News
Follow what has changed.
Reviewed news adds a checked explanation of a development and the stage the evidence supports. Automatic headlines are for discovery and are labelled as not yet reviewed. Publication dates and review dates are shown separately, and older items stay as history.
Reviewed news
894 reviewed developments across 151 chains. Each record retains its own review date. A missing review date stays unknown; a check or collection date never replaces it.
A weekly reviewed news run is planned and not yet running, so many chains will show Review overdue until it starts. The items stay available as history.
Sorted by publication date · newest first; equal dates follow the alphabetical chain order. Page 11 of 18.
One chain's developments, A to Z
-
Moonriver's MOVR set to migrate to Base on the same deadline
The sister network on Kusama announced a one-for-one move of MOVR to an ERC-20 token on Base by 2026-07-31, routed through Moonbeam because the bridge contract lived there.
- Implementation:Official announcement describes XCM into Moonbeam followed by the migration bridge to Base.
- Release:The July 7 announcement gives the Base MOVR contract address.
- Activation:The announced holder deadline was July 31, 2026; Moralis later reported closure.
Sources: Moonbeam — Moonriver Strategic Update: MOVR is Migrating to Base (external site) · Moralis — Moralis product changelog (Moonbeam support removal notices) (external site)
-
Nominators made unslashable with a two-era unbonding period
Referendum 1910 disabled nominator slashing and reduced the unbonding period for new requests to 2 eras. Earlier requests retain their original schedule. Validators continue to bear slashing risk on their own stake; executed Referendum 1890 established a 10,000 DOT minimum.
- Proposal:Referendum 1910 executed
- Implementation:staking configuration change on Polkadot Hub
- Release:parameter change by referendum; no separate release reviewed
- Activation:active since 2026-07-06
Sources: Subsquare (Polkadot OpenGov) — Referendum 1910: Staking Configuration Update: Nominator Slashing & Unbonding Parameters (external site) · Subsquare (Polkadot OpenGov) — Referendum 1890: Staking: set min validator bond to 10K DOT (external site) · Polkadot Forum — Changes on Polkadot in March 2026 (external site) · Polkadot Wiki — Chain State Values (external site) · Polkadot Forum (enactment announcement attributed to Paolo) — Staking Updates! Nominators no longer slashable & 2 day unbonding (external site)
-
ICF published its June 2026 treasury snapshot
The Interchain Foundation published a treasury snapshot reporting its fiat and cryptocurrency holdings as of June 30, 2026. This is foundation transparency reporting, not Cosmos Hub chain state, consensus, or governance execution.
- Release:published transparency report
- Activation:not a Cosmos Hub protocol activation
Sources: Interchain Foundation — ICF Treasury Snapshot: June 2026 (external site) · Interchain Foundation — Interchain Foundation Medium RSS (external site)
-
Gnosis Pay published a post-mortem of the June 2026 card safe exploit
Gnosis Pay reported that on 1 June 2026 attackers abused a signature-validation flaw in the Zodiac Delay and Roles modules used by its card safes, taking about 1.5 million dollars and leaving about 300 thousand dollars inaccessible across 5,281 wallets. Gnosis absorbed the losses and restored user funds. The flaw sat in module code, not in Gnosis Chain consensus.
- Implementation:fix and additional security reviews described by the operator
- Release:post-mortem published
- Activation:services restored in phases between 3 and 7 June 2026 per the post-mortem
Source: Gnosis Pay — Post-Mortem: Gnosis Pay Vulnerability Exploit (external site)
-
Moonbeam announced GLMR's move to Base and the end of its Polkadot parachain
Moonbeam said GLMR would migrate one-for-one to an ERC-20 token on Base, asked holders to bridge by 2026-07-31 and to withdraw funds from on-chain applications first, and said the parachain would run only through the transition. It also announced Moonbeam Protocol for AI-agent settlement on Base.
- Implementation:The July 3 announcement states that the GLMR migration bridge was open.
- Release:The announcement supplies the deployed Base GLMR contract address.
- Activation:The announced deadline was July 31, 2026; Moralis later reported that holder bridging had closed.
Sources: Moonbeam — Moonbeam Strategic Update: Moonbeam Network Relaunches on Base (external site) · Moralis — Moralis product changelog (Moonbeam support removal notices) (external site)
-
Polygon zkEVM sequencer switched off; claims move to Ethereum
Polygon's sunset page says that as of 3 July 2026 the Polygon zkEVM Mainnet Beta sequencer has been sunset, the network no longer produces blocks, and the bridge can no longer process withdrawals from it. Wallet balances are recoverable on Ethereum through a claims interface opening no earlier than 13 July 2026 and available through 31 December 2027. Assets held in smart contracts are not recoverable through it.
- Implementation:sequencer switched off
- Release:claims interface live, per Polygon's sunset page
- Activation:chain halted; claims open until 31 December 2027
Sources: Polygon Labs — Polygon zkEVM: Mainnet Beta Sunset and Fund Claims (external site) · Polygon Community Forum — Polygon zkEVM Mainnet Beta Sunset: Claim Your Funds (external site) · Polygon Labs — zkEVM Exit Claim (external site) · Alchemy — Polygon zkEVM Deprecation Notice (external site) · L2BEAT — Polygon zkEVM activity (daily transaction counts, full history) (external site)
-
Bridged USDC went live on Astar through Swapper
Astar announced bridged USDC deployed by Swapper under Circle's bridged-USDC standard: USDC is locked on the source chain and minted on Astar through Chainlink CCIP, with no liquidity pool. Astar says it replaces Celer-bridged USDC and other older variants as the standard route, and that bridged USDC is not Circle-issued USDC.
- Implementation:deployed by Swapper
- Release:announced as live
- Activation:live per Astar's post; the contract and supply were not checked on chain
Source: Astar Network — Bridged USDC Is Now Live on Astar (external site)
-
Beam disclosed an emergency hard fork fixing a range-proof flaw
Beam disclosed that an emergency hard fork at block 3,928,666 fixed a flaw in its Bulletproofs range proofs that could in theory have let someone create outputs with negative amounts and inflate the supply. Developers said a scan of the chain's history found no such pattern, and they assessed exploitation as unlikely.
- Implementation:fix shipped in the emergency-hf6 pre-release and hotfix release 7.5.14493
- Release:emergency-hf6 pre-release published 2026-06-30; 7.5.14493 published 2026-07-01
- Activation:active at block 3,928,666 per Beam; a community explorer node dates that block to 1 July 2026
Sources: Beam blog — Hard Fork Six (external site) · BeamMW — Emergency network upgrade (emergency-hf6) release notes (external site) · BeamMW — HOTFIX - Groovy Gluon 7.5.14493 release notes (external site) · BeamMW — Beam node and wallet releases (external site) · Community explorer node (0xmx.net) — Block 3,928,666, the sixth hard fork height (mainnet explorer node) (external site)
-
Casper node 2.2.2 security release published after the 2.2.1 fix
Casper published node 2.2.1 on 26 May 2026, rejecting transactions initiated by the system account, and 2.2.2 on 1 July 2026, described only as a security release. Its mainnet chainspec specifies activation era 22931; live activation was not independently verified.
- Implementation:casper-node v2.2.1 and v2.2.2
- Release:released 2026-05-26 and 2026-07-01
- Activation:era 22931 configured; live activation not independently verified
Sources: Casper Network (GitHub) — casper-node v2.2.1 release notes (external site) · Casper Network (GitHub) — casper-node v2.2.2 release notes (external site) · Casper Network (casper-node repository, GitHub) — Casper mainnet chainspec, protocol version 2.2.2 (external site)
-
v9 upgrade cut Celestia's block time to about 3 seconds
The v9 upgrade activated at height 11,771,699. It carries CIP-048, which lowers the block time target from about 6 seconds to about 3 seconds by shortening consensus timeouts, and rescales block-count settings such as the evidence window so their real-time durations stay the same.
- Proposal:CIP-050 and CIP-048 marked Draft in the CIP repository
- Implementation:released in celestia-app v9; Mainnet Beta page lists v9.0.8
- Release:activated on Mainnet Beta
- Activation:active from height 11,771,699
Sources: Celestia Docs — Network upgrades (external site) · Celestia Improvement Proposals — CIP-050: v9 Network Upgrade (external site) · Celestia Improvement Proposals — CIP-048: Lower block time to 3 seconds (external site) · Celestia Docs — Mainnet Beta (external site) · celestiaorg — celestia-app v9.0.8 (external site)
-
Dash Core 23.1.7 hardens nodes against denial-of-service from peers
Dash Core 23.1.7 is a patch release focused on how nodes handle traffic from other peers. It stopped a network thread from running at full CPU when receive buffers back up, limited quorum key-generation messages to verified masternodes and checked their size and structure, fixed a null-pointer crash in BLS share verification, rejected oversized InstantSend input sets early and validated governance vote-sync requests. It also fixed builds on newer compilers. The developers said the issues do not affect consensus or put funds at risk.
- Implementation:shipped in Dash Core 23.1.7
- Release:stable patch release published 2026-07-01; superseded by 23.1.8 on 2026-08-03
- Activation:no consensus change; takes effect on each node as it upgrades
Sources: Dash Core developers (dashpay) — Dash Core 23.1.7 release announcement (external site) · Dash Core developers (dashpay) — Dash Core v23.1.7 release notes (external site)
-
NEP-645 proposed post-quantum transaction access keys
NEP-645 specifies ML-DSA transaction authorization and still labels the proposal text Draft. nearcore 2.13.0 shipped ML-DSA-65 support, which current access-key documentation describes as available. Validator/block signing and implicit-account derivation remain outside this key type's scope.
- Proposal:Draft at review
- Implementation:stated-stable-at-protocol-85-and-shipped-in-neard-2.13
- Release:Released code
- Activation:ML-DSA-65 transaction keys documented as available; validator and implicit-account roles excluded
Sources: NEAR NEPs — NEP-645: Post-Quantum Transactions (external site) · NEAR nearcore — nearcore 2.13.0 (external site) · NEAR Documentation — Access Keys (external site) · NEAR NEPs — NEP-645 public proposal discussion (external site)
-
Near One explained the shipped Wasmtime and Winch runtime
Near One described NEAR's Wasmtime integration with the Winch compiler, reported as shipped at protocol version 84. The article also discusses future compiler development.
- Implementation:shipped Wasmtime with Winch
- Release:publisher reports shipped runtime
- Activation:publisher reports protocol 84; activation date not supplied
Source: Near One — Replacing NEAR's Contract VM with Wasmtime (external site)
-
Robinhood announced public mainnet launch
Robinhood's July 1 newsroom post says the public mainnet was officially launching; the same-day Arbitrum post says mainnet was live on the Arbitrum Platform. Robinhood updated its post on July 30; the launch date remains July 1.
- Type:Launch
- Proposal:Completed announcement
- Release:Public mainnet announced live
- Activation:Announced active by two first party sources
Sources: Robinhood — Robinhood Accelerates Global Expansion with Robinhood Chain Mainnet, Stock Tokens, Agentic Trading and New Suite of DeFi Products (external site) · Arbitrum — Robinhood Chain mainnet is live, built with the Arbitrum Platform (external site)
-
Chia Network announced BuyXCH personal spending limits
CNI product announcement, not a consensus change: Chia Network announced personal spending-limit updates for BuyXCH. This record does not establish current product availability, regional eligibility, pricing or transaction status.
- Claim:Announced
Source: Chia Network Inc. — BuyXCH Personal Limits (external site)
-
dYdX Labs launched Arcus on Robinhood Chain and said dYdX v4 stays supported
dYdX announced Arcus, a decentralized exchange built jointly by dYdX Labs and Robinhood Crypto that runs on Robinhood Chain, which the post describes as an EVM-compatible Layer 2 built by Robinhood. The post said spot trading was live and opened a waitlist for perpetuals. It also said dYdX v4 will continue to be supported and that funds and positions remain accessible on dYdX Chain.
- Implementation:Arcus described as launched in the announcement
- Release:launched per the announcement: spot trading live, perpetuals on a waitlist
- Activation:not a dYdX Chain protocol change
Source: dYdX — A new arc (external site)
-
Draft ECIP-1130 proposes the Bastion EVM upgrade
Diego López León and Istora Mandiri opened ECIP-1130, a draft hard fork named Bastion. It would add transient storage opcodes, MCOPY, BLS12-381 and secp256r1 precompiles, a CLZ opcode, bounds and new pricing for MODEXP, and narrower SELFDESTRUCT behaviour. It leaves fees unchanged, defers account-code delegation and a per-transaction gas cap, and sets no activation block.
- Proposal:Draft ECIP
- Implementation:reference implementations still to be linked
- Release:not in any release reviewed here
- Activation:no activation block on Mordor or mainnet
Sources: Ethereum Classic Improvement Proposals — ECIP-1130: Bastion EVM and Protocol Upgrades (external site) · Ethereum Classic Improvement Proposals (GitHub) — ECIPs repository (external site)
-
Toccata hard fork activated on Kaspa mainnet
The Toccata upgrade activated at DAA score 474,165,565, adding covenants, covenant IDs, zero-knowledge proof verification in script and per-application sequencing commitments (KIPs 16, 17, 20 and 21). The default minimum relay fee rose from 1 to 100 sompi per gram.
- Proposal:KIPs 16, 17, 20 and 21 marked Active
- Implementation:implemented in Rusty Kaspa v2.0.0 and v2.0.1
- Release:released 2026-06-05 (v2.0.0) and 2026-06-15 (v2.0.1)
- Activation:active on mainnet since 2026-06-30
Sources: Kaspa (kaspa.org) — Developments (external site) · Kaspa developers (kaspanet) — Mainnet Toccata Release - v2.0.0 (external site) · Kaspa developers (kaspanet) — Mainnet Toccata Release - v2.0.1 (external site) · Kaspa developers (kaspanet) — Kaspa Toccata Hardfork Node Setup Guide (external site) · Kaspa Docs (kaspanet) — Toccata Dev Guide (external site) · Kaspa developers (kaspanet) — KIP 21: Partitioned Sequencing Commitment with O(activity) Proving (external site)
-
Sia Storage mobile app launched on iOS and Android
The Foundation's May 2026 recap reports that the Sia Storage mobile app launched for iOS and Android at Consensus Miami, with a free storage allowance. The app encrypts and erasure-codes data on the device and uses the Sia Storage hosted indexer to manage contracts with hosts.
- Implementation:apps released
- Release:launched on iOS and Android per the Foundation's recap
- Activation:available per the Foundation; not tested in this review
Sources: Sia Foundation blog — The State of Sia, May 2026 (external site) · The Sia Storage Company — Sia Storage (external site) · Sia Foundation (Sia Docs) — About Storing Data on Sia (external site) · Sia Foundation — Learn / Blocks and Transactions / File Contracts (external site)
-
MainNet moves to Canton protocol version 35 with a Logical Synchronizer Upgrade
Canton announced that Logical Synchronizer Upgrades are live on MainNet with Canton 3.5: the upgraded synchronizer runs in parallel and the switch completes in seconds or minutes. The Foundation's schedule set the MainNet upgrade from protocol version 34 to 35 for 27 June 2026, with party onboarding and other topology changes paused for the preceding 24 hours.
- Implementation:shipped in Canton 3.5
- Release:released; minimum Splice 0.6.5 for validators
- Activation:MainNet upgrade scheduled for 2026-06-27 13:00 UTC; Canton's 29 June post says the upgrades are live on MainNet
Sources: Canton Network Blog — Canton Network Goes Live with Logical Synchronizer Upgrades (external site) · Canton Network Forum (Announcements) — Canton 3.4 to canton 3.5 transition (external site) · Canton Network — Canton Network Blog (external site)
-
Native USDC, EURC and CCTP went live on Cronos
Cronos announced that Circle-issued USDC and EURC and Circle's CCTP were live on Cronos EVM. Circle's own pages list the Cronos USDC and EURC contracts and list Cronos as CCTP domain 32. Cronos says bridged USDC (USDC.e) keeps working during a transition in which the ecosystem moves liquidity to native USDC.
- Implementation:contracts deployed and listed by Circle
- Release:announced live 2026-06-29
- Activation:active as of this review
Sources: Cronos — Native USDC, EURC, and CCTP Are Live on Cronos (external site) · Circle — USDC contract addresses (external site) · Circle — EURC contract addresses (external site) · Circle — CCTP supported chains and domains (external site)
-
Loopring's exchange contract was replaced with an admin-only executor
The Loopring multisig upgraded the exchange proxy on Ethereum twice that day: first to a batch token distributor and, about three hours later, to new code whose only function lets the proxy owner make arbitrary calls from the exchange, including sending its assets. Normal operation stopped, and the forced-withdrawal and Merkle-proof exits in the old code no longer exist. L2BEAT archived the project at the same time.
- Implementation:upgrade executed on Ethereum; replacement code verified on Sourcify
- Release:admin executor contract
- Activation:active since 29 June 2026
Sources: L2BEAT — Loopring (external site) · L2BEAT (GitHub) — Loopring project configuration (external site) · L2BEAT (GitHub) — Loopring contract diff history (external site) · Sourcify — TokenDistributor verified source, first 29 June 2026 upgrade target (Ethereum 0x9cFA61e1472f648cd01Ff05E658987A2abA40F1B) (external site) · Sourcify — ProxyAdminExecutor verified source (29 June 2026 version) (external site) · Etherscan — Loopring: Exchange v2 (external site)
-
Ushuaia upgrade activated: larger data-availability bandwidth
Ushuaia, the 21st Tezos protocol upgrade, activated at block 13,857,889. It raised Data Availability Layer bandwidth from about 0.66 MB/s to 10 MB/s, made the data attestation delay dynamic (about 2 to 3 blocks instead of 11), and let rollup-specific virtual-machine upgrades activate through the rollup's own governance instead of a full layer 1 amendment cycle. Enshrined liquid staking and post-quantum tz5 accounts shipped disabled, for test networks only.
- Proposal:adopted by on-chain vote
- Implementation:implemented in Octez v25
- Release:Released
- Activation:active on mainnet since 2026-06-30 UTC; two features remain disabled on mainnet
Sources: Nomadic Labs on Tezos Spotlight — 15x Bandwidth, Better Rollup Governance: Ushuaia is Live! (external site) · Tezos documentation (docs.tezos.com) — History of amendments (external site) · Octez and Tezos protocol documentation — Version 25 release notes (external site)
-
Loopring announced the shutdown of its layer-2 exchange
Loopring announced that its exchange was being sunset. L2BEAT summarizes the post as saying the exchange no longer accepts deposits and that deposited tokens will be transferred to users. News reports add that the relayer went offline at once, and that final layer-2 balances, including pool positions, would be published for a two-week review before Loopring sent the assets to users' Ethereum addresses at its own cost. Loopring's website now states that Loopring is no longer operational.
- Proposal:announced by Loopring; the cited sources describe no governance vote
- Implementation:exchange contract replaced on 29 June 2026
- Release:no software release; a shutdown
- Activation:in effect; loopring.org says Loopring is no longer operational
Sources: L2BEAT — Loopring (external site) · Loopring — Loopring Has Shut Down (external site) · The Block — Ethereum zkRollup project Loopring sunsets DEX, citing lack of meaningful adoption (external site) · Crypto Adventure — Loopring DEX Shuts Down Trading As Relayer Goes Offline (external site)
-
Base published remediation for the June 25–26 block-production outages
Base reported two complete block-production halts lasting 116 minutes and 20 minutes. Its postmortem attributes both to stale execution journal state after transaction validation failure, records a sequencer patch and recovery, and separately identifies an engine-reset race that contributed to the recurrence.
- Type:Release
- Proposal:Not applicable
- Release:Sequencer remediation deployed
- Activation:Incidents resolved 2026 06 26
Source: Base Engineering Team — Postmortem: June 25th Block Production Outage (external site)
-
Gaia v27.5.0 released
Gaia v27.5.0 updated its ibc-go dependency from v10.6.0 to v10.7.0. Hub governance approved the upgrade in proposal 1044 (voting ended 7 Jul 2026), and it was applied at height 31,938,700.
- Release:Released
- Activation:activated on mainnet at height 31,938,700 after proposal 1044 passed
Sources: cosmos/gaia maintainers — Gaia v27.5.0 release notes (external site) · Cosmos Hub on-chain state via PublicNode REST endpoint — Cosmos Hub governance proposal 1044: Gaia v27.5.0 Upgrade (on-chain record) (external site) · Cosmos Hub on-chain state via PublicNode REST endpoint — Cosmos Hub applied upgrade plan v27.5.0 (on-chain query) (external site)
-
Lisk node v0.4.21 makes the Karst network upgrade mandatory for Lisk Mainnet
Lisk's node release v0.4.21 moved to op-node v1.19.1 and op-reth v2.3.2, the mandatory clients carrying the Karst activation time for Lisk Mainnet, 8 July 2026 at 16:00:01 UTC, pending governance approval. Release v0.4.22 followed on 29 June with op-reth v2.3.3 to fix gas estimation after Karst. The Superchain Registry's Lisk configuration lists the same Karst time.
- Proposal:pending governance approval when the release was published
- Implementation:shipped in lisk-node v0.4.21 and v0.4.22
- Release:mandatory node release
- Activation:scheduled for 2026-07-08 16:00:01 UTC in the registry; activation on chain not independently checked
Sources: Lisk (GitHub, LiskHQ/lisk-node) — Lisk node v0.4.21: mandatory upgrade ahead of Karst on Mainnet (external site) · Lisk (GitHub, LiskHQ/lisk-node) — Lisk node v0.4.22: mandatory op-reth patch ahead of Karst on Mainnet (external site) · Optimism (GitHub, ethereum-optimism/superchain-registry) — Superchain Registry: Lisk mainnet configuration (lisk.toml) (external site)
-
Story became the DATA Network and the IP ticker became DATA
The foundation announced that Story is becoming the DATA Foundation, the Story Network the DATA Network and the IP token DATA, one-to-one with no holder action required. It said the rename does not break integrations, the network runs without interruption and the validator set is unchanged, and it moved its stated focus from IP licensing to provenance, processing and licensing of AI training data through Trace, Poseidon and partner apps such as Kled.
- Implementation:Names changed on the Foundation site, docs and network resources; PIP Labs published a wrapped DATA contract described as a rebrand of wrapped IP.
- Release:announced 25 June 2026
- Activation:effective at announcement per the foundation; no chain upgrade was announced for it
Sources: The Data Foundation blog — We're becoming The DATA Foundation (external site) · DATA Foundation Docs — Mainnet: network resources (external site) · PIP Labs (GitHub) — WDATA: Wrapped DATA token (external site) · Ledger (npm package via jsDelivr) — @ledgerhq/cryptoassets 13.56.0 currency list (external site)
-
Neutron v11.1.0 updated CosmWasm dependencies at height 60580000
Neutron v11.1.0, published on GitHub on 25 June 2026, is marked as a consensus-breaking release that operators must not switch to early. Its listed changes update the CosmWasm virtual machine library (wasmvm, from 3.0.3 to 3.0.5 in the notes) and the wasmd contract module (v0.61.12, then a further update), and its upgrade handler only runs the standard module migrations. Expedited governance proposal 3, which passed on 30 June 2026, scheduled it at height 60580000 and describes the final versions as wasmd v0.61.14 and wasmvm v3.0.7; the operator notes require libwasmvm 3.0.7. The upgrade was applied at that height, about 1 July 2026. It is the last release in the original neutron-org repository, which was later archived.
- Proposal:expedited governance proposal 3 passed 2026-06-30
- Implementation:released as v11.1.0 (wasmvm and wasmd updates, standard module migrations)
- Release:released 2026-06-25
- Activation:applied at height 60580000 (on-chain applied plan), about 2026-07-01 15:00 UTC per the upgrade notes
Sources: Neutron contributors — Neutron v11.1.0 release (external site) · Neutron contributors (mainnet-assets) — Neutron v11.1.0 Upgrade, Instructions (external site) · Neutron contributors — v11.1.0 upgrade handler source (external site) · Neutron contributors — neutron-org/neutron releases feed (external site) · Neutron on-chain governance (via Solva REST endpoint) — Governance proposal 3: v11.1.0 upgrade (external site) · Solva public REST endpoint for neutron-1 — Applied upgrade plan v11.1.0 (on-chain query) (external site)
-
ZAN, Ant Digital Technologies' Web3 brand, joined as an enterprise validator
Theta Labs announced that ZAN, the Web3 brand of Ant Digital Technologies, is running an enterprise validator node and published its validator address. The post lists the other enterprise validators as including Google, Samsung, Sony, CAA, Binance, Deutsche Telekom, Docomo Global and Cloudician.
- Implementation:validator node announced as live
- Release:Announced
- Activation:announced live by Theta Labs on June 25, 2026; current stake not independently verified
Sources: Theta Labs blog — ZAN, Ant Digital Technologies' Web3 Brand, Joins Theta Network as Strategic Enterprise Validator (external site) · Theta Network Documentation — Running a Theta Validator (external site)
-
Cronos v1.7.8 adds an opt-in fix for failing transaction traces
The Cronos node repository published v1.7.8 as a regular release, not a pre-release. It addresses an old gas-accounting bug: when a node replays a transaction that is already on chain for debug_traceTransaction, debug_traceBlock or debug_traceCall, the fee it works out again can differ from the fee first charged, and the trace then fails. The release adds an optional traceReplay setting to the trace configuration. When it is set and the upfront fee deduction fails, the node logs a warning and finishes the trace without that charge or its matching refund. The setting is off by default.
- Implementation:opt-in traceReplay setting for debug trace calls, off by default
- Release:v1.7.8 published 2026-06-24, not marked pre-release
- Activation:no network-wide activation named; applies on nodes that install it and only when a trace call sets traceReplay
Sources: crypto-org-chain/cronos maintainers — Cronos v1.7.8 release notes (external site) · crypto-org-chain/cronos maintainers — Cronos releases (external site)
-
initiad v1.4.8 stopped transactions that panic during pre-checks from crashing nodes
Initia Labs published v1.4.8 on 2026-06-23. Its commit 4441618 wraps the transaction pre-checks (the ante handler) in panic recovery where they run outside the SDK's usual protection: the background mempool cleanup worker and the block proposal handlers. The code comments say a transaction that panicked there, for example one with a fee amount larger than a 64-bit integer, would crash the node; now it is dropped or rejected instead.
- Implementation:one commit (4441618) adding panic recovery around the ante handler
- Release:v1.4.8 published 2026-06-23
- Activation:takes effect per node once installed; installed versions across mainnet not measured
Sources: initia-labs on GitHub — Release v1.4.8 (external site) · initia-labs on GitHub — Commit 4441618: wrap full ante with recover() (external site) · initia-labs on GitHub — initia releases feed (external site) · initia-labs on GitHub — initia releases (external site)
-
Fantom Opera's shutdown postponed to at least the end of 2026
Sonic Labs' April 7, 2026 notice scheduled Opera's retirement and closure of the Opera FTM-to-S bridge for June 30. Its June 23 follow-up superseded that plan, committing to keep Opera operating and the bridge funded through at least the end of 2026. The June 19 leadership announcement names Matt Visser as chief executive; June 23 is the postponement date, not the original leadership announcement date.
- Implementation:retirement postponed
- Release:Announced
- Activation:Opera to stay live until at least the end of 2026, per Sonic Labs
Sources: Sonic Labs blog — The First 1% (external site) · Sonic Labs blog — Sonic's Successful Network Migration: What This Means for Fantom Opera (external site) · Sonic Labs blog — Leadership update from Sonic Labs (external site)
-
Neutron entered long-term maintenance mode
Governance proposal 1, submitted 22 June and passed 29 June 2026, said Neutron was entering long-term maintenance. It cut the active validator set from 18 to 13, retuned minting for a block interval of about 7 seconds instead of 1, and lowered the minimum deposit ratio for proposals. Hadron Labs' engagement ended on 30 June; on the same day the Neutron account said foundation-supported front ends were deprecated and published a command-line withdrawal guide.
- Proposal:proposal 1 passed 2026-06-29
- Implementation:parameter changes executed on passage
- Release:not a software release
- Activation:maintenance mode from 2026-07-01
Sources: Neutron on-chain governance (via Solva REST endpoint) — Governance proposal 1: Governance, staking and mint parameters updates + Fund community pool (external site) · Neutron on X — Full Guide: Using CLI to Withdraw Funds From Neutron Applications (X syndication record) (external site) · Neutron contributors — Neutron v11.0.0 release (external site) · Solva — Proposal: Neutron Long-Term Security Maintenance Mandate and 12-Month Funding (external site)
-
Dash Core 23.1.5 corrects a wrong mainnet checkpoint shipped in 23.1.4
Dash Core 23.1.5 came out one day after 23.1.4 to fix a single mistake: the built-in mainnet checkpoint for block 2,487,500. A checkpoint is a block hash written into the node software that the node expects to find at a given height. According to the fix, 23.1.4 had stored the chain's minimum-work figure in that slot instead of the block's hash. The release notes list no other functional change and describe the upgrade as optional for all nodes, although recommended.
- Implementation:fix merged 2026-06-19 (dash#7368) and shipped in Dash Core 23.1.5
- Release:stable patch release published 2026-06-20; later superseded by 23.1.7 and 23.1.8
- Activation:no network activation; takes effect on each node as it upgrades
Sources: Dash Core developers (dashpay) — Dash Core v23.1.5 release (external site) · Dash Core developers (dashpay) — Dash Core v23.1.5 release notes (external site) · Dash Core developers (dashpay) — fix: correct v23.1.4 checkpoint hash (dash#7368) (external site) · Dash Core developers (dashpay) — Dash Core releases (Atom feed) (external site)
-
Core team reported the June 10 Axelar bridge contract exploit
SCRT Labs reported that on 10 June 2026 an attacker exploited the Secret-side contract for the Axelar bridge, minting roughly 4.67 million US dollars of unbacked bridged tokens from a counterfeit chain and redeeming them for real reserves on the Axelar side. Bridging through Axelar was disabled and the connection paused.
- Implementation:bridge route disabled and connection paused
- Release:incident report published
- Activation:remediation not verified as delivered by 4 October 2026
-
Beryl is live on Base Mainnet
Beryl was announced on June 18, 2026, and current Base upgrade documentation marks it live on Mainnet on June 25, 2026. The upgrade introduced B20 precompile-based tokens, reduced the single-proof withdrawal finalization window from seven days to five, and shipped Reth V2; the Base v1.1.1 GitHub release instructs node operators to upgrade before the June 25 activation.
- Type:Upgrade
- Proposal:Specified
- Release:required-node-release-v1.1.1
- Activation:Mainnet live observed in current docs
Sources: Base — Beryl Overview (external site) · Base Engineering Team — Introducing Base Beryl (external site) · Base contributors — Base v1.1.1 (external site)
-
Node patch 9.0.3 corrects trace call data and adds default eth_getLogs limits
Rootstock published version 9.0.3 of its node software, RSKj, as an optional patch in the Vetiver line. It fixes incorrect call data reported for internal calls by the trace_transaction and trace_block methods, corrects the commit hash recorded in Docker images and sets default limits on the eth_getLogs method. Rootstock says nodes that rely on the tracing methods should update.
- Implementation:released as RSKj 9.0.3
- Release:optional patch release; update advised for nodes using the tracing methods
- Activation:no network activation; changes apply when an operator installs the release
Sources: Rootstock — Vetiver 9.0.3: Patch Release (external site) · Rootstock (GitHub) — RSK Vetiver Release 9.0.3 (external site) · Rootstock (GitHub) — rskj releases (external site)
-
go-flare v1.14.0 (Granite upgrade) schedules a 500 gwei fee floor and a 300M FLR validator cap
The Flare Foundation released go-flare v1.14.0, which moves the node to AvalancheGo v1.14.0 (the Granite upgrade) and schedules its changes for Coston on 11 June, Coston2 on 16 June, Songbird on 7 July and Flare Mainnet on 14 July 2026, each at 12:00 UTC. On Flare it raises the minimum C-chain base fee to 500 gwei, raises the maximum validator stake from 200M to 300M FLR, and sets a 20% minimum delegation fee for validators, previously 0%.
- Proposal:implements parts of FIP.16, accepted on 24 April 2026
- Implementation:shipped in go-flare v1.14.0
- Release:released 17 June 2026; a v1.14.2 release candidate in July schedules no new fork times
- Activation:Scheduled for Flare Mainnet on 14 July 2026 at 12:00 UTC. This review did not obtain an independent chain-state observation of the fee floor or stake limit.
Sources: Flare Foundation (GitHub) — go-flare v1.14.0 (external site) · Flare Foundation (GitHub) — Release Notes: Flare and Songbird networks (external site) · Flare Developer Hub — Register as Validator (external site) · Flare Governance Proposals — FIP.16: Restructure FLR Tokenomics for Long-Term Network Sustainability (external site)
-
Move-based account authentication was enabled on IOTA mainnet
Node release v1.25.0 (protocol version 28) enabled Move-based account authentication on mainnet, so an account's authorization can be decided by a Move function instead of a single key. The Foundation's Q2 2026 update described account abstraction as live on mainnet. IOTA's documentation pages still label the feature a testnet and devnet release candidate.
- Proposal:specified in improvement proposal IIP-0009
- Implementation:implemented in node releases during 2026
- Release:mainnet release v1.25.0 published 2026-06-17
- Activation:Mainnet sender authentication confirmed by the Foundation's Q2 report; wallet adoption and recovery modules not established.
Sources: iotaledger/iota releases — [Mainnet] v1.25.0 (external site) · iotaledger/iota releases — [Mainnet] v1.32.1 (external site) · IOTA Foundation blog — IOTA & TWIN Progress Update: Q2 2026 (external site) · IOTA Documentation — Account Abstraction (external site) · IOTA Foundation blog — IOTA Q1 2026 Progress Update (external site)
-
Telos released TelosZero Core 1.2.2, its own node software line
Telos announced TelosZero Core 1.2.2, the first node software release maintained by Telos itself, based on Antelope Spring 1.2.2 with selected later fixes, Telos genesis materials and a checksummed Ubuntu package. Telos described it as the first step of Project Lightspeed and said future Telos-specific protocol work, including work toward quantum-safe infrastructure, will be reviewed on its main branch.
- Implementation:released as teloszero-v1.2.2
- Release:production release on the release/1.2-teloszero branch
- Activation:no activation height; took effect as operators upgraded
Sources: Telos blog — Telos Releases TelosZero Core (external site) · Telos Network (GitHub) — TelosZero Core 1.2.2 release (external site) · Telos Docs — Exchange Guide: Updating Your Telos Zero Node Software to the Latest Release (external site)
-
Grin node 5.5.0 fixes parallel sync peer handling
Grin v5.5.0 lists a fix to how the node picks and blocks peers during parallel state sync, and to terminal-interface startup and shutdown. The commit comparison also shows the node's database binding moving to a new library, IPv6 as the default listen address and validation of sync segment indices.
- Implementation:shipped in v5.5.0
- Release:stable release published 2026-06-16
- Activation:no consensus change; takes effect as nodes upgrade
Sources: GitHub API (mimblewimble/grin) — Grin v5.5.0 release record (external site) · GitHub API (mimblewimble/grin) — Grin commits between v5.4.1 and v5.5.0 (external site)
-
Chia Network announced the Permuto Volatility Cup
Ecosystem-project announcement, not a consensus change: Chia Network reported that Permuto launched its statistical-volatility perpetuals production platform on Chia. The announcement does not independently verify continued service availability, eligibility, market claims or project safety.
- Claim:Reported
Source: Chia Network Inc. — Welcome to the Permuto Volatility Cup (external site)
-
Runtime 4401 release documented; exact Moonbeam activation not reverified
Moonbeam released runtime 4401 with an EVM per-transaction gas cap of 35 million, consumption of a CallPermit nonce even after a failed subcall, EVM gas charging for P256 signature verification, and a per-block transaction limit. The release lists builds for Moonbase Alpha, Moonriver and Moonbeam. The exact Moonbeam authorization vote and activation block were not reverified.
- Proposal:The earlier referendum 155 claim could not be reverified because the forum and explorer no longer exposed the evidence.
- Implementation:Release contains runtime builds for Moonbase Alpha, Moonriver and Moonbeam.
- Release:Runtime 4401 and node v0.52.3 release pages display June 15; the runtime index still lists 4401 as latest.
- Activation:Exact Moonbeam activation date, block and final-runtime status were not reverified.
Sources: Moonbeam Foundation (GitHub) — Runtime runtime-4401 (external site) · Moonbeam Foundation (GitHub) — Moonbeam v0.52.3 (external site) · Moonbeam Foundation (GitHub) — Moonbeam releases (external site)
-
DashPay wallet added cross-chain swaps through Maya Protocol
dash.org announced that the DashPay wallet can swap DASH to other assets such as Bitcoin, Ethereum and stablecoins through Maya Protocol, a THORChain fork; Dash says DASH was the first new chain Maya added after its 2023 launch. iOS support was stated as coming. DeFiLlama's hacks list records a Maya Protocol loss of about US$1.7 million on 18 August 2026, after which Maya halted its network; on 4 October 2026 its node API showed no halt flags and the DASH pool available.
- Implementation:integrated in the DashPay Android wallet
- Release:announced live on Android; iOS stated as coming
- Activation:Maya's network was halted after an exploit on 18 August 2026; its node API showed no halt flags on 4 October 2026
Sources: Dash (dash.org) — DashPay Maya Swaps Now Live (external site) · Maya Protocol — MAYAChain node API: pools (external site) · Maya Protocol — MAYAChain node API: mimir settings (external site) · DeFiLlama — DeFiLlama hacks API (external site) · crypto.news — Maya Protocol suffers $1.7 million exploit, halts network (external site)
-
Ravencoin Core 4.7.0 patched an asset transfer overflow bug behind miner signalling
Version 4.7.0 added checks that reject out-of-range asset amounts, closing a bug that the release notes say let anyone holding one unit of an asset create an amount near 2^64. Enforcement needs about 70% of miners to signal readiness; the 4.8.0 notes say that vote had not completed before 4.8.0 was needed. The source was published in August as pull request 1287.
- Implementation:fix published as pull request 1287 on 10 August 2026
- Release:binaries 13 June 2026; GitHub release 14 June 2026; carried into 4.8.0
- Activation:miner signalling window opened 12 June 2026; activation inferred around 14 August 2026, not confirmed
Sources: RavenProject — Ravencoin v4.7.0: Patch the asset transfer qty overflow bug (external site) · RavenProject — V4.8.0 Core Release: Patch 2 major bugs (external site) · RavenProject — Fix the asset transfer qty overflow bug (pull request 1287) (external site) · RavenProject — Ravencoin Core consensus/tx_verify.cpp: asset input and output checks (external site) · blockbook.ravencoin.org — Blockbook: Ravencoin block 4,489,632 (external site) · blockbook.ravencoin.org — Blockbook: Ravencoin block 4,493,664 (external site)
-
Neo-CLI v3.10.0 added wallet, RPC and Docker changes without a hard fork
Neo released Neo-CLI v3.10.0 as an optional upgrade for TestNet and MainNet. It activates no hard fork, stays compatible with the current network and needs no resync. Neo's notice lists BIP-39 mnemonic import and export for wallets, a separate Expired result in transaction validation, rejection of duplicate Conflicts attributes, a DeferredRelay plugin that relays transactions automatically, wallet RPC methods and CLI commands named sign, relay, signmsg and verifymsg, an official Docker image and fuller RPC diagnostics. It also lists the NeoVM SHL/SHR fix, jump-table refactor and cryptographic verification update, saying the release prepares for the Gorgon hard fork without activating it; the July v3.10.1 notice names these as Gorgon's changes.
- Implementation:released in Neo-CLI v3.10.0 and core library v3.10.0
- Release:released June 2026 as an optional upgrade
- Activation:no hard fork; takes effect when a node installs it. Neo planned MainNet deployment for 26 June 2026, which was not confirmed in this review
Sources: Neo — Neo-CLI v3.10.0 TestNet and MainNet Upgrade Notice (external site) · neo-project/neo-node maintainers — Neo CLI v3.10.0 (external site) · neo-project/neo maintainers — neo v3.10.0 release (external site) · Neo — Neo-CLI v3.10.1 TestNet and MainNet Upgrade Notice (external site)
-
Grin node 5.4.1 fixes parallel sync and peer handling
Grin v5.4.1 is a point release of the reference node published without notes. Its seven commits fix a loop that could leave parallel state sync stuck while requesting kernel segments, cap how many items the node will allocate when decoding sync segments from peers, stop treating newly learned peers as healthy before they are checked and mark peers that fail pings as defunct, and refresh the list of seed nodes a new node contacts first.
- Implementation:shipped in v5.4.1
- Release:stable release published 2026-06-11
- Activation:no consensus change; takes effect as nodes upgrade
Sources: Grin developers (mimblewimble/grin) — Grin v5.4.1 (external site) · GitHub API (mimblewimble/grin) — Grin commits between v5.4.0 and v5.4.1 (external site) · GitHub API (mimblewimble/grin) — PIBD sync stuck fixes (pull request 3822) (external site) · GitHub API (mimblewimble/grin) — More reliable peers check (pull request 3824) (external site) · GitHub API (mimblewimble/grin) — PIBD: bound segment decoding allocations (pull request 3850) (external site)
-
Bitcoin Cash Node moved its funding multisig and replaced an unreachable signer
Bitcoin Cash Node said it moved its development fund (about 2,048 BCH) to a new 3-of-5 multisig on 27 May 2026, replacing one co-signer: its founding lead maintainer, freetrader, whom the project said nobody had been able to contact since May 2024.
- Implementation:funds moved to the new multisig on 2026-05-27 per the notice
- Release:announced 2026-06-10
- Activation:not a protocol activation
-
Client 2.8.1 scheduled the Cancun, Prague and Pascal upgrades for 30 June 2026
Chiliz released v2.8.1, setting mainnet activation for Cancun at 11:00 CEST on 30 June 2026 and Prague/Pascal at 11:30 CEST. The changelog identifies blob transactions, transient storage and EIP-7702 account delegation. Current developer documentation targets Prague with Solidity up to 0.8.30. The preceding v2.8.0-rc1 release scheduled these upgrades on Spicy for 18 May 2026.
- Implementation:v2.8.0-rc1 scheduled the upgrades on Spicy for 18 May 2026; v2.8.1 includes the mainnet upgrades scheduled for 30 June 2026
- Release:v2.8.1 published 2026-06-10
- Activation:mainnet timestamps set for 2026-06-30; current docs target Prague; independent live-node activation check not performed
Sources: Chiliz (GitHub) — Chiliz Chain client v2.8.1 release notes (external site) · Chiliz Chain Docs — Blockchain code changes (external site) · Chiliz Chain Docs — Differences from Ethereum (external site) · Chiliz Chain Docs — Developers FAQ (external site) · Ethereum Improvement Proposals — EIP-7702: Set Code for EOAs (external site) · Chiliz (GitHub) — chiliz-chain/v2 releases (external site)