.1.1-tachyon-security-patch (external site) · archway-network/archway repository — go.mod at tag v10.1.1-tachyon-security-patch (external site) · CometBFT (GitHub security advisory) — CSA-2026-001: Tachyon (external site) · Archway on-chain state via Archway Foundation REST endpoint — Archway node info (application and CometBFT versions) (external site)
-
Boba released op-node v1.16.5 with an op-geth security fix
Boba's op-node v1.16.5 release recommends upgrading for a paired op-geth security fix and links op-geth v1.101605.0. Its upstream notes also describe validation of EIP-1559 fee parameters during derivation. Boba's current software page now requires op-node v1.19.7 with op-reth v2.4.4; op-geth support ended on 31 May 2026.
- Implementation:op-node v1.16.5 paired with op-geth v1.101605.0
- Release:released on 2026-01-20; historical pairing, superseded by current operator documentation
- Activation:no network-wide activation; takes effect on each node when its operator installs it
Sources: Boba Network on GitHub — op-node/v1.16.5 (external site) · Optimism (ethereum-optimism/optimism) — op-node/v1.16.5 (external site) · Boba Network Docs — Node Software Releases (external site) · Boba Network on GitHub — Boba repository tags (external site)
-
Merlin publishes cdk-erigon v2.0.3 for RPC nodes
Merlin published cdk-erigon v2.0.3 with fixes for batch-lookup panics, unreadable symbols and block-receipt crashes. The current mainnet RPC-node guide specifies v2.0.3. The release and guide establish software availability, but do not confirm the precise mainnet activation time or the duration of any interruption.
- Implementation:Released
- Release:cdk-erigon v2.0.3 published
- Activation:Current mainnet RPC guide specifies v2.0.3; exact activation time and maintenance completion remain unverified.
Sources: Merlin Chain (GitHub) — cdk-erigon v2.0.3 (external site) · Merlin Chain Documentation — Deploy an erigon rpc for mainnet (external site) · Merlin Chain (GitHub) — cdk-erigon (external site)
-
Neo-CLI v3.9.0 scheduled the Faun hard fork on Neo N3
Neo announced Neo-CLI v3.9.0 for TestNet and MainNet with a hard fork at mainnet block 8,800,000 (TestNet 12,960,000). It adds a Treasury native contract, a committee whitelist for fee-free contract methods, BIP-32 and BIP-39 wallet support, a REST server plugin and new hash functions. The node source gates changes to account blocking, including recovery of funds from accounts blocked for a year, on the same fork, which the mainnet configuration names Faun. Core v3.9.1 release notes describe a fix to records for accounts already blocked at the fork. Neo's announcement index separately lists Neo-CLI v3.9.2 as released on 21 January 2026; its detailed notice was unavailable in this review.
- Implementation:released in Neo-CLI v3.9.0
- Release:released January 2026
- Activation:scheduled for mainnet block 8,800,000; the activation block itself was not observed in this review
Sources: Neo — Neo-CLI v3.9.0 TestNet and MainNet Upgrade Notice (external site) · Neo — Neo blog (external site) · neo-project/neo maintainers — neo v3.9.0 release (external site) · neo-project/neo maintainers — neo v3.9.1 release (external site) · neo-project/neo-node maintainers — Neo-CLI mainnet configuration (external site) · neo-project/neo maintainers — PolicyContract.cs (native Policy contract) (external site)
-
Noble announces a move to a separate EVM layer 1
Noble said it would migrate to a standalone EVM chain built with Commonware, Reth and Simplex consensus, with a proof-of-authority validator set, permissionless contracts and a planned mainnet on 18 March 2026. USDN and a stablecoin exchange were to move there, NOBLE would be its governance token, and the Cosmos chain would move to maintenance mode with IBC connections kept.
- Proposal:announced by Noble; no token vote applies
- Implementation:current implementation outcome not established by the opened primary sources
- Release:announced mainnet target 2026-03-18; completion not confirmed
- Activation:not confirmed
Sources: Noble — A New Noble World (external site) · Noble — NOBLE Token Airdrop: How to Start Your Claims Process (external site)
-
RVN block subsidy halved to 1,250 RVN at block 4,200,000
The scheduled second halving took effect at block 4,200,000, which the Blockbook explorer timestamps 18 January 2026: that block's coinbase paid 1,250 RVN plus fees, down from 2,500 RVN. The rule has been in Ravencoin Core since launch: the 5,000 RVN starting subsidy halves every 2,100,000 blocks.
- Implementation:part of the issuance schedule since launch
- Release:no new release required
- Activation:in effect from block 4,200,000
Sources: blockbook.ravencoin.org — Blockbook: Ravencoin block 4,200,000 (external site) · RavenProject — Ravencoin Core validation.cpp (develop) (external site) · RavenProject — Ravencoin Core chainparams.cpp (develop) (external site)
-
Emergency node release 1.23.3 patched a CometBFT vulnerability
SCRT Labs published node software 1.23.3 as an emergency release with a fix for a vulnerability in CometBFT, the consensus engine Secret shares with other Cosmos chains. Two days later the team said on the forum that an expedited on-chain proposal (340) had been submitted to move mainnet to this version, and that the flaw affected several Cosmos chains rather than Secret alone. Neither the release notes nor the forum notice name the vulnerability. Proposal 340 passed on 20 January 2026, and the upgrade was applied at height 23,509,235.
- Proposal:expedited proposal 340 passed on chain (vote ended 2026-01-20)
- Implementation:fix included in node release 1.23.3
- Release:published 2026-01-17 in the scrtlabs repository
- Activation:applied on mainnet at height 23,509,235
Sources: scrtlabs/SecretNetwork maintainers — SecretNetwork v1.23.3 release notes (external site) · Secret Network Forum (SCRT Labs post) — Expedited Upgrade to 1.23.3 (external site) · Secret Network governance (public REST endpoint) — Proposal 340: Secret Network v1.23.3 Upgrade (external site) · Lavender.Five Nodes public endpoint — Applied upgrade plan v1.23.3 (public REST endpoint) (external site)
-
BounceBit announced the Ignition chain upgrade with proof of authority and 0.5-second blocks
BounceBit announced Ignition, a chain upgrade that would use the Clique proof-of-authority engine with 0.5-second blocks, EIP-1559 fees, a 30 million gas limit and RPC limits, to prepare for a perpetual-futures product. The post promised a separate operator post and gave no activation date.
- Proposal:announced by BounceBit
- Implementation:announced design; deployed mainnet implementation unverified
- Release:node release list does not establish an Ignition activation
- Activation:unverified; no claim that the upgrade never activated
Sources: BounceBit — The Chain Upgrade That Raises BounceBit's Ceiling: Ignition (external site) · BounceBit Labs — bouncebit-chain-node releases (external site) · Binance — Binance Will Discontinue Mainnet Support of BounceBit (BB) (external site)
-
Sui mainnet stalled for about six hours after a consensus bug
On 14 January 2026 an edge-case bug in consensus commit logic led validators to derive different commit outputs, so checkpoints could not be certified and the network halted for about six hours of user-visible disruption. Sui reports that no certified state fork occurred, no certified transaction was rolled back and no funds were lost; a fix was rolled out through canary validators and then the full set.
- Implementation:fix implemented to purge incorrect consensus data
- Release:fix deployed to canary validators, then to the validator set
- Activation:checkpoint certification resumed once a quorum signed the same checkpoint digest
Source: Sui Foundation blog — Sui mainnet network stall resolution (external site)
-
Node software release v1.0.0-beta.17 patched a Geth denial-of-service flaw
Immutable released immutable-geth v1.0.0-beta.17, which brings in the upstream Geth fix for CVE-2026-22868, a moderate-severity flaw where a crafted peer-to-peer message could cause high CPU use. The release also added build attestations to the published images.
- Implementation:upstream Geth fix brought in (release note item: Address CVE-2026-22868)
- Release:v1.0.0-beta.17 published
- Activation:node-local update; no chain-wide activation stated in the release note
Sources: Immutable (GitHub) — immutable-geth releases (external site) · go-ethereum (GitHub security advisory) — DoS via malicious p2p message (CVE-2026-22868) (external site)
-
Runtime 2.0.5 enacted: capped DOT issuance, Hub smart contracts and 2-second Hub blocks
Referendum 1828 enacted Fellowship runtime 2.0.5, which put Referendum 1710's capped, stepped issuance schedule on-chain, added smart contracts (pallet-revive) to Polkadot Hub and enabled elastic scaling for 2-second Hub blocks. The first issuance step took annual issuance from 120 million to about 55.8 million DOT on 2026-03-14.
- Proposal:Referendum 1710 (issuance policy) and Referendum 1828 (upgrade) executed
- Implementation:implemented in Fellowship runtimes 2.0.5
- Release:released 2026-01-13
- Activation:referendum 1828 executed; scheduled for 2026-01-27, exact execution time not reverified; first issuance step on 2026-03-14
Sources: Polkadot Forum — Polkadot Digest 26 January 2026 (external site) · Subsquare (Polkadot OpenGov) — Referendum 1828: Polkadot Upgrade 2.0.5 (external site) · Polkadot Fellowship (GitHub) — Runtimes 2.0.5 (external site) · Subsquare (Polkadot OpenGov) — Referendum 1710: Hard Pressure Capped & Stepped Supply Schedule (external site) · Polkadot Forum — Changes on Polkadot in March 2026 (external site) · Polkadot Forum — Polkadot Staking Changes: Progress & Timeline (external site)
-
Neuron v0.204.0 bundles CKB node v0.204.0 and light client v0.5.4
The official desktop wallet updated its bundled full node to CKB v0.204.0 and its bundled light client to v0.5.4, and moved its assumed-valid block forward. The release notes warn that the app identifier changed, so automatic updates may fail.
- Implementation:Released
- Release:v0.204.0 published 2026-01-12; v0.204.1 followed on 2026-04-10
- Activation:available to users
Sources: Nervos Network (nervosnetwork/neuron) — Neuron v0.204.0 (external site) · Nervos Network (nervosnetwork/neuron) — Neuron CHANGELOG (external site)
-
Bitcoin Cash Node v29.0.0 released for the May 2026 network upgrade
Bitcoin Cash Node released v29.0.0, which implements the 15 May 2026 upgrade: standard pay-to-script outputs, bounded loops, function definition and invocation, and re-enabled bitwise operations. The project called upgrading before 15 May mandatory for its users.
- Proposal:four CHIPs included in the 2026-05-15 upgrade specification
- Implementation:implemented in Bitcoin Cash Node v29.0.0
- Release:released 2026-01-09
- Activation:activated on mainnet at the 2026-05-15 12:00 UTC median-time rule; first block under the new rules is 951,145 per Bitcoin Cash Node source, with the same block hash in Blockchain.com's block data
Sources: Bitcoin Cash Node — Announcing Bitcoin Cash Node v29.0.0 (external site) · Bitcoin Cash Node — Bitcoin Cash Node v29.0.0 release notes (external site) · Bitcoin Cash upgrade specifications (Bitcoin Cash Node) — 2026-MAY-15 Network Upgrade Specification (external site) · Bitcoin Cash Node — Bitcoin Cash Node v29.1.0 release notes (external site) · Bitcoin Cash Node — chainparams.cpp (Bitcoin Cash Node source) (external site) · Blockchain.com — Bitcoin Cash block at height 951,145 (Blockchain.com block data API) (external site)
-
MEV Auction went live on mainnet under KIP-249
Kaia announced that its MEV Auction went live on mainnet on 18 December 2025. Searchers bid in sealed bids through an auctioneer for a backrun slot placed directly after a target transaction; the proposing consensus node constructs and signs the transaction for the winning bid, and bids are paid into a governance-controlled vault. Consensus node support shipped in node v2.1.0 on 28 October 2025, which needed no hard fork.
- Proposal:KIP-249, status Draft on the KIP site
- Implementation:shipped in Kaia v2.1.0
- Release:v2.1.0 released 2025-10-28; no hard fork
- Activation:live on mainnet since 2025-12-18, per Kaia
Sources: Kaia Blog — Kaia MEV Auction Launch & Bid Fee Reimbursement Program (external site) · Kaia (GitHub) — Kaia v2.1.0 Release Notice (external site) · Kaia Improvement Proposals — KIP-249: Slot-Based Auction on Kaia (external site)
-
StarkWare reported a mainnet halt and an 18-minute reorg on 5 January 2026
A sequencer execution bug around reverted nested calls produced an incorrect result. StarkWare dropped 18 minutes of activity (09:24 to 09:42 UTC), paused sequencing until 14:17 UTC, deployed a fix, and said the proving layer stopped the faulty execution from reaching Ethereum.
- Implementation:fix deployed on 2026-01-05; further prevention measures announced
- Release:incident report published
- Activation:network restored at 14:17 UTC on 2026-01-05
Source: Starknet — Starknet Incident Report - January 5, 2026 (external site)
-
Fermi hard fork announced, cutting BSC block time to 0.45 seconds
BNB Chain announced the Fermi hard fork for 14 January 2026 at 02:30 UTC with client v1.6.4. It shortened the block interval from 0.75 to 0.45 seconds and bundled extended fast-finality voting rules, block-level access lists, incremental snapshots and an EVM execution optimization.
- Proposal:BEP-590, BEP-592, BEP-593, BEP-610 and BEP-619
- Implementation:shipped in client v1.6.4 with a v1.6.5 follow-up
- Release:mandatory mainnet release
- Activation:activated on mainnet 2026-01-14 02:30 UTC; 0.45-second blocks described as current in later sources
Sources: BNB Chain Blog — Fermi Hard Fork Accelerates BSC to 0.45-Second Block Times (external site) · BNB Chain Docs — Fermi Hardfork (BSC) (external site) · BNB Chain Blog — Osaka/Mendel Hard Fork: Strengthening BNB Chain After Sub-Second Speed Gains (external site) · BNB Chain Docs — Introduction - BSC Develop (external site)
-
SV Node 1.2.0 released with the Chronicle hard fork
The BSV Association released SV Node 1.2.0, a hard fork called Chronicle. It restores eight opcodes, introduces two more, adds an optional original signature digest selected by a new CHRONICLE flag, raises the script number limit to 32 MB, and drops malleability checks for transactions with a version above 1. Activation was set for testnet block 1,713,168 (target 14 January 2026) and mainnet block 943,816 (target 7 April 2026). Version 1.2.1 followed on 30 March 2026 as a mandatory fix release.
- Implementation:shipped in SV Node 1.2.0; fixes in the mandatory 1.2.1
- Release:mandatory upgrade before the activation height
- Activation:scheduled for mainnet block 943,816; the chain was past that height on 2026-09-29 (968,924)
Sources: BSV Association (GitHub) — Bitcoin SV Version 1.2.0 release notes (Chronicle) (external site) · BSV Association (GitHub) — Bitcoin SV Version 1.2.1 release notes (external site) · BSV Skills Center (BSV Association) — Chronicle Release (external site) · BSV Association (GitHub) — SV Node chainparams.cpp (external site) · Allnodes (PublicNode), powered by the BSV Association — PublicNode BSV mainnet JSON-RPC (read 2026-09-29) (external site) · BSV Association (GitHub) — SV Node interpreter.cpp: Chronicle opcode and malleability rules (external site)
-
Merlin closes legacy Merlin's Seal unstaking and MERL airdrop claims
Merlin announced that, as of 2026, it no longer accepts new Merlin's Seal unstaking requests or MERL airdrop claims, nearly two years after the 2024 staking event. Requests already submitted continue to be processed, and the related channels are closed permanently.
- Implementation:Announced
- Release:not a software release
- Activation:closed to new requests as of the announcement
Sources: Merlin Chain — Merlin's Seal Unstaking & MERL Airdrop Claims: 2026 Closure Update (external site) · Merlin Chain Documentation — What is M-Token? (external site) · Merlin Chain Documentation — Unstaking BTC (external site)
-
XDPoSChain v2.6.8 released EIP-1559 and Cancun support; mainnet activation was subsequently announced
XinFinOrg published v2.6.8 on 7 January 2026 with EIP-1559 and Cancun support, blob/KZG groundwork and a consensus-breaking upgrade notice. The release names block 98,800,200, and a January 30 developer announcement reports mainnet activation. The v2.7.1 mainnet constants set EIP-1559 at block 98,800,200 and Cancun at block 98,802,000; exact block timestamps were not reverified.
- Proposal:EIP-1559 support was announced for the Apothem testnet in February 2025
- Implementation:shipped in XDPoSChain v2.6.8
- Release:mandatory mainnet upgrade
- Activation:Mainnet activation reported on 30 January 2026: EIP-1559 from block 98,800,200 and Cancun from block 98,802,000, per the v2.7.1 mainnet constants.
Sources: XinFinOrg (GitHub) — XDPoSChain v2.6.8 release notes (external site) · Developers Forum for XinFin XDC Network — XDC Network v2.6.8: The Cancun Upgrade Goes Live on Mainnet (external site) · XinFinOrg (GitHub) — core/state_transition.go at v2.7.1 (external site) · XDC Network Documentation — Announcement (external site) · XinFinOrg (GitHub) — common/constants.mainnet.go at v2.7.1 (external site) · XinFinOrg (GitHub) — common/gas.go at v2.7.1 (external site)
-
Aurora DAO approved rotating its 13 council seats
A forum proposal to refresh the Aurora DAO council while keeping 13 seats is marked approved. Proposed members include the NEAR Foundation, Aurora Labs, NEAR One, HOT Wallet, HAPI, two Virtual Chain projects and early investors, matching the members now listed on Aurora's DAO page.
- Proposal:Approved
- Implementation:council list on Aurora's DAO page matches the proposal
- Release:not applicable
- Activation:council roster reflected on DAO page on 2026-10-11; on-chain role changes unverified
Sources: Aurora Forum — [Approved] Rotating the Composition of Aurora DAO Councils (external site) · Aurora — Aurora DAO (external site)
-
Flow published its post-mortem of the December 2025 Cadence exploit
Flow explained that a type-confusion flaw in Cadence 1.8.8 let an attacker duplicate tokens, that about USD 3.9 million left through bridges before validators halted the network, and that an isolated recovery restricted 1,060 accounts and destroyed the counterfeits instead of rolling the chain back.
- Implementation:patched in Cadence 1.8.9 and later
- Release:remediation completed per Flow
- Activation:Cadence resumed 2025-12-29; EVM resumed 2026-01-02; token destruction reported complete 2026-01-30
Sources: Flow Foundation — Dec 27 Technical Post-Mortem (external site) · Flow Foundation — Final remediation update regarding the Flow security incident (external site)
-
Scheduled block reward step to 6 ERG
Ergo Platform announced that the block reward fell from 9 to 6 ERG per block on 3 January 2026, part of the scheduled quarterly 3 ERG steps; explorer data shows the change at block 1,692,000. The announcement said a final step to a 3 ERG floor would follow in April 2026, and that step is recorded separately.
- Proposal:part of the original schedule as amended by EIP-27
- Implementation:built into consensus rules
- Release:no release needed
- Activation:active from block 1,692,000 per explorer data; superseded at block 1,756,800
Sources: Ergo Platform — Ergo Platform news (external site) · Ergo Platform (explorer API) — Ergo Explorer API: blocks 1,691,999 to 1,692,001 (external site) · ErgoDocs (Ergo Platform) — Ergo Emission Schedule (external site) · ErgoDocs (Ergo Platform) — EIP27: Emission Retargeting Soft-Fork (external site)
-
CIP-0096 approved: validator liveness rewards phased down to zero by 30 April 2026
Super Validators approved CIP-0096, which lowered the cap on rewards validators earned just for being online in stages until it reached zero on 30 April 2026. Canton's tokenomics docs now say activity rewards, earned in proportion to the Canton Coin a validator's users burn, are the only way validators mint CC.
- Proposal:CIP-0096 approved on 2025-12-31
- Implementation:CIP-0096 specifies four on-chain Super Validator votes lowering the validator liveness reward cap in stages; the individual votes were not checked
- Release:configuration change voted on the ledger; no software release required
- Activation:cap at zero effective 2026-04-30, per Canton's tokenomics docs
Sources: Canton Foundation (CIPs repository) — CIP-0096: Removing Liveness Rewards from Validator Rewards Pool (external site) · Canton Network Docs — Canton Coin Tokenomics (external site) · Canton Network Docs — Tokenomics of the Global Synchronizer (external site)
-
IoTeX's community update confirms v2.3.0 and IIP-50; fork history records Xingu activation
IoTeX's December community update reports v2.3.0 and its missed-block slashing mechanism. IIP-50 specifies productivity penalties; the official explorer records Xingu at block 41,648,761 on 4 November 2025. The update also describes BLS key registration as preparation for later consensus work.
- Proposal:IIP-50 specification; its metadata still says draft
- Implementation:v2.3.0 confirmed by the community update
- Release:Release reported by 2025-12-30; original publication date not reverified
- Activation:IoTeXScan records block 41,648,761 on 2025-11-04
Sources: IoTeX — IoTeX Community Update — November 2025 (external site) · IoTeX Improvement Proposals (GitHub) — IIP-50: Slash Underperforming Delegates (external site) · IoTeXScan — Hard Fork History (external site)
-
Kava v0.28.1 fixes Ledger device detection
Kava Labs published v0.28.1 and described it as an optional, non-breaking release. It updates the library the kava software uses to talk to Ledger hardware wallets (zondax/ledger-go, from v0.14.3 to v1.0.0) to fix problems detecting a device the notes call the Nano Plus. The notes say people who do not use a Ledger do not need it.
- Implementation:Ledger library updated
- Release:released 29 December 2025; followed by v0.28.2 on 23 January 2026
- Activation:no network activation; optional install for Ledger users
Sources: Kava-Labs/kava on GitHub — Kava v0.28.1 release notes (external site) · Kava-Labs/kava on GitHub — Kava node software releases (Atom feed) (external site)
-
Move Industries took over operations and the foundation said the Layer 1 switch was complete
The Movement Network Foundation announced that Move Industries now holds primary operating responsibility for the network on its behalf, and said the network had completed its transition to a sovereign Layer 1 with validator-based consensus and MOVE staking.
- Proposal:operating change first announced in May 2025
- Implementation:operating change completed per the announcement
- Release:Layer 1 transition stated as complete
- Activation:exact cut-over date not stated in the announcement
Sources: Movement Network — Movement Network Foundation and Move Industries Announce Completion of Operating Change (external site) · Movement Docs — Validator Node (external site)
-
Governance cut OKT Chain's active validator cap to 7
Four on-chain governance proposals between 24 and 29 December 2025 lowered the maximum number of bonded validators from the code default of 21 to 20, 16, 10 and finally 7. Each passed within about two minutes of submission with roughly 70% of voting power in favour.
- Proposal:passed on-chain (proposals 107 to 110)
- Implementation:parameter changes applied through governance
- Release:no software release required
- Activation:active; seven bonded validators and a cap of seven observed on 2026-10-12
Sources: OKX public node — OKT Chain governance proposals (external site) · OKX public node — OKT Chain staking parameters (external site) · OKX public node — OKT Chain Tendermint validator set (external site) · OKX — x/staking/types/params.go (external site)
-
Mantle released the Limb upgrade to support Ethereum's Fusaka changes
Mantle's 1.4.2 release scheduled Limb activation for 14 January 2026 at 07:00 UTC. It added Osaka execution compatibility, updated the beacon query and blob commitment verification, and changed batch submission for Fusaka. The later Elysium release describes Mantle as retaining Osaka rules.
- Implementation:released as 1.4.2
- Release:1.4.2 Mainnet Limb
- Activation:scheduled for 2026-01-14 07:00 UTC; Mantle's September 2026 release describes the chain as running on Osaka rules
Sources: Mantle (GitHub) — 1.4.2 Mainnet Limb (external site) · Mantle (GitHub) — 1.6.3 Elysium (external site)
-
Technical Committee approved a lower ideal staking ratio
Transparency Report 19 approved reducing the ideal staking ratio from 75% to 50%, scheduling application at block 2,329,375. It records four of seven signers. AIP 8 separately proposed raising the Foundation nomination program's acceptable validator commission to 20%; that is an allocation policy, not a protocol commission cap.
- Proposal:AIP 8 posted on the forum 2025-12-15
- Implementation:The current repository reward curve specifies 50%; the individual v2.3.4.2 release page was unreadable.
- Release:runtime upgrade approved by the Technical Committee
- Activation:Scheduled at block 2,329,375 in the report; actual activation was not independently established.
Sources: Avail Forum — AIP 8: Change Ideal Staking Ratio to 50% and Update to Foundation Delegation Commission Policy (external site) · Avail Forum — Transparency Report 19: Change ideal_stake to 50% (external site) · Avail Project (GitHub) — runtime/src/constants.rs (main branch) (external site)
-
Core published a 2026 roadmap
Core's dated roadmap describes planned 2026 chain upgrades, BTC liquid staking tokens, marketplaces pairing BTC and CORE stakers, and term-based staking. The page reports Hermes delivered; the later roadmap items are not established as live.
- Proposal:announced roadmap
- Implementation:not observed
- Release:no dates given
- Activation:no listed item confirmed live as of this review
-
Move Industries announced Movement's Layer 1 mainnet live
Move Industries said Movement had migrated from an Ethereum layer 2 to a sovereign Layer 1 with its own validator-based consensus and MOVE staking, and that funds, contracts and activity carried over without users or developers having to act.
- Proposal:Layer 1 described as under development in the October 2025 MiCA white paper
- Implementation:migration completed per Move Industries
- Release:announced live 2025-12-22
- Activation:exact cut-over time not stated in the announcement
Sources: Move Industries via GlobeNewswire — Movement's M1 Mainnet Goes Live: The People's Chain Is Here (external site) · Movement Network Foundation — MOVE crypto-asset white paper under MiCA (external site) · Movement Docs — Validator Node (external site) · Movement Docs — Bridge (external site)
-
The Reactor upgrade (initiad v1.2.2) passed and was applied
Proposal 64 passed on 2025-12-19 and the upgrade plan is recorded on chain as applied at height 11,270,000. The proposal describes attested IBC for rollup withdrawals, a single-leader rollup sequencer, forwarding-account changes and reward-pool governance controls.
- Proposal:passed (proposal 64)
- Implementation:released as v1.2.2
- Release:released 2025-11-25
- Activation:applied on mainnet at height 11,270,000
Sources: Initia L1 governance (on-chain record) — Proposal 64: The Reactor Upgrade (external site) · Initia Forum — The Reactor Upgrade (external site) · Initia Labs public REST endpoint — Applied upgrade plan v1.2.2 (external site) · initia-labs on GitHub — Release v1.2.2 (external site) · Initia Labs public REST endpoint — Live rollup bridge records (external site)
-
ONG's cap cut from 1 billion to 800 million by the v3.0.0 upgrade
After Triones nodes voted from 28 to 31 October 2025 (117 million votes for, none against), Ontology shipped v3.0.0, which burns 200 million not-yet-released ONG from mainnet height 19,500,000 and releases the rest at 1 ONG per second over about 19 years in total. On 19 December Ontology said the cap change was live on mainnet. It also said 80% of new ONG goes to ONT stakers and 20% plus fees to a permanently locked ONT-ONG liquidity pool.
- Proposal:approved by Triones node vote, 28 to 31 October 2025
- Implementation:shipped in ontology v3.0.0
- Release:GitHub displays v3.0.0 on 27 November; the announcement scheduled v2.7.0 for consensus nodes on 27 November and v3.0.0 upgrade activity from 1 December 2025.
- Activation:Ontology said on 19 December 2025 that the cap is live; the burn is enabled from mainnet height 19,500,000; supply was not read from the chain
Sources: Ontology News — ONG Tokenomics Adjustment: ONG Is Now Capped at 800 Million (external site) · Ontology News — ONG Tokenomics Adjustment Proposal Passes Governance Vote (external site) · Ontology News — Ontology MainNet Upgrade Announcement (external site) · Ontology (GitHub) — ontology v3.0.0 release (external site) · Ontology News — Letter from the Founder: Ontology's MainNet Upgrade (external site) · Ontology (GitHub) — common/constants/constants.go (master) (external site)
-
v1.17.2 mainnet patch released: fee-collector fees redirected to the auction module, plus exchange and EVM fixes
Injective published v1.17.2 as a mainnet patch upgrade on 17 December 2025. Its release notes say proposal 603 would halt the chain at block 146,295,000, around 14:00 UTC on 18 December 2025, and restart it on v1.17.2. The changelog lists one feature, sending all fees meant for the fee collector to the auction module, and fixes to futures settlement, exchange validation, Ledger signing in the command-line tool and EVM log indexes.
- Proposal:proposal 603, setting the halt at block 146,295,000, passed; voting ended 15 December 2025
- Implementation:v1.17.2 node and Peggo binaries published; open-source commit c7b042e dated 17 December 2025
- Release:released 17 December 2025
- Activation:applied at block 146,295,000 according to the chain's upgrade record (scheduled for about 14:00 UTC, 18 December 2025)
Sources: InjectiveLabs/injective-chain-releases on GitHub — Injective v1.17.2 Mainnet Patch Upgrade (release notes) (external site) · InjectiveFoundation/injective-core on GitHub — injective-core CHANGELOG (tag v1.20.3-safeharbor.2) (external site) · InjectiveFoundation/injective-core on GitHub — injective-core commit c7b042e: Release of new version (v1.17.2) (external site) · InjectiveLabs/injective-chain-releases on GitHub — injective-chain-releases releases (external site) · Injective Labs (public sentry node) — Proposal 603: Injective Chain Upgrade (injective-1 public REST endpoint) (external site) · Injective Labs (public sentry node) — Applied upgrade plan v1.17.2 (injective-1 public REST endpoint) (external site)
-
USDCx launched on Stacks through Circle xReserve
A USDC-backed dollar token, USDCx, went live on Stacks, issued through Circle's xReserve and moving between Ethereum and Stacks at launch. Circle describes it as issued by Stacks, not as Circle-issued USDC.
- Implementation:Deployed
- Release:live on mainnet
- Activation:Ethereum route live at launch; other chains were on the roadmap
Sources: Stacks Labs — USDCx Launches on Stacks (external site) · Circle — USDCx on Stacks now available via Circle xReserve (external site) · Circle — xReserve (external site)
-
Message bridge between Neo N3 and Neo X went live
Neo announced a message bridge that carries arbitrary messages between Neo N3 and Neo X, including contract calls, callbacks, relayed results and store-only messages, with contracts deployed on both chains and developer SDKs. It complements the existing token bridge; reaching other EVM chains was described as a future direction.
- Implementation:contracts deployed on both chains, per the announcement
- Release:announced as live
- Activation:live per the announcement; usage not measured
Sources: Neo — Introducing the Message Bridge on the Neo Ecosystem (external site) · BaneLabs — Neo N3 bridge contracts and mainnet deployment addresses (external site) · BaneLabs — Bridge management: owners, signer verification and upgrades (external site) · BaneLabs — Message bridge: signer roots, pause and upgrade controls (external site)
-
CKB node v0.204.0 adds proxy and Tor onion support
The CKB full node release added support for routing peer connections through a proxy and for running as a Tor onion service, along with asynchronous relay messaging and compression improvements. It is not a consensus change.
- Implementation:Released
- Release:v0.204.0 published 2025-12-15
- Activation:not a consensus change; opt-in configuration
Sources: Nervos Network (nervosnetwork/ckb) — CKB v0.204.0 (external site) · Nervos Network (nervosnetwork/ckb) — CKB CHANGELOG (external site) · Nervos Network docs — Run a Node Over Tor (external site)
-
Peer-to-peer relay networking launched on mainnet as an opt-in mode
The Foundation's 2025 roadmap review said peer-to-peer networking launched on mainnet in December 2025 as an opt-in feature, letting nodes connect to automatically discovered, permissionless relays as well as the known, permissioned relays. The node documentation recommends a hybrid mode but leaves peer-to-peer off by default.
- Implementation:peer-to-peer and hybrid modes available in node configuration
- Release:launched on mainnet in December 2025, per the Foundation
- Activation:opt-in; off by default
Sources: Algorand Foundation — 2025 on Algorand: Roadmap progress (external site) · Algorand Developer Portal — Configuring P2P (external site)
-
Gnosis Chain activated a recovery hard fork after the Balancer exploit
Following emergency soft forks after the November 2025 Balancer exploit, Gnosis activated a recovery hard fork on 22 December 2025 at 16:11:40 UTC. It replaced the attacker's account code with a restricted forwarder, enabling DAO-controlled recovery without rewriting past blocks.
- Proposal:announced on the GnosisDAO forum after the November soft fork
- Implementation:client releases listed in the announcement
- Release:Released
- Activation:activated on 2025-12-22 at 16:11:40 UTC, confirmed by the primary recovery history
Sources: GnosisDAO forum — Balancer Hack Hard Fork (external site) · GnosisDAO forum — Balancer hack: claim process and recovery history (external site)
-
Jello hardfork turned on zero-knowledge fault proofs on Celo mainnet
The Jello upgrade activated OP Succinct Lite on Celo mainnet, adding zero-knowledge proofs for dispute resolution, a proof-checked bridge for EigenDA data, and an initial set of six whitelisted challengers (five independent, one run by cLabs).
- Proposal:approved as CGP-265
- Implementation:Ethereum contract changes executed by the Security Council
- Release:released; no client upgrade required
- Activation:active on mainnet since 10 December 2025
Sources: Celo Forum (cLabs) — Jello Hardfork Successfully Activates on Mainnet, Introducing OP Succinct Lite (external site) · Celo Documentation — Jello upgrade (external site) · L2BEAT — Celo (external site)
-
Avail Nexus launched on mainnet as an intent-based cross-chain service
Avail announced that Avail Nexus is live on mainnet. Nexus takes one signed request (an intent) from a user, collects funds in vault contracts on several source chains and has a solver deliver the result on a destination chain. It runs between other chains, not on Avail DA itself, and the launch post said unified verification backed by Avail DA was still coming. The August 2026 Nexus Rising announcement subsequently describes Nexus as a sovereign rollup using Avail DA.
- Implementation:live on mainnet per Avail
- Release:announced as live on 2025-12-09
- Activation:Launch announced in December 2025; Nexus Rising later describes the coordination layer as a sovereign rollup using Avail DA.
Sources: Avail Blog — Avail Nexus Mainnet is Live: New Era for Web3 Apps (external site) · Avail Docs — What are Solvers? (Avail Nexus) (external site) · Avail Docs — How Intents are Processed (Avail Nexus) (external site) · Avail Blog — Make Your App Liquid. Nexus Rising Is Live. (external site)
-
Horizen Mainnet launched as a Layer 3 on Base
Horizen launched its OP Stack mainnet settling to Base, run on Caldera's rollup service, completing its move from a standalone proof-of-work chain. ZEN had already migrated to Base as an ERC-20 in July 2025.
- Implementation:mainnet deployed
- Release:Released
- Activation:live since 9 December 2025
Sources: Horizen Blog — Welcome to Privacy on Base (external site) · Horizen Blog — Horizen Partners with Caldera to Launch Privacy-first Blockchain on Base (external site) · Horizen Blog — Horizen 2025 Year in Review (external site)
-
Governance enabled Zaptos in the Aptos consensus configuration
An on-chain proposal to enable Zaptos in the consensus configuration, and to skip generating randomness when a block does not need it, was executed on mainnet. Zaptos (AIP-132) runs block execution, state certification and storage alongside ordering so that less work remains after a block is ordered, with the aim of lowering end-to-end latency.
- Proposal:AIP-132 marked Draft
- Implementation:enabled through an on-chain consensus configuration change
- Release:delivered by governance proposal 163
- Activation:executed on mainnet 2025-12-08 per the governance page
Sources: Aptos Governance (Aptos Foundation) — Proposal to enable zaptos in consensus config, enable skipping generating randomness if not needed (external site) · Aptos Foundation AIPs — AIP-132: Zaptos - the latency optimal blockchain architecture (external site)
-
Juno votes to unwind community pool stJUNO liquidity
Governance proposal 371 passed and handed the community pool's stJUNO/JUNO liquidity tokens to Juno co-founder Dimi to withdraw the pool on Osmosis, return the JUNO and redeem the stJUNO through Stride. The proposal said most stJUNO stake sat with jailed validators earning nothing and that stJUNO had lost most of its venues.
- Proposal:proposal 371 passed
- Implementation:transfer to the named executor authorised; execution not verified
- Release:no software release needed
- Activation:not verified in this review
-
Boba released op-node v1.16.3 to prevent derivation stalls
Boba's op-node v1.16.3 release note recommends upgrading to avoid derivation stalls. Its linked upstream notes describe fixes for duplicate-content blob retrieval, an overlapping span-batch edge case and L1-origin handling during Ethereum reorganizations. This is historical software guidance; the current Boba software page specifies op-node v1.19.7.
- Implementation:op-node v1.16.3, following upstream op-node v1.16.3
- Release:released on 2025-12-05; superseded by the versions listed in current Boba operator documentation
- Activation:no network-wide activation; takes effect on each node when its operator installs it
Sources: Boba Network on GitHub — bobanetwork/boba releases (external site) · Boba Network on GitHub — Boba repository tags (external site) · Optimism (ethereum-optimism/optimism) — op-node/v1.16.3 (external site) · Boba Network Docs — Node Software Releases (external site)
-
Zashi 2.4.9 changed wallet privacy and performance controls
Electric Coin Company described Zashi 2.4.9 as a wallet UI and performance release. It removed a Coinbase integration because ECC judged recent changes to create unacceptable privacy risk, added an option to enable Tor before restore synchronization, and simplified exchange-rate retrieval to one provider.
- Stage:Release
Source: Electric Coin Company — Zashi 2.4.9 Is Faster! (external site)