News
Follow what has changed.
Reviewed news adds a checked explanation of a development and the stage the evidence supports. Automatic headlines are for discovery and are labelled as not yet reviewed. Publication dates and review dates are shown separately, and older items stay as history.
Reviewed news
894 reviewed developments across 151 chains. Each record retains its own review date. A missing review date stays unknown; a check or collection date never replaces it.
A weekly reviewed news run is planned and not yet running, so many chains will show Review overdue until it starts. The items stay available as history.
Sorted by publication date · newest first; equal dates follow the alphabetical chain order. Page 12 of 18.
One chain's developments, A to Z
-
NVNM Chain launched as a shared-security consumer of MANTRA
Inveniam's 10 June 2026 announcement says the MANTRA-linked NVNM network launched in May. Legacy documentation continues to list that mainnet; NVNM's newer docs separately introduce an L1 testnet and devnet.
- Implementation:legacy MANTRA-linked network documented
- Release:legacy mainnet documentation alongside closed-beta website
- Activation:May 2026 launch reported by Inveniam; new L1 remains documented at testnet/devnet stage
Sources: Inveniam — NVNM launch and community initiative announcement (external site) · NVNM Chain — NVNM Chain (external site) · NVNM — Legacy NVNM network documentation (external site) · NVNM — Legacy NVNM mainnet network details (external site) · NVNM Chain — NVNM NEXT L1 testnet and devnet documentation (external site)
-
Release 1.25.0 added beta non-SGX nodes and machine ID replacement
SCRT Labs published node software 1.25.0, the newest release in its original repository. The notes list four additions: operators can replace a node's machine ID by sending a dedicated transaction; nodes can run in beta on hardware without Intel SGX if paired with an existing SGX node; the emergency validator list is updated; and machines validated through Proof of Cloud are supported. The next day the team said on-chain proposal 354 had been submitted to upgrade mainnet to 1.25; it passed on 18 June 2026, and the upgrade was applied at height 25,809,000.
- Proposal:proposal 354 passed on chain (vote ended 2026-06-18)
- Implementation:features shipped in node release 1.25.0; non-SGX support marked beta
- Release:published 2026-06-10 in the scrtlabs repository
- Activation:applied on mainnet at height 25,809,000
Sources: scrtlabs/SecretNetwork maintainers — SecretNetwork v1.25.0 release notes (external site) · Secret Network Forum (SCRT Labs post) — Mainnet Upgrade to 1.25 (external site) · scrtlabs/SecretNetwork maintainers (GitHub) — scrtlabs/SecretNetwork release feed (Atom) (external site) · Secret3dev on GitHub — Secret3dev/SecretNetwork releases (external site) · Secret Network governance (public REST endpoint) — Proposal 354: Secret Network v1.25 Upgrade (external site) · Lavender.Five Nodes public endpoint — Applied upgrade plan v1.25 (public REST endpoint) (external site)
-
Toncoin renamed Gram (GRAM) after a community vote
The official TON channel announced that 81.22% of votes favoured renaming the native coin from Toncoin (TON) to Gram (GRAM), effective 15 June 2026 at 12:00 UTC. The network name, balances, addresses, contracts, NFTs, staking and DeFi positions were unchanged, and no swap or migration was required.
- Proposal:community vote June 1-8, 2026; 81.22% in favour
- Implementation:name, ticker and logo change only
- Release:not a protocol change
- Activation:effective 2026-06-15 12:00 UTC
Sources: Gram of TON (Telegram channel) — Native Token Rename: Toncoin (TON) to Gram (GRAM) (external site) · TON (ton.org) — TON: The Open Network (external site) · Trezor — Gram (prev. Toncoin) support status (external site) · Ledger — Toncoin wallet (external site)
-
Eclipse Foundation reset ES's role around the Human API app
The Foundation reported a treasury sale and a focus on Human API, whose reported 100,000 users are an issuer claim. It described ES as the app's token and kept the stated supply at 1 billion, allocated 24% float, 29% ecosystem and development, 16% contributors and 31% early supporters/investors. It announced a 16 July 2026 cliff for one third of the last two groups and monthly releases of the remainder over 24 months; actual execution of that schedule was not independently established.
- Implementation:treasury sale reported completed; incentive mechanisms exploratory; vesting execution unverified
- Release:announced in a Foundation blog post
- Activation:no protocol activation announced; July vesting dates are a published schedule
Source: Eclipse Collective — Updated $ES Tokenomics (external site)
-
Governance raised MANTRA's inflation setting to 16% in proposal 33
Proposal 33, which also scheduled the v8.2.0 upgrade, passed on 9 June 2026 and set the minimum and maximum inflation rate to 16%. Its text also proposed raising an emissions split from 40% to 60%; the current Association allocation was not independently reproduced.
- Proposal:proposal 33 passed 9 June 2026
- Implementation:mint settings in the proposal; v8.2.0 includes an upgrade handler and tax-cap changes
- Release:v8.2.0 published 26 May 2026
- Activation:16% shown in live mint settings on 12 October 2026; current Association allocation unresolved
Sources: MANTRA (on-chain governance record) — Governance proposal 33: v8.2.0 upgrade, inflation recalibration and emissions update (external site) · MANTRA (public API node) — Mint parameters (mantra-1 public REST endpoint) (external site) · MANTRA — MANTRA Weekly Transparency Report — Week 33, 2026 (external site) · MANTRA — MANTRA Weekly Transparency Report — Week 34, 2026 (external site) · MANTRA-Chain — Mantrachain v8.2.0 release (external site) · Polkachu (governance proposal mirror) — Mantra proposal 33: v8.2.0 mainnet upgrade (external site)
-
v3.19.0 carried the fixes to reopen the network after the exploit
The June 9 v3.19 announcement describes signing-security work, exclusion of the compromised vault and a pre-restart key check. It also reports Monero code and affiliate revenue-sharing support; release code alone did not activate either feature. The June report dates trading resumption to June 22.
- Implementation:v3.19 announcement describes restart work, Monero code and affiliate revenue-sharing support
- Release:upgrade announcement published June 9, 2026; exact tag date not reproduced
- Activation:June report says trading resumed June 22; October 8 recap reports revenue-sharing pilot live and Monero still before mainnet
Sources: THORChain blog — THORChain Protocol Upgrade v3.19.0 (external site) · THORChain blog — State of the Network - June 2026 (external site) · THORChain Dev Docs — THORNode release and upgrade process (external site) · THORChain / Raynalytics — Chad's Unchained Podcast Debrief, Rev-Share and Monero (external site)
-
Akash node v2.1.0 released for Mainnet 18
Akash released node v2.1.0 for the Mainnet 18 upgrade (proposal 328), scheduled at block 27,230,465 around 11 June 2026. It redesigned the oracle module, which reset stored price history, and added provider-initiated resource reclamation (AEP-82) with a tenant grace period whose default bounds are 1 hour to 30 days.
- Proposal:proposal 328 named in the upgrade guide; current on-chain result not established
- Implementation:v2.1.0 released; later patches v2.1.1 and v2.1.2 published
- Release:released 2026-06-08
- Activation:AEP-82 marked complete 2026-06-11 on the official roadmap; current applied-plan record not established
Sources: akash-network/node maintainers — Akash node v2.1.0 release (external site) · Akash Network — Mainnet 18 upgrade guide (v2.1.0) (external site) · Akash Network — Akash 2026 roadmap (external site) · akash-network/node maintainers — akash-network/node releases (external site)
-
Oasis Core 26.1 released and listed as the Mainnet node version
Oasis Core 26.1 added an explicit observer mode, a setting that lets a client node use remote state checked by its light client instead of local storage (replacing the earlier stateless-client mode), and released offline storage pruning and compaction commands. It also added a check of the runtime identifier on messages in the root hash service and updated its CometBFT fork. Its protocol versions are unchanged from 26.0.
- Implementation:Released
- Release:26.1 published 2026-06-08; 26.2 subsequently published as a prerelease 2026-09-29
- Activation:listed as the Mainnet version on the network parameters page at review
Sources: oasisprotocol/oasis-core maintainers — Oasis Core change log (v26.1) (external site) · oasisprotocol on GitHub — Oasis Core v26.1 release (external site) · Oasis documentation — Mainnet network parameters (external site) · oasisprotocol on GitHub — Oasis Core releases (external site)
-
Bitcoin Core disclosed a PrivateBroadcast IP-address leak
Bitcoin Core disclosed that the PrivateBroadcast feature introduced in 31.0 could, under specified transaction-submission, Tor, and peer conditions, reveal an originator's IP address. The project said the flaw would be fixed in 31.1, whose release notes subsequently list the fix.
- Stage:Reported
Sources: Bitcoin Core contributors — Disclosure of an IP address leak in PrivateBroadcast (external site) · Bitcoin Core contributors — Bitcoin Core 31.1 release notes (external site)
-
EOS Rio published alpha builds of a community Spring 1.2.x maintenance line
EOS Rio, which describes itself as an independent block producer, published Spring v1.2.3-alpha1 from its own fork, describing a community 1.2.x line that continues Spring after upstream work stalled. It is built on v1.2.2 with a rule of no consensus, wire-format or API changes, moves the optimized contract compiler to LLVM 18 and collects fixes from upstream pull requests. A second alpha, proposed in a pull request opened on 3 September 2026 and still open at review, collects fixes for 13 community security and stability reports, including BLS host-function length checks and Savanna vote handling.
- Implementation:alpha builds published in EOS Rio's fork
- Release:alpha, for testing only; second alpha proposed in an open pull request
- Activation:none; no consensus rule changes
Sources: EOS Rio (GitHub) — Spring v1.2.3-alpha1 (eosrio/spring maintenance line) (external site) · EOS Rio (GitHub) — release: v1.2.3-alpha2, community security and stability fixes (external site) · EOS Rio — EOS Rio (external site) · AntelopeIO (GitHub) — Spring v1.2.2 release notes (external site)
-
Frax rebuilt its Fraxtal op-node on Optimism's op-node 1.19.0 and moved its node setup to it
On 4 June 2026 Frax published op-node 1.19.0-frax-1.2.1, its Fraxtal consensus client with the Frax 1.2.1 changes carried onto Optimism's op-node 1.19.0; the release note lists no other change. On 17 June 2026 Frax switched the Docker setup in its fraxtal-node repository, for mainnet and the Hoodi testnet, to this op-node build and to op-reth v2.3.1-frax-1.3.4, and replaced the node start-up script. No fraxtal-node release was tagged for this change and it was not marked required.
- Implementation:released as a Frax op-node build; adopted in the fraxtal-node master configuration on 2026-06-17
- Release:op-node 1.19.0-frax-1.2.1 component release; no fraxtal-node release tag for it as of 2026-09-30
- Activation:operator upgrade; no hard fork or activation time stated
Sources: Frax Finance on GitHub — op-node-1.19.0-frax-1.2.1 (external site) · Frax Finance on GitHub — fraxtal-node commit cc49857: Update reth/node versions (external site) · Frax Finance on GitHub — FraxFinance/fraxtal releases (external site) · Frax Finance on GitHub — fraxtal-node releases (external site)
-
Cronos announces zkEVM shutdown for June 2027
Cronos announced a plan to sunset its separate Ethereum-settled zkEVM chain. The announcement says deposits will be disabled, intends a withdrawal window of approximately twelve months subject to operational or security changes, and schedules final shutdown for 3 June 2027 at 03:00 UTC. The current deposit and withdrawal controls were not independently verified.
- Implementation:announcement plans deposit closure; current bridge controls not independently verified
- Release:sunset announced with an intended withdrawal transition
- Activation:final shutdown scheduled for 2027-06-03 03:00 UTC; not yet completed
Sources: Cronos — Sunsetting the Cronos zkEVM Alpha in 2027 (external site) · Cronos — Cronos zkEVM documentation (external site)
-
Cosmos chain registry marks Evmos as killed
A merged change to the Cosmos chain registry set Evmos's status from live to killed, stating that mainnet evmos_9001-2 was shut down through proposal 331 and halted at about block 37,318,000 around 18 May 2026.
- Implementation:Merged
- Release:published in the registry's master branch
- Activation:in effect
Sources: Cosmos chain-registry maintainers — chore(evmos): mark chain status as killed (#7710) (external site) · Cosmos chain-registry maintainers — Evmos chain registry record (external site)
-
Mandatory v0.14.16 releases change Spark Name renewals from block 1,329,000
Firo's mandatory v0.14.16.0 release (15 May 2026) let owners extend, update or transfer a Spark Name and keep credit for the validity they had left, so they pay only for added time. v0.14.16.1 (3 June 2026) fixed an overflow bug in that new code and a flaw that let Spark Name transfer permissions stay valid indefinitely. Firo told all wallets, nodes and masternodes, including those already on v0.14.16.0, to upgrade before block 1,329,000, expected around 22 June 2026.
- Implementation:credit rule shipped in v0.14.16.0; overflow and transfer-permission fixes in v0.14.16.1; reference code starts the new Spark Name rules at block 1,329,000
- Release:v0.14.16.0 released 2026-05-15 and v0.14.16.1 released 2026-06-03, both labelled mandatory
- Activation:block 1,329,000 was mined at 06:21 UTC on 2026-06-23 and is marked ChainLocked on Firo's explorer
Sources: Firo developers (firoorg) — Firo v0.14.16.1 (GitHub release) (external site) · Firo — Mandatory Release: Firo v0.14.16.1 (external site) · Firo developers (firoorg) — Firo v0.14.16.0 (GitHub release) (external site) · Firo — Mandatory Release: Firo v0.14.16.0 (external site) · Firo developers (firoorg) — Firo reference node: src/firo_params.h (master) (external site) · Firo — Firo Insight API: block 1,329,000 (external site)
-
Mandatory node release 1.6.3 for mainnet, testnet and stagenet
Waves published node 1.6.3 on 3 June 2026 and marked it mandatory for mainnet, testnet and stagenet, asking every node operator to update. The release notes say it updates dependencies and strengthens transaction validation, but they do not list the specific checks. They name no new protocol feature for producers to vote on, and nodes moving from 1.6.2 do not need to rebuild their state.
- Implementation:implemented in node 1.6.3; followed by node 1.6.4 on 2026-08-27
- Release:mandatory release 1.6.3 published 2026-06-03; not a pre-release
- Activation:no feature activation named in the release; the changes apply on each node once its operator installs it
Sources: wavesplatform on GitHub — Waves node v1.6.3 release notes (external site) · wavesplatform on GitHub — Waves node releases (external site)
-
XDC Innovation Labs published a draft post-quantum signature standard for trade documents (XDSS-PQ)
XDC Innovation Labs, a contributor that builds node infrastructure for XDC, published XDSS-PQ Draft v1.0, a proposed standard that signs long-lived trade-finance documents with two post-quantum schemes, ML-DSA and Falcon (FN-DSA), and treats a document as valid only if both signatures verify. The page calls the work forward-looking and in development. The XDC Foundation says the protocol team began a post-quantum initiative in March 2026 with a Falcon prototype in a development codebase.
- Proposal:Draft v1.0 specification published
- Implementation:a Falcon prototype in a development codebase, per the XDC Foundation; not verified
- Release:not released
- Activation:not active on mainnet
Sources: XDC Innovation Labs — XDSS-PQ Specification (Draft v1.0) (external site) · XDC Innovation Labs — About - XDC Innovation Labs (external site) · XDC Foundation — Seven Years of XDC Mainnet: Welcoming the Future of Finance (external site)
-
zcashd 6.20.0 shipped immediate NU6.2 support and Orchard fixes
zcashd 6.20.0 added support for NU6.2 at mainnet height 3,364,600, updated the Orchard circuit verifying key after disclosure of a critical implementation flaw, and enforced the valid proof-data length for Orchard proofs.
- Stage:Release
Source: Zcash developers — zcashd 6.20.0 release (external site)
-
Saga company hands long-term operation of the blockchain to Alapin Holdings
Saga's June 1, 2026 announcement says long-term blockchain and ecosystem operations passed to Alapin Holdings as the company shifted its focus to AI.
- Implementation:operational transfer announced by Saga
- Release:corporate announcement; no software release specified
- Activation:announced June 1, 2026; independent confirmation from Alapin not found
Sources: Saga — Saga Sells Crypto Arm as Success in AI Business Grows, Launches Saga AI Labs (external site) · Saga (via EIN Presswire) — Saga Sells Crypto Arm as Success in AI Business Grows, Launches Saga AI Labs (press release) (external site)
-
SIP-4 SKL burning moved to production for SKALE on Base
The June 1, 2026 forum post says SIP-4 passed and its mechanism shipped for SKALE on Base. Half of that deployment's revenue is routed to Ethereum for SKL burning, with revenue in other assets used to acquire SKL; the other half goes to node operators. The post said the first burns were imminent and left the original Ethereum deployment's economics unchanged. Completed burns were not verified.
- Proposal:passed according to the June 1 primary post
- Implementation:shipped according to that post
- Release:production mechanism reported for SKALE on Base
- Activation:mechanism reported live; completed burns not independently verified
Sources: SKALE Network Forum — SKL Burning Is Live: SIP-4 Moves From Vote to Production (external site) · SKALE Network Forum — [SIP-4]: SKL Burning & SKALE Expand Economics (external site)
-
Three Sui mainnet halts on 28 and 29 May 2026
Sui mainnet stopped three times over two days. Two halts came from a gas-charging bug involving address balances introduced in release 1.72, which caused an arithmetic underflow during settlement; the third came from a latent bug in how validators keep randomness state across restarts. Sui reports that no user funds were at risk and no committed transaction was reverted.
- Implementation:three fixes implemented
- Release:emergency node releases shipped on 28 and 29 May 2026
- Activation:network resumed after each halt
Sources: Sui Foundation blog — Sui mainnet halts resolved after major upgrade (external site) · MystenLabs/sui repository — MystenLabs/sui releases (external site)
-
Bitlayer announces withdrawal of BRC-20 and Runes bridge support
Bitlayer announced that its official bridge would stop supporting BRC-20 and Runes tokens, permanently disabling deposits and withdrawals for them, and advised holders to bridge back to Bitcoin before the cut-off. BTC, ETH and stablecoins were stated to be unaffected. The post is dated 28 May 2026 but gives 30 May 2025 as the cut-off date.
- Proposal:service closure announced
- Implementation:announced; completion not independently established
- Release:not a software release
- Activation:unresolved: May 2025 deadlines appear in a post dated 28 May 2026
Sources: Bitlayer Blog — Discontinuation of BRC20 and Runes Asset Support on the Official Bridge (external site) · Bitlayer Documentation — Peg Tokens (external site) · Bitlayer Documentation — Proof of Reserve (external site)
-
Aleo Stack v4.7.0 brought consensus version 15 and view-only program functions
Provable announced Aleo Stack v4.7.0, which carries consensus version 15 and requires validators and client nodes to upgrade before its activation height. Programs can now be deployed with view-only functions that read on-chain state. Node operators can stream finalize events, such as mapping updates and staking rewards, to outside services through a plugin framework, and the Aleo SDK caches proving material to speed up proving on the user's side. The snarkOS v4.7.0 mainnet release was published on GitHub on 28 May 2026.
- Implementation:shipped across snarkOS, snarkVM, Leo and the Aleo SDK per the post
- Release:mainnet release v4.7.0 published on GitHub 2026-05-28, followed by point releases up to v4.7.5 on 2026-06-23
- Activation:snarkVM's mainnet table sets V15 at height 19,264,000; Provable's API showed the chain past height 22 million by 27 September 2026
Sources: Provable — Announcing Aleo Stack v4.7.0 (external site) · ProvableHQ/snarkOS maintainers — snarkOS v4.7.0 release (external site) · ProvableHQ/snarkOS maintainers — ProvableHQ/snarkOS releases (external site) · ProvableHQ/snarkVM maintainers — snarkVM console/network/src/consensus_heights.rs (mainnet branch) (external site) · Provable — Aleo mainnet latest block (Provable Explorer API) (external site)
-
Bitlayer discontinues its BitVM Bridge
Bitlayer's 27 May 2026 notice says BTC-to-YBTC deposits were disabled effective 28 May and gives 3 June as the last bridge-out date. It scheduled all remaining bridge functions to end then, with broker settlement by the Security Council and matching YBTC burns on Ethereum. It offered later OTC handling of small residual balances and expressly excluded YBTC.b.
- Implementation:deposits stated disabled by the primary notice; broker settlement not independently verified
- Release:not a software release
- Activation:notice gives 28 May 2026 for deposit closure and 3 June 2026 for final withdrawal closure
Sources: Bitlayer Blog — Announcement: Discontinuation of BitVM Bridge Service (external site) · Bitlayer Documentation — BitVM Bridge Network (BBN) Governance Framework (external site) · Bitlayer Documentation — BitVM Bridge Mainnet (external site)
-
Network version 28 (Fire Horse) activated on mainnet
Filecoin's NV28 upgrade was scheduled by Lotus v1.36.0 for epoch 6052800 on 27 May 2026, and the Filecoin blog announced it live that day. It lets contracts check sector status and expiry (FIP-0112), adds a P-256 signature precompile for passkeys (FIP-0113), adds the CLZ opcode (FIP-0114) and changes base-fee adjustment to a tip-based target (FIP-0115).
- Proposal:FIPs 0112 to 0115 Final
- Implementation:implemented in Lotus v1.36.0 with built-in actors v18
- Release:Lotus v1.36.0 released 2026-05-13
- Activation:announced live on mainnet 2026-05-27; activation not independently observed
Sources: filecoin-project/lotus — Lotus v1.36.0 (network version 28, Fire Horse) (external site) · Filecoin (filecoin.io) — Filecoin's NV28 Fire Horse Network Upgrade is Here (external site) · Filecoin Improvement Proposals — FIP-0115: Premium Percentile Base Fee Target (external site)
-
Union Bridge released on Rootstock testnet
Rootstock released Union Bridge, a BitVMX-based bridge in which disputes are meant to be settled on Bitcoin with proofs rather than by a fixed signer set, on testnet through Atlas. The release is experimental, lacks dispute resolution and fraud proofs, and Rootstock plans a second testnet in 2026 and a gradual mainnet launch in 2027.
- Implementation:basic flows only; no dispute resolution yet
- Release:Testnet
- Activation:not on mainnet; mainnet planned for 2027
Sources: Rootstock — Introducing Union Bridge on Testnet: Verifiable Bitcoin Bridging Begins (external site) · Rootstock — Introducing Atlas: The easiest way in to BTCFi (external site)
-
StarkWare published v0.14.3 pre-release notes: faster blocks and an automatic minimum-fee rule
The pre-release notes scheduled v0.14.3 for mainnet on 6 July 2026. It cuts the typical block slot from 2 to 1.5 seconds with a lower per-block gas target (SNIP-40), adjusts the minimum L2 gas price automatically from the STRK/USD price (SNIP-35), switches the core contract's program hash to Blake, and drops support for JSON-RPC 0.8. L2BEAT's governance team said it was inclined to vote against, citing sequencer fee incentives.
- Proposal:SNIP-35 and SNIP-40 proposed in April and May 2026
- Implementation:Released
- Release:scheduled for mainnet on 2026-07-06
- Activation:L2BEAT described mainnet as running v0.14.3 on 2026-10-04; no StarkWare page found confirms the activation date
Sources: Starknet Community Forum — Starknet 0.14.3 pre-release notes (external site) · Starknet Community Forum — [SNIP-40] More frequent blocks (external site) · Starknet Community Forum — SNIP 35 - Automatically adjust base fee to STRK price (external site) · L2BEAT — Starknet (external site) · Starknet Documentation — Chain information (external site)
-
AIP 9 proposes shrinking the active validator set to 80
AIP 9 proposes reducing the validatorCount parameter from approximately 105 to 80 without a runtime-code change. Application of that proposal was not established. The later incident report records a temporary ten-validator recovery set; today's active count was not verified.
- Proposal:AIP posted on the forum 2026-05-25
- Implementation:parameter change only; no code needed
- Release:no transparency report for 80 found
- Activation:Not confirmed; September's incident report describes a separate temporary reduction to ten and planned restoration.
Sources: Avail Forum — AIP 9: Reduce Mainnet Active Validator Set to 80 (external site) · Avail Project (GitHub governance repository) — Avail DA Mainnet Incident Report (Mainnet Liveness and Finality Incident) (external site)
-
Seneca release specifies a 21-validator active-set maximum
PIP Labs released story v1.8.0 (Seneca), a mandatory consensus-client hard fork scheduled for mainnet block 18,173,000 that reduces the number of active validators from 80 to 21 under SIP-00011. The proposal, posted on 30 April 2026, argued that fewer validators cut consensus messaging; validators replying on the forum objected that 21 would concentrate control. Validators outside the top 21 stop earning rewards, and their delegators must redelegate or unbond.
- Proposal:SIP-00011 posted on the forum on 30 April 2026; the thread shows objections from validators and describes no token vote
- Implementation:shipped in story v1.8.0
- Release:mandatory hard-fork release
- Activation:took effect at block 18,173,000, which the official explorer dates to 2 June 2026; the live active-set size was not read
Sources: PIP Labs (GitHub) — Seneca (Story v1.8.0) release notes (external site) · DATA Foundation forum — [Proposal] SIP-00011: Reducing the Active Validator Set from 80 to 21 (external site) · Datanetscan — Block 18,173,000 (Seneca upgrade height) in the Datanetscan API (external site) · PIP Labs (GitHub) — Polybius (Story v1.3.2) release notes (external site)
-
ICON Foundation set 31 December 2026 as the date to halt the ICON chain permanently
The Foundation announced that the ICON Network will shut down on 31 December 2026: the chain will be permanently halted, a read-only archive will be offered for historical lookups, and ICX can no longer be migrated after that date. It said a governance vote would ask validators to approve the shutdown in May 2026, and that migration would become one way from 30 September.
- Proposal:validator governance vote announced for May 2026; result not verified
- Implementation:Permanent halt remains scheduled for 31 December 2026; present block production was not independently sampled.
- Release:shutdown date announced
- Activation:planned for 31 December 2026
Sources: ICON Foundation — Final Date Set for SODA Migration, ICON Network to Shut Down End of 2026 (external site) · ICON Foundation — ICX to SODA Migration Update: Two-Way Migration Closes Friday, September 25 (external site)
-
Osmosis cut its active validator set to 70
Governance proposal 1017 lowered the maximum number of active validators from 100 to 70, removing the lowest-staked validators. The proposal cited more efficient network communication, lower hardware demands and faster block production. It follows earlier cuts to 120 in February 2025 and 100 in September 2025.
- Proposal:proposal 1017 passed
- Implementation:parameter change
- Release:no software release needed
- Activation:active; cap of 70 observed on 2026-09-27
Sources: Osmosis on-chain state via Osmosis public REST endpoint — Osmosis proposal 1017: Reduce Validator Set to 70 (on-chain record) (external site) · Osmosis on-chain state via Osmosis public REST endpoint — Osmosis staking module parameters (on-chain query) (external site) · Osmosis on-chain state via Osmosis public REST endpoint — Osmosis bonded validator count (on-chain query) (external site) · Osmosis on-chain state via Osmosis public REST endpoint — Osmosis governance proposals, newest 200 (on-chain query) (external site)
-
Foundation plans Qtum to Ethereum bridge and bridged USDC
The Qtum Foundation said its Ethereum bridge, a MetaMask Snap and Circle's bridged USDC contracts were audited and expected to launch in summer 2026, with a third-party exchange and other apps to follow later in the year.
- Proposal:Announced
- Implementation:code and audits described by the foundation
- Release:expected summer 2026
- Activation:not confirmed by 4 October 2026
Sources: Qtum Blog — Qtum Development Updates for 2026 (external site) · Qtum project — Qtum Bridge (bridge-core README) (external site) · Qtum project — Qtum Bridge contract (contracts/bridge/Bridge.sol) (external site) · qtum.info — qtum.info API: Bridged USDC (USDC.e) token (external site) · Qtum Blog — Qtum Blog article list (site API) (external site)
-
Optimism planned OP Mainnet interoperability activation, subject to governance
The October 22 announcement identified OP Mainnet for the inaugural interoperability set and kept activation separate from the preparation upgrades. The current preparation notice targeted December 10, 2026 for testnets and January 11, 2027 for OP Mainnet, subject to governance approval. Exact activation timestamps were unset. It described specialized node preparation; the sources opened did not establish operational mainnet interoperability.
- Type:Roadmap
- Proposal:Activation subject to governance
- Release:Operator preparation described
- Activation:Target 2027 01 11 no timestamp set
Sources: Optimism — Prepare for interop on OP Sepolia and Unichain Sepolia (external site) · OP Labs — docs: add interop prep notice for OP Sepolia and Unichain Sepolia (#20835) (external site) · Optimism — Lagoon network upgrade (external site) · Optimism Foundation on governance forum — Towards Mainnet Interop: Introducing the Inaugural Unichain and OP Mainnet Set (external site) · Optimism documentation — Specialized op-node topology with light nodes (external site)
-
Chia 2.7.1 security release published
Protocol/reference-client release: Chia Network urged immediate installation of 2.7.1 as the next security-hardening release after 2.6.x and 2.7.0. The publisher reported no known mainnet exploitation at publication; this is an attributed statement, not independent incident verification.
- Claim:Released
Sources: Chia Network Inc. — Chia 2.7.1 is Out, Upgrade Now (external site) · Chia Network Inc. — chia-blockchain 2.7.1 release (external site)
-
Release v0.73 turned on the simple fee model and high-volume entity creation on Hedera mainnet
Release v0.73 reached mainnet on 20 May 2026 after testnet on 29 April. The notes record initial activation of HIP-1261 simple fees and HIP-1313 high-volume entity creation. The latter adds optional capacity with congestion-sensitive fees. The later v0.77 notes record completion of the simple-fee migration across transactions and queries on 29 September 2026.
- Proposal:HIP-1261 simple fees Final
- Implementation:included in release v0.73
- Release:released; testnet 2026-04-29, mainnet 2026-05-20
- Activation:initial activation in v0.73; migration completed across transactions and queries in v0.77 on 2026-09-29
Sources: Hedera documentation — Consensus node release notes (external site) · Hiero improvement proposals — HIP-1261: Simple fees (external site) · Hedera documentation — Fee model (external site) · Hedera documentation — Network fees (external site)
-
initiad v1.4.7 added mempool gossip history and a re-admission cooldown
Initia Labs published L1 node software v1.4.7 on 2026-05-20. Its one listed change moves the node to Initia's CometBFT fork v0.38.21-initia.4, whose pull request 94 adds a time-limited gossip history to the mempool. The pull request summary says this reduces redundant rebroadcasts and adds a bounded, exponentially growing cooldown before a recently removed transaction is taken back in.
- Implementation:merged in the CometBFT fork (pull request 94) and backported in pull request 522
- Release:v1.4.7 published 2026-05-20
- Activation:takes effect per node once installed; installed versions across mainnet not measured
Sources: initia-labs on GitHub — Release v1.4.7 (external site) · initia-labs on GitHub — feat(mempool): add ttl gossip history to guard outbound flow (external site) · initia-labs on GitHub — initia releases feed (external site) · initia-labs on GitHub — initia releases (external site)
-
Next node release V29 'Piotric' described; development builds continue
The Nano Foundation's 20 May 2026 roundup describes planned V29 Piotric work: ledger integrity checks, bootstrap backlog changes, topology indexing, scheduler and vote-replier work, and operator commands. Some consistency and bootstrap changes also appear in the published V28.2 changelog, so the roundup is not evidence that every listed feature first arrives in V29. Automated V29.0 development builds continue to be tagged on GitHub, the latest seen being V29.0DB97 on 10 October 2026. The release docs still list V29 as planned with no date, and V28.2 as current.
- Proposal:V29 described as the next planned node release
- Implementation:in development; automated development builds tagged through V29.0DB97 (2026-10-10); some listed fixes also appear in V28.2
- Release:V29 not listed as released; V28.2 remains current
- Activation:no V29 activation established from the reviewed sources
Sources: Nano Foundation (Nano Blog) — Nano Ecosystem Round Up of 2026 So Far (external site) · Nano Documentation (Nano Foundation) — Node Releases (external site) · Nano Foundation (GitHub) — V28.2 release (external site) · Nano Foundation (GitHub) — nano-node releases Atom feed (external site)
-
Sui announced mainnet rollout of address balances and gasless stablecoin transfers
On 20 May 2026 Sui announced address balances and gasless transfers rolling out on mainnet. The same day's mainnet-v1.72.2 notes describe the features, but their header says protocol 124 while a change entry says mainnet enablement at 125. The gasless guide lists seven eligible stablecoins and a 0.01 minimum. The precise activation release and epoch are not established by those conflicting release notes.
- Proposal:SIP-58 (address balances)
- Implementation:implemented in node v1.72.2
- Release:mainnet-v1.72.2 released 2026-05-20
- Activation:mainnet rollout announced 2026-05-20; exact release/epoch unconfirmed because v1.72.2's header and feature-gate notes conflict
Sources: MystenLabs/sui repository — mainnet-v1.72.2 (external site) · Sui Foundation blog — Sui launches gasless stablecoin transfers (external site) · Sui Documentation — Gasless stablecoin transfers (external site) · Sui Documentation — Address balances (external site)
-
A vault was drained through a signing-library flaw, and the network halted
THORChain's first exploit report describes how, on 15 May 2026, a node that had churned in two days earlier rebuilt one vault's key through flaws in the GG20 signing library and drained about 10.7 million US dollars (the second report says about 10 million). Automatic solvency halts and node votes stopped trading, signing, chain observation and churn within hours; the other four vaults were unaffected.
- Implementation:halts applied; report #2 identifies v3.19.1 as the library patch
- Release:exploit reports published 20 May, 3 July and 6 August 2026
- Activation:trading resumed around 22 June 2026 per THORChain's June network report
Sources: THORChain blog — THORChain Exploit Report #1 (external site) · THORChain blog — THORChain Exploit Report #2 (external site) · THORChain blog (prepared by THORSec) — THORChain Exploit Report #3 (external site) · THORChain Dev Docs — ADR 028: Exploit Conciliation (external site) · THORChain blog — State of the Network - June 2026 (external site)
-
Draft proposals to replace World Chain's permissioned fault proofs
WIP-1005 and WIP-1006 propose moving from the permissioned fault-proof game to a design with a one-day challenge window, three proof lanes (validity proof, trusted hardware and Security Council) and WLD-denominated bonds. A pre-release of proof components followed on 25 August 2026, then further release candidates: an rc.4 tag on 13 September and an rc.5 pre-release on 29 September 2026. None of these is a final release or a mainnet activation.
- Proposal:Draft
- Implementation:proof components at release-candidate stage: rc.1 pre-release published 2026-08-25; latest, rc.5, published as a pre-release on 2026-09-29
- Release:release candidates only; no final proofs v1.0.0 release in the repository's release feed on 2026-10-04
- Activation:not active
Sources: Worldcoin on GitHub — WIP-1005: Proof System Upgrade (external site) · Worldcoin on GitHub — WIP-1006: Proof System Architecture (external site) · Worldcoin on GitHub — Releases: worldcoin/world-chain (external site) · Worldcoin on GitHub — Proofs v1.0.0-rc.4 (external site) · Worldcoin on GitHub — proofs/v1.0.0-rc.5 (external site) · L2BEAT — World Chain (external site)
-
conflux-rust v3.0.3-fix security release
A node release fixing a possible crash (panic) under certain circumstances; the release notes strongly recommend that operators upgrade. It is not described as a hard fork.
- Implementation:Released
- Release:v3.0.3-fix published 2026-05-19
- Activation:no hard-fork activation announced in these release notes
Sources: Conflux developers (Conflux-Chain) — conflux-rust v3.0.3-fix (external site) · Conflux developers (Conflux-Chain) — conflux-rust releases (external site)
-
Evmos governance passes proposal 331 to shut the chain down
Proposal 331, titled Evmos shutdown, passed in mid-May 2026 and set nodes to halt at height 37,318,000, around 18 May 2026; the Cosmos chain registry's shutdown record gives the same proposal, height and date. Its page on the third-party explorer Stakeflow, read on 27 September 2026, showed a software-upgrade proposal that passed with almost all of the voting stake in favour and carried the messages of proposal 330, which had failed to execute.
- Proposal:Passed
- Implementation:halt height set in the approved upgrade plan
- Release:no new release published in the evmos/evmos repository
- Activation:chain halted around 18 May 2026; registry marks it killed
Sources: Stakeflow — Evmos Proposal #331: Evmos shutdown (external site) · Stakeflow — Evmos Proposal #330: Restore IBC connection with osmosis & IBC transfer (external site) · Cosmos chain-registry maintainers — chore(evmos): mark chain status as killed (#7710) (external site) · ChainCatcher — The Cosmos ecosystem Evmos network has been shut down (external site) · Bitget News (reporting Foresight News) — Cosmos ecosystem chain Evmos ceased operations about a week ago. (external site)
-
Manta ends rewards for the MANTA staking program behind Manta Pacific's fast-finality design
Manta's staking overview and FAQ state that the operator program is being sunset, with rewards ending on 20 May 2026; the FAQ explicitly calls it inactive. This program concerned signatures on Pacific state roots from MANTA and BTC-backed operators. Operators may stop their nodes and delegators can unstake, according to the notice. The separate Atlantic retirement schedule should not be used as this program's reward-end date.
- Implementation:sunset notice on the staking pages, dated 14 May 2026
- Release:not a software release
- Activation:program described as inactive; stated rewards end 20 May 2026
Sources: Manta Network Documentation — Staking Overview (with sunsetting notice) (external site) · Manta Network Documentation — Staking FAQs (external site) · Manta Network Documentation — Fast Finality on Manta Pacific (external site) · L2BEAT — Manta Pacific (external site)
-
Osmosis v31.0.3 updated CometBFT to v0.38.23 with vote, sync and light-client fixes
Osmosis v31.0.3 was released on 14 May 2026 and was still the newest tagged Osmosis release on 27 September 2026. Its notes list only a CometBFT update, and the dependency file at that tag pins CometBFT v0.38.23. The CometBFT v0.38.23 notes, published 8 May 2026, fix the handling of empty (nil) votes, stop a peer from feeding a syncing node a false maximum height, correct when the light client stops comparing witnesses and remove a crash path in the ABCI socket server's error recovery.
- Implementation:CometBFT v0.38.23 included in Osmosis v31.0.3
- Release:released 2026-05-14
- Activation:takes effect on each node when its operator installs it; how many validators run it was not checked
Sources: Osmosis maintainers — Osmosis v31.0.3 release (external site) · Osmosis maintainers — Osmosis v31.0.3 go.mod (external site) · CometBFT maintainers — CometBFT v0.38.23 release (external site) · Osmosis maintainers — Release notes from osmosis (Atom feed) (external site) · Osmosis on-chain state via Osmosis public REST endpoint — Osmosis proposal 1044: Alloyed BTC: Restore backing after the nBTC incident (on-chain record) (external site)
-
Sonic introduced NorthStar session runtimes
Sonic described NorthStar as a session-based scaling protocol that lets an app open a short-lived dedicated runtime for traffic peaks and close it afterwards.
- Implementation:devnet per project docs
- Release:Announced
- Activation:devnet documented; mainnet deployment not established
Sources: Sonic SVM — Intro to NorthStar (external site) · Sonic SVM — NorthStar documentation (external site) · Sonic SVM — NorthStar security model (external site)
-
Ledger Wallet added native Aleo support with private sends
Aleo announced, and Ledger confirmed on 18 May 2026, that Ledger Wallet desktop supports ALEO natively. Users install the Aleo app on the device, approve sharing a view key so the app can show the private balance, and send from either a public balance or a private record with confirmation on the device.
- Implementation:available in Ledger Wallet desktop 4.2.0 or later
- Release:announced by Aleo 2026-05-13 and by Ledger 2026-05-18
- Activation:available at announcement per Ledger; not tested in this review
Sources: Aleo — Aleo + Ledger: Shielded transactions, hardware-secured keys (external site) · Ledger — New in Ledger Wallet: Secure Private Transactions with Aleo (external site) · Aleo — USDCx on Aleo is now live in Ledger (external site)
-
Emergency runtime upgrade rejects wrapped bridge sends
The Technical Committee used its emergency path to apply a runtime upgrade that rejects Avail-to-Ethereum bridge sends wrapped inside proxy, multisig, scheduler or batch calls, after finding that such wrappers could produce bridge data for a send that did not execute or leave funds stuck. Direct bridge sends keep working. A related fault in March 2025 had caused losses for bridge sends made through multisig or proxy calls.
- Implementation:runtime upgrade changing bridge transaction validation
- Release:executed through the emergency proposal path
- Activation:applied at block 2,920,735 per the report
Sources: Avail Forum — Transparency Report 20: Avail Bridge Wrapped Transaction Safety Fix (external site) · Avail Forum — Transparency Report 16: Critical Runtime Upgrade - Filtering VectorX Bridge transactions (external site) · Avail Docs — Bridge AVAIL between Avail DA and Ethereum (external site)
-
Ronin mainnet became an Ethereum Layer 2 on the OP Stack
Ronin announced completion of its migration to an OP Stack Layer 2 after the planned May 12 outage. Conduit operates the infrastructure, EigenDA holds transaction data, and RON remains the gas asset. Validator staking ended and Ronin stated a 5 million RON annual builder-reward budget.
- Proposal:OP Stack adoption voted by governing validators in 2025
- Implementation:Completed
- Release:Mainnet
- Activation:mainnet completion confirmed by the May 13 announcement; outage and hard fork scheduled for May 12
Sources: Ronin blog — Ronin is Home. (external site) · Ronin blog — Ronin is coming home to Ethereum (external site) · Ronin blog — Powering Ronin's Homecoming to Ethereum (external site) · L2BEAT — Ronin (external site)
-
Neutron v11 moved governance to the standard module and added inflation and slashing
Neutron v11.0.0, applied at height 56277000 around 13 May 2026, replaced contract-based DAO voting with the standard Cosmos governance module, added minting and distribution modules, set slashing penalties and removed the fee-burning and revenue modules. Because token voting had not reached quorum since 1 April 2026, the upgrade height was submitted by the DAO-elected privileged multisig.
- Proposal:scheduled by the DAO-elected privileged multisig because token voting lacked quorum
- Implementation:released as v11.0.0
- Release:released 2026-05-12
- Activation:applied at height 56277000
Sources: Neutron contributors — Neutron v11.0.0 release (external site) · Neutron contributors (mainnet-assets) — Neutron v11.0.0 Upgrade, Instructions (external site) · Neutron contributors — v11.0.0 upgrade handler source (external site) · Solva public REST endpoint for neutron-1 — Applied upgrade plan v11.0.0 (on-chain query) (external site) · Solva (solva-solutions/neutron-wasmd) — CosmWasm module authorization policy (Neutron wasmd fork, v0.61.14-neutron) (external site) · Neutron contributors — v11.0.0 upgrade store changes (constants.go) (external site)
-
Blockstream publishes Liquid roadmap with post-quantum work and BitVM bridge research
The May roadmap proposed issued-asset amounts above 21 million, fees in assets other than L-BTC, an optional user-pays peg-in policy, Taproot peg sweeps, post-quantum readiness and research on a Bitcoin peg using BitVM. By this review, the 0-conf service had been announced as available in July and Elements 23.3.4 had enabled the issued-asset change by default in September. A release default does not establish the activation date or configuration of every node.
- Proposal:roadmap items at different stages
- Implementation:0-conf service announced in July; issued-asset change enabled by default in Elements 23.3.4
- Release:some roadmap work subsequently released; BitVM remains research in reviewed sources
- Activation:specific consensus activation dates not independently verified
Sources: The Liquid Blog — Blockstream Shares Liquid Development Roadmap: 0-Conf, PQ Readiness, BitVM & More (external site) · ElementsProject (GitHub) — elements-23.3.4 (external site) · The Liquid Blog — 0-Conf for Elements and Liquid: A Technical Explainer (external site)
-
Monero v0.18.5.0 released
The recommended reference-client release added SOCKS v5 support to the daemon and wallet, removed daemon UPnP support, restricted sensitive ZMQ and wallet-RPC methods, and included bug fixes. This is client-release evidence, not a consensus activation claim.
- Stage:Stable release
- Activation:Not claimed
Sources: Monero community — Monero 0.18.5.0 'Fluorine Fermi' released (external site) · The Monero Project contributors — Monero v0.18.5.0 release (external site)