News
Follow what has changed.
Reviewed news adds a checked explanation of a development and the stage the evidence supports. Automatic headlines are for discovery and are labelled as not yet reviewed. Publication dates and review dates are shown separately, and older items stay as history.
Reviewed news
894 reviewed developments across 151 chains. Each record retains its own review date. A missing review date stays unknown; a check or collection date never replaces it.
A weekly reviewed news run is planned and not yet running, so many chains will show Review overdue until it starts. The items stay available as history.
Sorted by publication date · newest first; equal dates follow the alphabetical chain order. Page 17 of 18.
One chain's developments, A to Z
-
Dymension announces hardware-attested RollApp finalization
Dymension's 2025-12-03 announcement describes Google Cloud Confidential Space attestations that let the Hub finalize opted-in RollApp state without waiting out the usual dispute period. The feature is present in the v4.0.0 release. The exact enabling vote and current per-RollApp adoption were not confirmed.
- Proposal:specific proposal 34 outcome not re-established
- Implementation:included in v4.0.0
- Release:released 2025-11-17; described in the blog on 2025-12-03
- Activation:the team announces support; current global parameter and per-RollApp opt-in not confirmed
Sources: Dymension blog — TEE-Backed Fast Cross-Chain Transfers (external site) · Dymension — Dymension Blog (external site) · Dymension contributors — Dymension v4.0.0 release notes (external site)
-
LayerZero and Stargate connected to the IOTA layer 1
The Foundation's 3 December 2025 announcement describes LayerZero and Stargate connectivity for IOTA's Move-based L1, following IOTA EVM connectivity in 2024. USDT0's current provider docs identify a dedicated Ethereum lockbox route to IOTA L1. These routes use external verifiers and administrative controls.
- Implementation:LayerZero endpoint deployed on IOTA layer 1
- Release:announced 2025-12-03
- Activation:L1 connectivity announced live by the Foundation; USDT0's docs publish a dedicated Ethereum–IOTA Mainnet route.
Sources: IOTA Foundation blog — IOTA Mainnet Integrates LayerZero and Stargate (external site) · USDT0 Docs — Developer Guide (external site) · LayerZero — LayerZero Labs KelpDAO Incident Report (20 May 2026) (external site)
-
Blast mainnet v1.4.0 kept Blast compatible with Ethereum's Fusaka upgrade
Blast published node software v1.4.0 for mainnet to stay compatible with Ethereum's Fusaka hard fork, after a matching testnet release in October 2025. Because Blast reads its data from Ethereum, its nodes must follow Ethereum's upgrades.
- Implementation:released as v1.4.0
- Release:mainnet release published 2025-12-02
- Activation:tied to Ethereum's Fusaka activation; the release note gives no activation time of its own
Source: Blast contributors — Releases: blast-io/blast (external site)
-
Jovian hard fork (OP Stack Upgrade 17) activated on Mode
Mode was among the chains named for the Jovian upgrade, which lets chain operators set a minimum base fee, adds a block limit on estimated Ethereum data use, and changes how the operator fee is calculated.
- Proposal:Optimism governance upgrade proposal
- Implementation:shipped in OP Stack releases
- Release:released before activation
- Activation:active on Mode since 2025-12-02
Sources: Optimism Docs — Upgrade 17: Jovian hard fork (external site) · Optimism (ethereum-optimism/superchain-registry) — Superchain Registry: mainnet/mode.toml (external site)
-
Jovian hard fork (OP Stack Upgrade 17) activated on Unichain
Unichain was among the chains named for Jovian, which lets chain operators set a minimum base fee, adds a block limit on estimated Ethereum data use to curb spam during fee spikes, and updated the fault-proof virtual machine.
- Proposal:Optimism governance upgrade proposal
- Implementation:shipped in OP Stack releases
- Release:released before activation
- Activation:active on Unichain since 2025-12-02
Sources: Optimism Docs — Upgrade 17: Jovian hard fork (external site) · Optimism (ethereum-optimism/superchain-registry) — Superchain Registry: mainnet/unichain.toml (external site) · Uniswap Labs (Unichain public RPC) — Unichain Mainnet public RPC: latest block header (external site) · Uniscan — Unichain block 60346035 (external site)
-
Jovian hard fork (OP Stack Upgrade 17) activated on Zora Network
Zora was among the chains named for the Jovian upgrade. Jovian let operators set a minimum base fee, added a default in-protocol limit on each block's estimated Ethereum data use, and changed how the operator fee is calculated.
- Proposal:Optimism governance upgrade proposal
- Implementation:shipped in OP Stack releases
- Release:OP Stack node releases
- Activation:active on Zora Network since 2025-12-02
Sources: Optimism Docs — Upgrade 17: Jovian hard fork (external site) · Optimism (ethereum-optimism/superchain-registry) — Superchain Registry: mainnet/zora.toml (external site)
-
Second QTUM subsidy halving
The block subsidy fell from 0.5 to 0.25 QTUM at block 5,369,004 on 30 November 2025, as scheduled in the consensus code. The foundation puts new issuance at roughly 0.25% a year afterwards and expects the next halving around December 2029.
- Implementation:built into consensus rules
- Release:not applicable
- Activation:took effect at block 5,369,004
Sources: qtum.info — qtum.info block 5,369,004 (external site) · Qtum project — Qtum Core block validation (src/validation.cpp) (external site) · Qtum Blog — Qtum Development Updates for 2026 (external site)
-
Runtime 1900 made new collators subject to governance approval
Referendum 44 enacted runtime 1900, which replaced open collator registration with an application flow: a candidate posts an application on the Astar forum for at least 7 days, then reserves the 3,200,000 ASTR bond on chain and is approved by two thirds of the Main Council or a referendum. The same runtime added the Tokenomics 3.0 decay factor and preparations for Polkadot's Asset Hub migration.
- Proposal:passed as referendum 44
- Implementation:shipped in runtime 1900
- Release:runtime-only release; no client upgrade required
- Activation:Enacted per referendum 44; precise execution date was not freshly established.
Sources: Subsquare (Astar democracy) — Referendum 44: Astar Runtime 1900 Upgrade (Asset Hub migration prep, tokenomics decay, governance-approved collator selection) (external site) · Astar Forum — Astar Collator System Update: Transitioning to Governance-Approved Collator Selection (external site) · Astar Network — Collator requirements (documentation repository) (external site)
-
Lelantus v1 redemption window announced to close at block 1,223,500
Firo announced that unredeemed Lelantus coins minted before Spark's launch had to be moved into Spark before block 1,223,500, after which they would become inaccessible. The reference code rejects Lelantus transactions from that height, and the block was mined on 21 December 2025.
- Implementation:cut-off in reference code (Lelantus rejected from block 1,223,500)
- Release:in released node software
- Activation:cut-off height passed on 2025-12-21
Sources: Firo — Lelantus v1 redemption closing (external site) · Firo developers (firoorg) — Firo reference node: src/firo_params.h (master) (external site) · Firo developers (firoorg) — Firo reference node: src/validation.cpp (master) (external site) · Firo — Firo Insight API: block 1,223,500 (external site)
-
dcrd 2.1.0 opens a ticket-holder vote on a new treasury spending cap (DCP-0013)
dcrd 2.1.0 added a consensus vote on DCP-0013, which caps treasury spending in each roughly 24-day window at 4% of the treasury balance, with a floor of about 10,781 DCR, replacing a rule tied to recent treasury income. The release also cut mixing bandwidth and added timeouts for disruptive mixing peers. DCP-0013 is now listed as active: it locked in at block 1,044,352 and took effect at block 1,052,416.
- Proposal:DCP-0013 created 2025-11-20; approved by ticket-holder vote
- Implementation:shipped in dcrd 2.1.0
- Release:stable release published 2025-11-26
- Activation:active from block 1,052,416 (block time 2026-02-08)
Sources: Decred developers — dcrd v2.1.0 release notes (external site) · Decred developers — DCP-0013: New Max Treasury Expenditure Policy (external site) · Decred project (dcrdata) — dcrdata API: block 1,052,416 (external site)
-
Rosen Bridge support for Bitcoin Runes announced live
Ergo Platform announced that Rosen Bridge launched Bitcoin Runes support on mainnet, letting Runes tokens issued on Bitcoin move to Ergo and on to other chains Rosen connects, such as Cardano.
- Implementation:Runes support included in Rosen service releases
- Release:announced live on mainnet 2025-11-26
- Activation:reported by Ergo Platform; not independently tested
Sources: Ergo Platform — Ergo Platform news (external site) · ErgoDocs (Ergo Platform) — Rosen Bridge (external site)
-
Fourier hard fork set for 7 January 2026 to cut opBNB's block interval to 250 ms
BNB Chain released opBNB node v0.5.5 and op-geth v0.5.9, which set the Fourier hard fork's mainnet time to 03:00 UTC on 7 January 2026; the fork halves the block interval from 500 ms to 250 ms. The fork was first released in v0.5.4 in October 2025 with testnet activation set for 6 November 2025. v0.5.5 also made the sequencer and derivation follow BNB Smart Chain's finalized block.
- Implementation:shipped in opbnb v0.5.4 and v0.5.5 and op-geth v0.5.8 and v0.5.9
- Release:mandatory node upgrade before the fork time
- Activation:mainnet 2026-01-07 03:00 UTC per BNB Chain's announcement, which marks the upgrade passed
Sources: BNB Chain (GitHub) — opBNB v0.5.5 release notes (Fourier mainnet time) (external site) · BNB Chain (GitHub) — opBNB v0.5.4 release notes (Fourier hard fork implementation) (external site) · BNB Chain Docs (Announcements) — Fourier Upgrade of opBNB (external site) · BNB Chain (GitHub) — op-geth v0.5.10 release notes (external site) · BNB Chain (GitHub, bnb-chain/opbnb) — feat: replace l1 head with l1 finalized block as sequencer and derivation head (pull request #319) (external site)
-
Foundation reported a handover and a low-cost hibernation mode for Aleph Zero mainnet
The Aleph Zero Foundation said everything needed to keep mainnet running, including the main websites and the aleph-node repository, had been handed over; websites had moved from Digital Ocean to dedicated servers, its AWS infrastructure had been dismantled, and nearly all cost-saving steps were done to keep the chain in as much of a hibernation mode as possible. It said the move to a DAO was far from complete, and that after a board member resigned and negotiations with Cardinal Cryptography failed, it had filed a claim against Cardinal, of which Cardinal had recently been notified, and on which it would not comment until a Swiss court or a settlement resolves it.
- Implementation:handover and cost cutting reported as done
- Release:announced in a Foundation blog post
- Activation:Reported operational handover; current block production and finality were not independently measured.
Sources: Aleph Zero Foundation — Q4 Update (Aleph Zero Blog, 25 Nov 2025) (external site) · Aleph Zero Foundation — The New Aleph Zero Roadmap (Aleph Zero Blog, 1 Jul 2025) (external site) · Aleph Zero Foundation — Aleph Zero official blog (external site)
-
Foundation proposed updating aleph-node to the latest Polkadot SDK and adding RISC-V contracts
The Foundation said several firms and individuals had been identified to update the aleph-node repository to the latest Polkadot SDK and then add the pallet-revive module so the chain can run RISC-V contracts written in ink! 6. It called the first cost and time estimates reasonable, roughly a month of work not counting testnet deployment and stabilisation, and said it was waiting to proceed. The July 2025 roadmap first set out the RISC-V plan after the EVM layer sunset.
- Proposal:proposed by the Foundation; developers identified, awaiting cost and time decisions
- Implementation:Developers and estimates reported in November 2025; subsequent implementation was not verified.
- Release:No resulting SDK/RISC-V release was established from the checked release pages.
- Activation:Mainnet activation was not established; a proposal or repository release does not prove activation.
Sources: Aleph Zero Foundation — Q4 Update (Aleph Zero Blog, 25 Nov 2025) (external site) · Aleph Zero Foundation — The New Aleph Zero Roadmap (Aleph Zero Blog, 1 Jul 2025) (external site) · Cardinal Cryptography (GitHub) — aleph-node releases (external site)
-
KinetFlow launched as the legacy bridge successor and announced route closures
Conflux announced KinetFlow as Zero Gravity Portal's successor on 25 November 2025. Its closure notices cited Heco's January shutdown, planned the OK Chain route's closure (26 November in the English notice, 26 December 2025 in the Chinese one), and left the planned eSpace–Ethereum closure date blank. Completion of every planned closure was not established.
- Implementation:Launched
- Release:announced 2025-11-25
- Activation:project-reported; KinetFlow's own site could not be read
Sources: Conflux Forum — KinetFlow Is Now Live (external site) · Conflux Forum (KinetFlow notice) — Announcement on the Shutdown of Certain Cross-Chain Bridge Services (external site) · Conflux Forum (KinetFlow notice) — 关于部分跨链桥功能关闭的公告 (Chinese notice on the shutdown of certain cross-chain bridge functions) (external site) · Conflux Forum (Conflux Foundation notice) — Announcement: ShuttleFlow is closing its services on 2023.11.08 (external site)
-
Granite activated on Avalanche Mainnet
Avalanche's incident review records Granite v1.14.0 as active on Mainnet since 19 November 2025 and as the permanent resolution for a stateful-precompile delegatecall issue. The review says it was not exploited on Mainnet or a public Avalanche L1.
- Implementation:Released
- Release:Stable release
- Activation:Mainnet active
Source: Avalanche Builder Hub — Delegatecall Incident Overview (external site)
-
Matcha (v6) upgrade activated on Celestia Mainnet Beta
The Matcha upgrade activated at height 8,662,012. It bundled six changes: issuance cut to about 2.5% with a higher minimum validator commission, unbonding shortened to about 14 days, a 7-day light-client trusting period, higher block, square and transaction size limits, removal of the TIA-only token filter on IBC and Hyperlane, and an extension to the validator signing interface.
- Proposal:CIP-042 Final
- Implementation:released in celestia-app v6
- Release:activated on Mainnet Beta
- Activation:active from height 8,662,012
Sources: Celestia Docs — Network upgrades (external site) · Celestia Improvement Proposals — CIP-042: Matcha Network Upgrade (external site) · Celestia Improvement Proposals — CIP-038: Increase maximum block, square and transaction size (external site) · Celestia Improvement Proposals — CIP-039: Remove token filter for Hyperlane and IBC (external site) · Celestia Docs — Staking, governance, & supply (external site)
-
dymd v4.0.1 released with a fix for the eth_gasPrice query
Dymension contributors published dymd v4.0.1 on 2025-11-24, a week after v4.0.0. The release notes list one change: a fix for the eth_gasPrice query in the Hub's Ethereum JSON-RPC interface, which they describe as malformed (pull request 2114). The notes say the release does not break consensus and can be installed without coordination.
- Implementation:fix merged as pull request 2114
- Release:released 2025-11-24 as v4.0.1
- Activation:no network activation; each operator installs it, and the notes say no coordination is needed
Sources: Dymension contributors — Dymension v4.0.1 release notes (external site) · Dymension contributors — Releases · dymensionxyz/dymension (external site)
-
USE dollar stablecoin launch event announced
Ergo Platform announced a community liquidity event starting 25 November 2025 for USE, a dollar stablecoin built on the Dexy design. Contributors' ERG was to seed a USE/ERG pool whose LP tokens are locked for two years, and parameters start under a 3-of-5 multisig committee.
- Proposal:design documented in Ergo's docs
- Implementation:contracts deployed per later docs notes (not independently checked)
- Release:liquidity event scheduled 2025-11-25 to 2025-12-01
- Activation:later docs record minting activity; launch date not confirmed
Sources: Ergo Platform — Ecosystem Spotlight: USE, a Universal Stablecoin for Ergo (external site) · ErgoDocs (Ergo Platform) — USE (USD stablecoin) (external site) · ErgoDocs (Ergo Platform) — Dexy: A Seigniorage-Based Stablecoin (external site)
-
Monad public mainnet launched
Monad's documentation records public mainnet launch on 24 November 2025. Circle's announcement that day confirms USDC and CCTP live on Monad, and Wormhole's announcement confirms the mainnet bridge launch.
- Implementation:public mainnet running Category Labs' monad-bft and monad clients
- Release:mainnet launch confirmed in Circle and Wormhole announcements
- Activation:live since 24 November 2025
Sources: Circle — Now available: USDC, CCTP, Wallets and Contracts on Monad (external site) · Wormhole — Monad is live with native bridge powered by Wormhole (external site) · Monad Documentation (Monad Foundation) — Introduction (external site) · Monad Foundation (monad-crypto) — Monad mainnet token registry (external site)
-
EGLD moved from a supply cap to tail inflation
Release v1.11.1, Staking V5 and New Emissions Model Phase 1, implemented the economic change approved by governance in October 2025. From epoch 1951 (about 2 December 2025) issuance is calculated from the current total supply, starting at 8.757% a year, falling by 0.25 percentage points each economics year, with a 2% floor, and is split among staking rewards (50%), an ecosystem growth fund (20%), a growth dividend (20%) and protocol sustainability (10%).
- Proposal:approved by on-chain vote in October 2025 according to MultiversX's glossary
- Implementation:implemented in node v1.11.1
- Release:v1.11.1 released 2025-11-24
- Activation:active from epoch 1951 per the mainnet economics file
Sources: MultiversX — Release: Staking V5 and New Emissions Model - Phase 1 - v1.11.1 (external site) · multiversx/mx-chain-mainnet-config — Mainnet economics.toml (master, checked 11 October 2026) (external site) · MultiversX Docs — Terminology (external site)
-
Final company release records that its Kadena mainnet stopped
chainweb-node 2.32.0, the last company release, states that the company-run Kadena mainnet stopped producing blocks at 23:26:15 UTC on 15 November 2025. It publishes the final cut, removes the bootstrap nodes and the node expiry date, and precedes archiving of the repository.
- Implementation:final release
- Release:released 2025-11-22; repository archived 2025-11-24
- Activation:block production stopped 2025-11-15
Sources: Kadena LLC — chainweb-node releases (external site) · Kadena LLC — chainweb-node repository (archived) (external site) · Kadena LLC — chainweb-node changelog (Kadena LLC) (external site) · Kadena Community Edition — KDA Community Edition GitHub organization (external site)
-
FIP.14 accepted: Web2Json attestations for the Flare Data Connector, with no mainnet source at review
FIP.14 was accepted with 94.66% of votes cast in favour. It proposed Web2Json attestations from vetted web APIs, with Foundation review and Management Group votes on sources and fees. Current docs agree that no source is configured on Flare Mainnet or Songbird and requests revert. The setup guide now calls Web2Json deprecated on all networks, including Coston and Coston2, while the type page still lists testnet sources. Testnet availability is unresolved.
- Proposal:accepted on 5 December 2025
- Implementation:attestation type implemented; no Flare Mainnet source configured at review
- Release:Attestation type documented; the setup guide says deprecated on all networks, while the type page still lists Coston/Coston2 sources.
- Activation:not usable on Flare Mainnet at review: requests revert
Sources: Flare Governance Proposals — FIP.14: Add Support for FDC Web2 Attestations (external site) · Flare Developer Hub — Web2 FDC Setup (external site) · Flare Developer Hub — Flare Data Connector (FDC) (external site) · Flare Developer Hub — Web2Json attestation type and network availability (external site)
-
Validators told to publish a daily reference rate for aligned stablecoins
The official node history records a reference-rate publishing change on 19 November 2025. The current guide tells active validators to publish daily at 22:00 UTC using a Native Markets reference implementation. Aligned-stablecoin documentation uses the stake-weighted median vote in its reserve-yield calculation.
- Implementation:reference publisher documented in the node guide
- Release:Documented
- Activation:mainnet activation date not confirmed
Sources: hyperliquid-dex (GitHub) — hyperliquid-dex/node commit history (external site) · hyperliquid-dex (GitHub) — hyperliquid-dex/node: Running a node (external site) · Hyperliquid Docs — Aligned quote assets (external site)
-
Casper 2.1 released: 8-second minimum block time and burning of all transaction fees
Casper node release 2.1.0, a configuration update, halved the minimum block time to 8 seconds and switched transaction fees from payment to the block proposer to burning, which validators had approved in vote CVV005. Release 2.1.1 followed on 2025-12-01 with a fix to delegation minimums and settings that halve block capacity while doubling time windows. The Casper Association says Casper 2.1 is live on mainnet.
- Proposal:fee burning approved by validator vote CVV005 (proposal posted 2025-09-17)
- Implementation:configured in casper-node v2.1.0, with binary fixes in v2.1.1
- Release:released 2025-11-18 (v2.1.0) and 2025-12-01 (v2.1.1)
- Activation:live on mainnet per Casper Association posts; activation era not confirmed; the 2.2.2 mainnet chainspec carries both settings
Sources: Casper Network (GitHub) — casper-node v2.1.0 release notes (external site) · Casper Network (GitHub) — casper-node v2.1.1 release notes (external site) · Casper Association — Casper 2.1: Faster and More Efficient for the Real World (external site) · Casper Network forum — [CVV005] Proposal: Enable Burning Mechanism (external site) · Casper Association — Casper End-of-Year X Space Recap: 2025 in Review, New DEX Announced Live, and the Path Forward (external site) · Casper Network (casper-node repository, GitHub) — Casper mainnet chainspec, protocol version 2.2.2 (external site)
-
Polygon zkEVM switched from full execution proofs to pessimistic proofs
Polygon announced it would migrate Polygon zkEVM mainnet from full execution proofs to pessimistic proofs on 3 December 2025, with the bridge paused for about six hours. After the change, Ethereum checked only the chain's bridge accounting, not its state. L2BEAT records the change between 3 and 5 December 2025 and now lists the chain as neither a rollup nor a validium.
- Proposal:announced by Polygon; no governance vote described
- Implementation:contract changes recorded by L2BEAT on 3 to 5 December 2025
- Release:pessimistic proof system from Polygon's shared bridge stack
- Activation:active from December 2025 until the July 2026 shutdown
Sources: Polygon Community Forum — Announcement - zkEVM Migration Update (external site) · L2BEAT — Polygon zkEVM (external site) · Polygon Developer Docs — Pessimistic Proof: Architecture (external site)
-
Sonic proposed veSONIC staking and boosts for node holders
Sonic's first numbered proposal would let node holders stake any amount of veSONIC, unstake at any time, and use a boost that raises a node's effective production weight, shifting its share of a fixed daily reward pool.
- Proposal:proposal published
- Implementation:proposal contains conflicting activation wording; implementation not established
- Release:not stated
- Activation:no result or active deployment established
Source: Sonic SVM — Proposal #01: Activation of veSONIC Staking and Boost Mechanism (external site)
-
Beyond software released as dymd v4.0.0
The v4.0.0 release adds Hyperlane, a Kaspa bridge module, hardware-attested RollApp finalization, IBC rate limiting and launchpad changes. The official Beyond proposal is marked approved. The previously cited exact mainnet activation height could not be re-established.
- Proposal:approved in the official proposal title; exact vote-end date not re-established
- Implementation:features included in v4.0.0
- Release:released 2025-11-17
- Activation:exact mainnet activation height not re-established; explorer reports the later v4.0.2 client
Sources: Dymension forum — [PROP# 31] [APPROVED] The RENEWED Beyond Upgrade (external site) · Dymension contributors — Dymension v4.0.0 release notes (external site) · Staking Explorer — Dymension network parameters (external site)
-
Required Fraxtal node upgrade before Ethereum's Fusaka hard fork
Frax published a required mainnet node release updating its op-geth and op-node forks so Fraxtal nodes would keep following Ethereum through the Fusaka hard fork on 3 December 2025. The release warned that nodes left un-upgraded would see a chain split.
- Implementation:Released
- Release:mainnet-20251117 node release
- Activation:needed before Ethereum's Fusaka activation on 2025-12-03
Source: Frax Finance on GitHub — fraxtal-node releases (external site)
-
Governance cut Initia's active validator cap from 50 to 20
Proposal 60 passed on 2025-11-14 and changed the multi-staking parameter for the maximum number of active validators from 50 to 20. The Initia Foundation's forum post argued that rewards spread over 50 validators did not cover secure operation. The live parameter read on 2026-10-12 was 20, with only 10 validators bonded.
- Proposal:passed (proposal 60)
- Implementation:parameter change executed on chain
- Release:no software release needed
- Activation:active; cap of 20 observed 2026-10-12
Sources: Initia L1 governance (on-chain record) — Proposal 60: Active Validator Set Reduction (external site) · Initia Forum (Initia Foundation) — Active Validator Set Reduction Proposal (external site) · Initia Labs public REST endpoint — Live multi-staking parameters (external site) · Initia Labs public RPC endpoint — Live consensus validator set (external site)
-
USDT0 launched on Conflux eSpace
The Conflux team announced USDT0 on eSpace, a dollar stablecoin minted against USDT locked on Ethereum and moved with LayerZero messaging, and began a gradual migration from the older bridged cUSDT. USDT0's own deployment list includes the Conflux eSpace contracts.
- Implementation:token and OFT contracts listed for eSpace in USDT0's deployment table
- Release:launch announcement published 2025-11-12
- Activation:listed in USDT0's deployment table at review
Sources: Conflux Forum (Conflux team) — Tether USDT0 Officially Launches on Conflux (external site) · USDT0 — USDT0 deployments (external site) · USDT0 — The USDT0 Network (external site) · Tether — Supported protocols (external site) · USDT0 — Security (external site)
-
Core announced the Hermes mainnet hard fork
Core's 12 November 2025 announcement scheduled Hermes for 25 November at 08:00 UTC with v1.0.22. Features include validator finality votes, maintenance mode, BLS12-381 operations, historical block-hash access and delegated account code. Release notes describe two-block finality under normal voting; it is not an unconditional timing guarantee.
- Proposal:BNB Smart Chain proposals adopted by Core (BEP-126 and others)
- Implementation:shipped in client v1.0.22
- Release:mandatory mainnet release
- Activation:configured for 2025-11-25 08:00 UTC; Core reported Hermes delivered on 2025-12-22; activation was not independently observed
Sources: Core DAO — Hermes hardfork on mainnet (external site) · Core DAO (GitHub) — core-chain v1.0.22 (Hermes mainnet) (external site) · Core DAO (GitHub) — Chain configuration source (params/config.go) (external site) · Core DAO — Hermes upgrade guidelines for validators and full node operators (external site) · Core DAO — The Core revenue roadmap (external site)
-
Spring node software moved from a chain-bound Business Source License to MIT
The cited Spring commit is titled as a move to MIT and removes the previous Business Source License terms. The current main-branch license contains MIT permission language and credits the Vaulta Foundation, EOS Network Foundation and earlier EOSIO contributors. The commit is dated 12 November 2025, after every tagged upstream release. Vaulta's protocol page still describes Spring as licensed under the Business Source License.
- Implementation:license file changed on the main branch
- Release:no tagged Spring release includes it; the newest upstream tag, v2.0.0-dev1.3, was published on 27 August 2025
- Activation:not a protocol change
Sources: AntelopeIO (GitHub) — Spring commit e6a99f6: Update LICENSE (Move to MIT License) (external site) · AntelopeIO (GitHub) — Spring current license (external site) · AntelopeIO (GitHub) — Spring releases (external site) · AntelopeIO (GitHub) — Spring v1.2.2 release notes (external site) · Vaulta — Vaulta protocol (external site)
-
Native EVM went live on Injective mainnet with the v1.17.0 upgrade
Injective's embedded EVM (chain ID 1776) launched on mainnet on 11 November 2025. The v1.17.0 upgrade, approved as IIP 583, was scheduled for block 141,150,000 at 14:00 UTC that day. EVM contracts run in the same blocks as CosmWasm and the native modules and share token balances through the MultiVM Token Standard.
- Proposal:approved as IIP 583
- Implementation:shipped in injective-core v1.17.0
- Release:Released
- Activation:applied at block 141,150,000 according to the chain's upgrade record; active on mainnet since 11 November 2025
Sources: Injective — Welcome to the Injective Era: Native EVM Mainnet Launch (external site) · Injective Docs — Upgrade to v1.17.0 (external site) · InjectiveFoundation/injective-core on GitHub — injective-core CHANGELOG (tag v1.20.3-safeharbor.2) (external site) · Injective Labs (public sentry node) — Applied upgrade plan v1.17.0 (injective-1 public REST endpoint) (external site)
-
Clarity 4 activated on Stacks mainnet
SIP-033 and SIP-034 activated at Bitcoin block 923,222, bringing Clarity 4 with functions for checking another contract's code hash, restricting a contract's own asset movements, reading block time and verifying secp256r1 signatures, plus finer-grained tenure budget extensions.
- Proposal:SIP-033 and SIP-034 approved
- Implementation:Released
- Release:Activated
- Activation:active from Bitcoin block 923,222
Sources: Stacks Labs — Clarity 4 is Now LIVE (external site) · Stacks Documentation — Latest Updates (external site)
-
Dash Core 23.0.0 released, rebuilding compact filters for light wallets
Dash Core 23.0.0, the first 23.x release, migrated masternode data to a new internal format, rebuilt the compact block filter index to include Dash special transactions such as masternode registrations and asset locks, randomized wallet change amounts and raised the minimum peer protocol version. It was required for masternodes and evonodes but was not a hard fork.
- Implementation:shipped in Dash Core 23.0.0
- Release:stable release published 2025-11-10
- Activation:no consensus change; took effect as nodes upgraded
Sources: Dash Core developers (dashpay) — Dash Core 23.0.0 release announcement (external site) · Dash Core developers (dashpay) — Dash Core v23.0.0 release notes (external site)
-
Dymension team describes the Kaspa bridge design
The team published its Kaspa bridge architecture on 2025-11-10. It describes locking KAS under a multisignature arrangement and minting its representation on the Hub. The module shipped in v4.0.0; the earlier entry's specific bootstrap vote and later Solana enrollment were not re-established.
- Proposal:specific proposal 32 outcome not re-established
- Implementation:Kaspa module included in v4.0.0
- Release:released with v4.0.0 on 2025-11-17
- Activation:bootstrap vote and current route configuration not re-established
Sources: Dymension forum (Dymension team) — Dymension Kaspa Bridge Design Details (external site) · Dymension blog — Kaspa Meets Dymension (external site) · Dymension — Dymension Blog (external site) · Dymension contributors — Dymension v4.0.0 release notes (external site)
-
Fraxtal testnet replaced by a new testnet on Ethereum's Hoodi network
Frax replaced its Fraxtal testnet with a new one that settles to Ethereum's Hoodi test network and runs current node versions. Frax's network page now lists the Fraxtal testnet as chain ID 2523 with its own RPC endpoint and explorer.
- Implementation:Released
- Release:testnet-20251010 node release
- Activation:new testnet live per Frax's network page
Sources: Frax Finance on GitHub — fraxtal-node releases (external site) · Frax Docs — Fraxtal Network Information (external site)
-
UNIfication proposal to route Unichain sequencer fees to the UNI burn (executed 27 December 2025)
Uniswap Labs and the Uniswap Foundation posted the UNIfication proposal, which turns on Uniswap protocol fees and directs all Unichain sequencer fees, after Ethereum data costs and the 15% share paid to Optimism, into a collector contract on Unichain whose assets can be withdrawn only by burning UNI. Tally records the proposal as executed; its execution block dates to 27 December 2025.
- Proposal:passed onchain vote
- Implementation:executed on Ethereum
- Release:fee collector contracts deployed on Unichain
- Activation:executed 2025-12-27
Sources: Uniswap Labs Blog — UNIfication (external site) · Uniswap governance forum — UNIfication Proposal (external site) · Tally — UNIfication (Uniswap proposal 93) (external site) · Uniswap Labs (developer docs) — Uniswap Protocol Fees (external site) · Uniswap Labs (developer docs) — Protocol Fee Deployments (external site)
-
Hyperlane Warp routes connect LUNC and USTC to BNB Smart Chain, Ethereum and Solana
The Hyperlane integration proposal was published on 7 November 2025. The registry now lists a native LUNC route to Ethereum, BNB Smart Chain and Solana. Governance ownership and migration proposals passed on 6 and 8 October 2026. The developer's October 8 delivery report says production deployment and the fix for duplicate-signature counting are complete; the migrated state was not independently queried.
- Proposal:integration approved; ownership #12229 and migration #12230 recorded passed October 6/8, 2026
- Implementation:Warp routes registered; developer reports migration fixing duplicate-signature verification
- Release:developer links bridge.terra-classic.io; page resolves as an application shell
- Activation:production operation and completed migration reported October 8; independent post-migration state verification remains a gap
Sources: Igor Veras, Terra Classic governance forum — Hyperlane integration on Terra Classic: original proposal (external site) · Hyperlane Registry (hyperlane-xyz/hyperlane-registry) — Hyperlane Registry: LUNC Warp route configuration (external site) · LUNC Community — Terra Classic governance archive (external site) · Fragwuerdig, Terra Classic governance forum — Hyperlane infrastructure ownership review (external site) · Igor Veras, Terra Classic governance forum — Hyperlane verification-contract migration proposal and audit (external site) · Igor Veras, Terra Classic governance forum — Hyperlane on Terra Classic — delivery report and payment proposal (external site)
-
Fusaka was scheduled with client releases and later confirmed active on Mainnet
The November announcement scheduled activation for December 3, 2025 and listed client releases. A later ethereum.org upgrade page directly reports that Fusaka went live that day. Scheduling, implementation releases and observed activation remain separate evidence.
- Type:Upgrade
- Proposal:Included
- Release:Mainnet client releases listed
- Activation:Activated mainnet
Sources: Ethereum Foundation — Fusaka Mainnet Announcement (external site) · ethereum.org community — Fulu-Osaka (Fusaka) (external site) · Ethereum Foundation — Protocol Priorities Update for 2026 (external site) · Ethereum contributors — Ethereum consensus specifications (external site) · Ethereum Foundation STEEL team — Ethereum execution-layer specifications (external site)
-
Community Edition node released, forking Kadena on 8 November 2025
Community Edition released node 3.0 on 6 November 2025 for a fork scheduled at 04:00 UTC on 8 November. It moved platform-share and namespace keysets to community keys and added bootstrap nodes. The changelog describes 3.0.1 rewinding nodes from the company branch to the fork point; 3.1 later removed that rewind.
- Proposal:community decision announced
- Implementation:implemented in releases 3.0 and 3.0.1
- Release:released 2025-11-06
- Activation:November 2025 split supported by subsequent rewind notes; 04:00 UTC on 8 November was the scheduled fork time, not a freshly measured block timestamp
Sources: Kadena Community Edition — chainweb-node Community Edition 3.0 (external site) · Kadena Community Edition — chainweb-node Community Edition 3.1 (external site) · Kadena Community Edition — chainweb-node Community Edition changelog (external site) · Kadena Community Edition — Who We Are (external site) · Kadena LLC — chainweb-node releases (external site)
-
Mysticeti v2 and the Transaction Driver became Sui's default transaction path
Sui announced Mysticeti v2 on 6 November 2025. It integrates transaction validation with consensus and introduces Transaction Driver, which sends a transaction to one selected validator and can retry with others. Node release mainnet-v1.60.1, published on 10 November, made both the default. The announcement reported latency measurements from a rollout already running on Mysten Labs and partner full nodes; those results predated the release.
- Implementation:implemented in node v1.60
- Release:mainnet-v1.60.1 released 2025-11-10
- Activation:default transaction path from v1.60 according to the release notes; rollout across individual validators not independently observed
Sources: Sui Foundation blog — Mysticeti v2 (external site) · MystenLabs/sui repository — mainnet-v1.60.1 (external site)
-
Governance proposal to double Dual Staking CORE-to-BTC ratios
Core published a governance proposal to double the CORE-to-BTC ratios that set Dual Staking reward tiers, from 34,000, 12,750 and 4,250 CORE per BTC to 68,000, 25,500 and 8,500, with a three-day vote from 5 to 8 November 2025 and implementation right after if approved.
- Proposal:governance proposal with a vote from 2025-11-05 to 2025-11-08
- Implementation:proposal ratios appear in a conditional documentation example; implementation not confirmed
- Release:parameter change; no client release involved
- Activation:not confirmed from a primary result notice
Sources: Core DAO — Governance proposal to adjust the Dual Staking CORE to BTC ratios (external site) · Core DAO Docs — Dual Staking overview (external site)
-
Berachain released Prague3 restrictions and a Prague4 reversal after the BEX incident
Bera-Reth v1.2.0, published on 4 November 2025, introduced Prague3 restrictions on BEX vault use in response to the Balancer exploit of 3 November. Version 1.3.0, published on 7 November, introduced Prague4 to remove the account and transfer restrictions, scheduled for 12 November at 16:00 UTC. These primary notes confirm released behavior and scheduling; they do not establish exact halt duration or all recovery outcomes.
- Implementation:Bera-Reth v1.2.0 (Prague3) and v1.3.0 (Prague4)
- Release:Released
- Activation:Prague3 activation time not stated in its release notes; Prague4 scheduled for 2025-11-12 16:00 UTC
Sources: Berachain (GitHub) — bera-reth v1.2.0 (Prague3 emergency hard fork) (external site) · Berachain (GitHub) — bera-reth v1.3.0 (Prague4 hard fork) (external site)
-
Qtum Core v29.1 hard fork released
Qtum released Qtum Core v29.1, a mandatory hard fork that rebased the node on Bitcoin Core 29.1 and added Pectra-era contract features, including a BLS12-381 precompile and a contract for looking up older block hashes. It activated at block 5,483,000, which the explorer dates to 12 January 2026.
- Implementation:Released
- Release:released 2025-11-04
- Activation:activated at block 5,483,000 on 2026-01-12
Sources: Qtum project — Qtum Core v29.1 - Hard Fork - Upgrade to bitcoin core 29.1 - EVM Pectra (external site) · Qtum Blog — What's Included in the Qtum v29.1 Hard Fork? (external site) · qtum.info — qtum.info block 5,483,000 (external site) · Qtum Blog — Qtum Development Updates for 2026 (external site)
-
BounceBit Prime added Standard Chartered custody with OKX collateral mirroring
BounceBit announced that Prime's tokenised Treasury strategies would pair custody at Standard Chartered with trading on OKX, where collateral is mirrored to the exchange instead of being deposited there.
- Implementation:described as live by BounceBit
- Release:announced 3 November 2025
- Activation:not independently verified
Sources: BounceBit — BounceBit, OKX and Standard Chartered Expand Institutional Access to Tokenized U.S. Treasury Yield Strategies via Collateral Mirroring Program (external site) · BounceBit — Architecture (external site) · BounceBit — BounceBit Prime introduction (external site)
-
Osmosis v31 approved: automatic OSMO burns and a higher minimum gas price
Governance proposal 990 passed and scheduled the v31 upgrade at height 47,626,000. The release automates burning of the burn share of taker-fee OSMO, applies the same burn and staker split to OSMO bought back with other tokens, spreads staker payouts from taker fees over several epochs, adds an inflation endpoint and triples the consensus minimum gas price to 0.03 uosmo per unit of gas.
- Proposal:proposal 990 passed
- Implementation:released as v31.0.0, with patch releases through v31.0.3
- Release:released 2025-10-27
- Activation:applied at height 47,626,000 per on-chain upgrade record
Sources: Osmosis on-chain state via Osmosis public REST endpoint — Osmosis proposal 990: Osmosis v31 Software Upgrade (on-chain record) (external site) · Osmosis maintainers — Osmosis v31.0.0 release (external site) · Osmosis maintainers — Osmosis changelog (external site) · Osmosis on-chain state via Osmosis public REST endpoint — Applied upgrade plan v31 (on-chain query) (external site)
-
Manta launches Manta Labs, an application program not tied to Manta Pacific
Manta's 30 October 2025 announcement introduced Manta Labs to build and incubate consumer applications across chains, naming SUPERFORTUNE and Junk.fun as incubated apps. It offered developer support without requiring applications to run on Pacific. Manta's current home page also promotes Incognitive, an on-device AI assistant; these application announcements do not establish a Pacific protocol activation.
- Implementation:program announced; incubated apps named
- Release:not a software release
- Activation:no protocol activation
Sources: Manta Network (Medium) — Introducing Manta Labs (external site) · Manta Network — Manta Network home page (external site)