News
Follow what has changed.
Reviewed news adds a checked explanation of a development and the stage the evidence supports. Automatic headlines are for discovery and are labelled as not yet reviewed. Publication dates and review dates are shown separately, and older items stay as history.
Reviewed news
894 reviewed developments across 151 chains. Each record retains its own review date. A missing review date stays unknown; a check or collection date never replaces it.
A weekly reviewed news run is planned and not yet running, so many chains will show Review overdue until it starts. The items stay available as history.
Sorted by publication date · newest first; equal dates follow the alphabetical chain order. Page 8 of 18.
One chain's developments, A to Z
-
stellar-core v28.0.1 released with three stability fixes
stellar-core v28.0.1, a patch to the Protocol 28 node software, was published on GitHub on 1 September 2026, ahead of the 16 September Mainnet vote. Its release notes list three stability changes: repeated query messages between peers are deduplicated, transactions arriving from peers that have not finished authenticating no longer get background signature checks, and the functions that add up a transaction set's fees now cap their totals so the sums cannot overflow. The notes describe no protocol change and no network vote.
- Implementation:three stability fixes in stellar-core; no protocol change listed
- Release:stable release published 1 September 2026; superseded by v29.0.0, shown as Latest on the release list at this check
- Activation:takes effect on each node when its operator installs it; no network vote involved
Sources: Stellar Development Foundation (GitHub) — stellar-core v28.0.1 (external site) · Stellar Development Foundation (GitHub) — Clamp additions in tx set fee summing functions (external site) · Stellar Development Foundation (GitHub) — stellar-core releases (external site)
-
Security Council disclosed five 2026 instant upgrades that patched ZKsync Era
The ZKsync Security Council published a notice listing five instant upgrades for ZKsync Era, signed between 23 January and 15 August 2026. They were circuit patches that fixed reported vulnerabilities (one a soundness issue), an over-constraint that could have blocked proofs for valid batches, miscomputation in some EraVM operations and a cryptographic weakness in the proof system. The notice said user funds were not believed to be actively at risk and there was no evidence of active exploitation when each upgrade was approved.
- Implementation:five circuit patch versions applied (v0.29.3 to v0.30.1)
- Release:disclosed after deployment
- Activation:applied to Era mainnet; the notice lists signing dates rather than execution times
Source: ZK Nation Forum — Notice of 2026 Instant Upgrades: Security Patches (external site)
-
go-algorand 5.0.1 tightened State Proof verification without a protocol upgrade
The maintainers published go-algorand 5.0.1 as a stable node release. The notes say it improves node safety and the verification and performance of State Proofs, and the one changelog entry makes nodes reject State Proof data that uses a mismatched hash type. The notes state that the release contains no protocol upgrade.
- Implementation:one State Proof verification change listed in the 5.0.1 changelog
- Release:5.0.1 stable released 2026-08-31; superseded by 5.0.2 on 2026-09-15
- Activation:no network activation: the notes say there is no protocol upgrade; changes apply only on nodes that install it, and how many have was not verified
Sources: algorand/go-algorand maintainers — Algorand 5.0.1 release notes (external site) · algorand/go-algorand maintainers — algorand/go-algorand releases (external site)
-
Astrovault, the exchange featured on Archway's homepage, says it has closed
Astrovault's homepage carries a one-line notice that it closed on 31 August 2026. Astrovault is the exchange Archway's own homepage features, and its AXV token appears in Archway's asset list. No fuller closure announcement was found.
- Implementation:closure stated on the project's homepage
- Release:no software release involved
- Activation:closed as of 31 August 2026 per the notice; contract state not checked
Sources: Astrovault — Astrovault homepage (closure notice) (external site) · Archway — Archway homepage (external site) · Cosmos chain-registry maintainers — Archway asset list (external site)
-
Binance confirms BounceBit Chain retirement and mainnet support withdrawal
Binance says BounceBit decided to permanently sunset its chain following a hacking incident. It confirms mainnet deposits and withdrawals were suspended on 20 August at 02:00 UTC and announces a 1:1 BB migration to BNB Smart Chain. The exchange suspension time does not establish the exact last block or chain halt time.
- Implementation:mainnet exchange support discontinued; permanent chain retirement confirmed in Binance notice
- Release:Binance notice published 31 August 2026, updated 1 September
- Activation:retired chain; precise halt time and final height unverified
Source: Binance — Binance Will Discontinue Mainnet Support of BounceBit (BB) (external site)
-
Mainnet block production paused for a security review, then resumed with v3.1.5
On 31 August 2026 Ontology suspended mainnet block production after its daily security check found a potential concern. On 1 September it said it had found malicious attack activity that did not involve user assets and would upgrade the network. On 2 September it announced that the mainnet had resumed and told sync nodes to upgrade to v3.1.5.
- Implementation:security remediation and network upgrade completed, per Ontology
- Release:ontology v3.1.5 released 2 September 2026
- Activation:Ontology announced restored mainnet operation on 2 September 2026; current block production was not independently observed in this check.
Sources: Ontology News — Ontology Mainnet Emergency Pause for Comprehensive Security Review (external site) · Ontology News — Ontology Mainnet Pause: Security Update and Network Upgrade (external site) · Ontology News — Ontology Mainnet Has Resumed: Sync Nodes Required to Upgrade to v3.1.5 (external site) · Ontology (GitHub) — ontology v3.1.5 release (external site)
-
Symbol SDK 3.3.3 fixes fee calculation for transactions with cosignatures
The JavaScript and Python SDK 3.3.3 releases fix the Symbol transaction fee calculator added in 3.3.2 in June 2026, which had not multiplied the size of cosignatures by the fee multiplier. The Python release also adds functions that build a transaction or embedded transaction from a raw descriptor. The 3.3.1 releases in April 2026 added TypeScript 6 and Python 3.14 support and JSON output for multisig workflows, and the 3.3.2 releases in June 2026 added the fee-calculation helpers.
- Implementation:released in the JavaScript and Python SDKs 3.3.3
- Release:published on GitHub 2026-08-31
- Activation:takes effect when an application upgrades; no network activation
Sources: Symbol (GitHub) — Symbol Javascript SDK 3.3.3 release notes (external site) · Symbol (GitHub) — Symbol Python SDK 3.3.3 release notes (external site) · Symbol (GitHub) — symbol/symbol releases (external site) · Symbol (GitHub) — Symbol Javascript SDK 3.3.2 release notes (external site)
-
Migration-contract replay exploit led the Foundation to halt ICON for about 25 hours
The Foundation's 30 August post-mortem reports a 27 August replay flaw in migration withdrawals, release of Foundation-held ICX and bnUSD, and a roughly 25-hour chain halt. It describes a serial-number fix and restricted relayer admission, reports no user deposits affected, and says bnUSD was recovered while ICX recovery involved exchanges. These are the publisher's findings; this check did not independently reproduce them.
- Implementation:serialization fix and relayer allowlist deployed during the restart
- Release:post-mortem published
- Activation:The Foundation reports restart at about 07:51 UTC on 28 August 2026; its publication does not establish today's withdrawal or recovery status.
Source: ICON Foundation — ICON Network: Replay Exploit Post-Mortem (external site)
-
Oasis disclosed a simulation attack on upgradeable confidential contracts
An Oasis engineer described how someone holding upgrade rights over a confidential Sapphire contract could recover a stored private key bit by bit by simulating upgrades, because simulated calls never reach the chain. Oasis says it found the issue internally and held its deployments until it was remediated. The fix, a two-step upgrade that cannot complete within one block, shipped in version 0.2.18 of the sapphire-contracts library, and the post says the Privana services that prompted the work now run on it.
- Implementation:mitigation pattern released in a library
- Release:sapphire-contracts 0.2.18
- Activation:applies only to contracts that adopt the pattern
Sources: Oasis blog — Accessing a Vault Key With Simulated Upgrades (external site) · Oasis documentation — Sapphire Contracts Library (external site)
-
sei-chain v6.6.3 fixed validator snapshot problems and added a freeze mode for historical EVM RPC
The v6.6.3 patch release, published on 28 August 2026, is recommended for validators, full-node operators and RPC operators. For validators it fixes a memory leak in memiavl snapshot writes, closes a race that could publish a truncated snapshot file, and checks snapshots before they are made current. For RPC operators it adds a freeze mode that holds a node at an upgrade boundary while it keeps serving historical EVM state, plus a router that sends each block-specific request to the matching frozen node. The notes say it contains no state-machine or consensus-breaking changes.
- Implementation:Released
- Release:v6.6.3 published 28 August 2026 as a recommended patch release
- Activation:no network activation; changes apply on each node that installs the release
Sources: Sei Protocol contributors — sei-chain v6.6.3 release notes (external site) · Sei Protocol contributors — sei-chain releases (external site) · Sei Protocol contributors — Release notes from sei-chain (Atom feed) (external site)
-
IOG reported Leios Earth-phase public-testnet results
IOG reported that the 41-day Earth phase of the MusashiNet public testnet peaked at 26.8 kB of transaction data per second with Leios active, about six times the 4.51 kB/s ceiling it gives for Cardano mainnet at current parameters, while also documenting bugs, forks, crashes, fixes, and remaining prototype work.
- Proposal:CIP-164 design and ongoing engineering
- Implementation:public prototype testnet Earth phase completed; Water phase continuing
- Release:testnet engineering report
- Activation:not activated on Cardano mainnet
Source: Input Output — Leios hits 6x Cardano's throughput on its first testnet (external site)
-
Hard fork at block 1,371,000 restores multi-input Spark spends
Firo v0.14.18.0 introduced a new versioned Spark spend format with the permanent fix, activating by hard fork at block 1,371,000. Everyone running a node had to upgrade. Block 1,371,000 was mined on 4 September 2026 and marked ChainLocked. On 6 September Electrum-Firo released a fix because the light wallet did not recognise the new spend type and could not keep syncing.
- Implementation:shipped in v0.14.18.0
- Release:v0.14.18.0 released 2026-08-27; v0.14.18.1 followed on 2026-09-26
- Activation:fork height passed on 2026-09-04; the explorer node runs 0.14.18.1
Sources: Firo — Firo v0.14.18.0 released: Spark functionality to be fully restored (external site) · Firo developers (firoorg) — Firo releases (external site) · Firo — Firo Insight API: block 1,371,000 (external site) · Firo — Firo Insight API status (external site) · Firo developers (firoorg) — Electrum-Firo releases (external site) · Firo — Firo blog (external site)
-
Polygon disclosed denial-of-service fixes shipped in the Austin and Kyoto hardforks
Polygon disclosed vulnerabilities fixed by two mandatory hardforks. Austin (Bor v2.10.0, mainnet block 91,949,700) capped gas used by bridge state-sync events and removed an unbounded network field that could crash peers. Kyoto (Heimdall v0.11.0, mainnet height 51,533,000) added eight consensus-hardening fixes; the most severe let one cheap transaction force costly decoding on every validator.
- Implementation:fixed in Bor v2.10.0 and Heimdall v0.11.0
- Release:mandatory releases published
- Activation:active on mainnet per the disclosure
Sources: Polygon Community Forum — Security releases review: Bor v2.10.0 (Austin HF) and Heimdall v0.11.0 (Kyoto HF) (external site) · Polygon Community Forum — Bor v2.10.0 release (external site) · Polygon Labs (GitHub) — Bor v2.10.0 - Austin hardfork (external site) · Polygon Community Forum — Heimdall v0.11.0 (external site)
-
Node 1.6.4 released a proposed 20 WAVES reward distribution
Node 1.6.4 introduced feature 26: activation sets the total reward to 20 WAVES, split 10 to the DAO, 8 to the producer and 2 to XTN buy-back. If feature 21 has ended buy-back, the split becomes 10 to the DAO and 10 to the producer. The release requested producer voting. It was not activated before the boost ended at height 5,410,000 on 20 September 2026, the reward returned to 6 WAVES, and on 11 October 2026 the feature was still in voting.
- Proposal:proposed in node 1.6.4
- Implementation:implemented in node 1.6.4
- Release:node 1.6.4 released 2026-08-27
- Activation:not activated: still in producer voting at height 5,440,606 on 2026-10-11, with 358 supporting blocks in the current window; it missed the height 5,400,000 target
Sources: wavesplatform on GitHub — Waves node v1.6.4 release notes (external site) · Waves documentation (docs.waves.tech) — Features (external site) · Waves documentation (docs.waves.tech) — Community-Driven Monetary Policy (external site) · Waves public node pool (nodes.wavesnodes.com) — Waves mainnet feature activation status (node REST API) (external site) · Waves public node pool (nodes.wavesnodes.com) — Waves mainnet block reward status (node REST API) (external site) · Waves public node pool (nodes.wavesnodes.com) — Waves mainnet block 5,410,000 header (node REST API) (external site)
-
Release v9.6.4 fixed a flaw where an order with a bad builder address could halt the chain
protocol/v9.6.4 carries the fixes for security issue SEC-76. Nodes now reject orders whose builder address (the address an order names to receive a builder fee) is invalid or belongs to a blocked module account, and they skip any such stored order when loading orders into the order book. The pull request says these orders could otherwise cause a crash during fee transfer, and its end-to-end test treats the case as a chain halt. The release also makes two permissioned-key filters, which limit a key to chosen markets or subaccounts, refuse message types they do not recognise instead of letting them through.
- Proposal:no governance proposal named in the release or pull request
- Implementation:SEC-76 fixes merged 20 August 2026 (pull request 3380)
- Release:released as protocol/v9.6.4 on 26 August 2026
- Activation:rollout method and timing not stated; the v9.7 upgrade names v9.6.4 as its starting version (inference that validators ran it)
Sources: dydxprotocol maintainers — protocol/v9.6.4 release notes (external site) · dydxprotocol maintainers — Pull request 3380: Port SEC-76 fixes to main (external site) · dydxprotocol maintainers — Pull request 3389: Backport v9.7 changes to release/protocol/v9.x (external site)
-
Research Lab discussed FCMP++ and wallet dependencies
The log of the 19 August 2026 Research Lab meeting, posted on 26 August, recorded ongoing FCMP++ and Carrot work, a request for quotes for an FCMP++ audit, and a plan to include hot/cold wallet changes in version 3 of the FCMP++ beta stressnet. Meeting discussion establishes current technical work, not merged code, release readiness or activation.
- Stage:Research
- Activation:Not activated
Source: Monero Research Lab participants — Monero Research Lab meeting, 19 August 2026 (external site)
-
opBNB node v0.5.6 and op-geth v0.5.11 fix sync and recovery problems without a hard fork
BNB Chain released opBNB node v0.5.6, which fixes a peer-to-peer sync stall that could leave a restarted node's latest block stuck for minutes, and op-geth v0.5.11, which makes path-based state recovery after an unclean shutdown reliable and keeps withdrawal proofs collected during recovery. Both update the Go toolchain and security-related dependencies.
- Implementation:shipped in opbnb v0.5.6 and op-geth v0.5.11
- Release:optional upgrade
- Activation:no activation; takes effect when each node upgrades
Sources: BNB Chain (GitHub) — opBNB v0.5.6 release notes (external site) · BNB Chain (GitHub) — op-geth v0.5.11 release notes (external site) · BNB Chain (GitHub) — Release for opBNB v0.5.6 (external site) · BNB Chain (GitHub) — Path-based recovery fix (external site)
-
System-chain runtime 2.4.0 enacted: peg stability modules on Polkadot Hub and Bulletin chain storage
Referendum 1937 upgraded Polkadot's system chains to Fellowship runtime 2.4.0, and Referendum 1938 did the same for the Bulletin chain. The release lets Polkadot Hub run several independent peg stability modules for stablecoin issuance, each created by the asset's owner or by Root with a fixed 100 DOT deposit and accepting up to five external assets. It also gives the Bulletin chain the storage logic that lets authorized accounts store data within their allowances, raises the People chain's block weight limit and fixes under-priced XCM weights.
- Proposal:Referenda 1937 (system chains) and 1938 (Bulletin) executed after Fellowship whitelisting
- Implementation:implemented in Fellowship runtimes 2.4.0 (spec version 2004000)
- Release:released 2026-08-26
- Activation:referenda executed; exact activation blocks and timestamps on individual system chains not reverified
Sources: Polkadot Fellowship (GitHub) — Runtimes 2.4.0 (external site) · Polkadot Forum — Runtime release notification for v2.4.0 [28.08.2026] (external site) · Subsquare (Polkadot OpenGov) — Referendum 1937: Upgrade System Chains To 2.4 (external site) · Subsquare (Polkadot OpenGov) — Referendum 1938: Upgrade Bulletin System Chains To 2.4 (external site) · Subsquare (Polkadot OpenGov) — Referendum 1944: dotUSD: A Native Stablecoin for Polkadot (external site)
-
Revolut launched the EURR euro stablecoin on Ethereum and Polygon
Polygon announced that Revolut's EURR, a euro token meant to be redeemable one for one through its regulated issuer under the EU's MiCA rules, launched on Ethereum and Polygon, with a first rollout to customers in Denmark, Poland and Portugal.
- Implementation:announced as launched
- Release:initial customer rollout
- Activation:rollout limited to named countries at announcement
Source: Polygon Labs — Revolut Launches EURR, a Euro-Backed Stablecoin, on Polygon (external site)
-
Theta Labs reported completion of its 30 million THETA treasury unstake
Theta Labs announced on August 26 that it would unstake 30 million of its 60 million THETA treasury, including 15 million staked with Crypto.com, to fund its stated operating and development priorities. The September 1 roundup says the unstake was carried out and repeats a claimed reduction in its share of total staked THETA from about 48% to about 23%; those shares were not independently reconciled.
- Implementation:unstake reported completed in the September 1 roundup
- Release:announced by Theta Labs
- Activation:Theta Labs' September 1 roundup says the unstake was carried out; not independently checked on chain
Sources: Theta Labs blog — Fueling 2026-2027 Growth: Annual Theta Validator Unstake (external site) · Theta Labs blog — Theta Roundup: August 2026 (external site)
-
Zallet published beta.3
Zallet's beta.3 release continued the wallet replacement work after its July beta releases. The project still labels the wallet beta and warns that breaking changes and missing RPC methods remain possible.
- Stage:Release
Sources: Zcash developers — Zallet 0.1.0-beta.3 release (external site) · Zcash developers — Zallet wallet status and security warnings (external site)
-
Encrypted mempool shadow setup recorded; mainnet switch on by 11 October
The Aptos Foundation announced on 12 October 2026 that the encrypted mempool (AIP-144) was live on mainnet, and the aptos.dev pending-transactions guide, updated 13 October, says the feature is live on devnet, testnet and mainnet. Encryption is optional per transaction and covers the payload only; sender, gas settings and signatures stay visible. The post says the validator set generates the encryption key each epoch, block leaders order encrypted transactions without seeing their contents, and validators jointly decrypt them after the block is finalised. It names Petra as a wallet that offers it, and the TypeScript SDK from v7.0.0. Earlier, the governance index recorded shadow key generation on 25 August. The activation block or epoch is not stated in the sources opened.
- Proposal:AIP-144 marked Accepted
- Implementation:shadow setup 2026-08-25 recorded in the governance index
- Release:announced live on mainnet by the Aptos Foundation 2026-10-12; TypeScript SDK support from v7.0.0
- Activation:live on mainnet per the 12 Oct post and the 13 Oct guide; activation block or epoch not stated in the sources opened
Sources: Aptos Foundation (aptosnetwork.com Currents) — Encrypted Mempool, Now on Aptos Mainnet (external site) · Aptos Foundation — Aptos Governance — proposal index (external site) · Aptos Foundation AIPs — AIP-144: Encrypted Mempool (external site) · Aptos Docs — Encrypted Pending Transactions (external site) · Aptos Labs (public mainnet API) — Mainnet REST API: 0x1::features::Features resource (feature-switch bit vector) (external site) · Aptos Labs (public mainnet API) — Mainnet REST API: ledger information (external site)
-
Conflux v3.1.0 hard fork completed on mainnet
The v3.1 network upgrade, which nodes had to adopt before epoch 155,140,000, was reported complete on 25 August 2026. It adds Ethereum Osaka-era features to eSpace (a count-leading-zeros opcode and a secp256r1 signature precompile used by passkeys), bounds the ModExp precompile, requires canonical transaction encoding, fixes stake-dispute evidence checks and cross-space handling of set-code delegation, and includes a security fix whose announcement withheld details until after activation; a later disclosure was not established here.
- Proposal:CIPs 166, 167, 172, 173, 174, 175 and 176 bundled in the release
- Implementation:implemented in conflux-rust v3.1.0
- Release:v3.1.0 published 2026-08-10
- Activation:mainnet upgrade reported complete on 2026-08-25
Sources: Conflux Forum (Conflux team) — Conflux v3.1.0 Network Hardfork Upgrade Completed (Aug 25, 2026) (external site) · Conflux Forum (Conflux team) — Conflux v3.1.0 Network Hardfork Upgrade Announcement (Aug 3, 2026) (external site) · Conflux developers (Conflux-Chain) — conflux-rust v3.1.0 (external site) · Conflux documentation — Hard fork v3.1 (external site)
-
Post-incident report: a launch-era inflation bug was exploited on mainnet
The project's report says a bug in how consensus handled the regular and stake transaction trees together, present since launch, allowed inputs to be double-spent. It was reported through the bug bounty on 12 August 2026, exploited on mainnet between 16 and 17 August, and fixed in dcrd 2.1.6 on 18 August. About 2,078 DCR was created, and exchanges were asked to pause deposits and withdrawals while the chain was watched. Developers chose not to roll back the chain.
- Implementation:fix shipped in dcrd 2.1.6; double-spend watching service built; upgrade-signalling fields planned
- Release:report published 2026-08-25
- Activation:fix in force on upgraded nodes since 2026-08-18; no rollback
Sources: Decred blog — Decred Consensus Vulnerability: Post-Incident Report (external site) · Decred developers — dcrd v2.1.6 release notes (external site)
-
MIP-8 page-based storage (MONAD_TEN) activated on mainnet
Client release v0.16.1 scheduled the MONAD_TEN revision for 2 September 2026 at 14:30 UTC. Current architecture documentation describes MIP-8 page storage: groups of 128 slots share cold/warm access accounting and page commitments. The release instructions require operators to complete the database-layout transition; they do not establish that every node did so.
- Proposal:MIP-8 is listed as Final in the MIP index
- Implementation:shipped in v0.16.0 (testnet) and v0.16.1 (mainnet activation)
- Release:v0.16.1 published 25 August 2026
- Activation:activated on mainnet 2 September 2026 at 14:30 UTC
Sources: Category Labs (GitHub) — monad-bft v0.16.1 (MONAD_TEN mainnet activation) (external site) · Monad Documentation (Monad Foundation) — Releases (external site) · Monad Improvement Proposals (monad-crypto/MIPs) — Monad Improvement Proposals (external site) · Monad Documentation (Monad Foundation) — MonadDb (external site)
-
Theta Edge Node left beta
Theta Labs announced that Edge Node, the software that lets a computer relay and cache video, transcode video and render 3D jobs for TFUEL, is now fully released rather than beta. AI workloads run through a separate EdgeCloud client, not Edge Node.
- Implementation:Released
- Release:full release announced
- Activation:available per Theta Labs; not tested in this review
Sources: Theta Labs blog — Theta Edge Node Enters Full Release (external site) · Theta Labs blog — Theta Roundup: August 2026 (external site)
-
Glamsterdam gas-repricing impact guidance identified contracts and tooling to retest
The Foundation reported that scheduled state-creation and state-access repricings could affect a small set of contracts and warned wallets, RPC infrastructure and node tooling to update gas-estimation assumptions. Testing guidance on Platåberget is not Mainnet activation.
- Type:Upgrade
- Proposal:Scheduled for inclusion
- Release:Testnet tooling guidance
- Activation:Testnet only not mainnet
Sources: Ethereum Foundation — Glamsterdam Repricing Impact for Smart Contract Developers (external site) · Ethereum Foundation — Announcing the Platåberget Testnet (external site) · Ethereum Improvement Proposals — EIP-7773: Hardfork Meta - Glamsterdam (external site)
-
Linea Besu v2.2.0 node package released on Besu 26.8.0
The Lineth project published version 2.2.0 of the Linea Besu package, the Besu execution client bundled with Linea's sequencer, tracer, state-recovery and Shomei plugins. The release adds support for custom liveness signers in Linea Besu, updates the bundled Besu client to 26.8.0, and tidies logging and image builds. It is a client release for node operators, not a network upgrade, and it was followed a month later by v2.3.0.
- Implementation:Custom liveness signer support and a Besu 26.8.0 update in the Linea Besu package
- Release:Linea Besu package v2.2.0 published on GitHub 24 August 2026, not marked pre-release; superseded by v2.3.0
- Activation:Not tied to a network activation; applies to a node when its operator installs it
Sources: Lineth (GitHub) — Linea Besu v2.2.0 (external site) · Lineth (GitHub) — lineth-monorepo releases (external site)
-
MANTRA's incident log confirms the patched August mainnet restart
The official incident log confirms a coordinated restart on 22 August using v8.4.0 after a Cosmos-EVM vulnerability. It records no rollback. The detailed loss and later fund-recovery account remain unresolved.
- Implementation:patched Cosmos-EVM dependency and upgrade handler in v8.4.0
- Release:released 21 August 2026
- Activation:mainnet resumed 22 August; incident marked resolved 24 August; fund recovery unresolved
Sources: MANTRA Chain Status — Security vulnerability in Cosmos-EVM module (incident log) (external site) · MANTRA-Chain/mantrachain on GitHub — MANTRA Chain v8.4.0 release notes (external site)
-
v3.20 resumed churn and switched on protocol-owned liquidity controls
The August 24 v3.20 announcement describes churn, protocol-owned liquidity controls, an experimental Stable Reserve disabled by default, and chain-client work. The September 3 recap reports churn and the 20% liquidity allocation operational. Later sources announce completed Zcash integration while Monero remains before mainnet.
- Implementation:v3.20 announcement describes protocol and chain-client changes
- Release:upgrade announcement published August 24, 2026; exact tag date not reproduced
- Activation:September 3 recap reports churn and POL live; Stable Reserve's current setting unverified; October 7 announcement says Zcash integration complete; October 8 recap keeps Monero before mainnet
Sources: THORChain blog — THORChain Protocol Upgrade v3.20 (external site) · THORChain blog (Raynalytics podcast recap) — THORChain Churns Again: POL Goes Live, Rujira Resumes and BLO Debate (external site) · THORChain blog — How THORChain's New System Income Distribution Works (external site) · THORChain — Bringing Native Zcash to THORChain (external site) · THORChain / Raynalytics — Chad's Unchained Podcast Debrief, Rev-Share and Monero (external site)
-
Gaia v28.0.0 released
Gaia v28.0.0 removed the Interchain Security provider module and included an upgrade-handler parameter migration. The release alone did not activate it: Hub governance approved the upgrade in proposal 1052 (voting ended 1 Sep 2026), and the plan was applied at height 32,785,900 on 2 Sep 2026.
- Release:Released
- Activation:activated on mainnet at height 32,785,900 (2 Sep 2026) after proposal 1052 passed; proposal 1055 later moved the Hub to v28.2.0
Sources: cosmos/gaia maintainers — Gaia v28.0.0 release notes (external site) · Cosmos Hub Unit — Advance notice: Gaia v28.0.0 ICS provider module removal (external site) · Cosmos Hub on-chain state via PublicNode REST endpoint — Cosmos Hub governance proposal 1052: Gaia v28.0.0 Upgrade (on-chain record) (external site) · Cosmos Hub on-chain state via PublicNode REST endpoint — Cosmos Hub applied upgrade plan v28.0.0 (on-chain query) (external site) · Cosmos Hub on-chain state via PublicNode REST endpoint — Cosmos Hub block 32,785,900 (on-chain query) (external site)
-
Mesa pre-fork releases gave mainnet node operators a manual and an automatic upgrade path
On 21 August 2026 o1Labs published two mainnet node releases for the Mesa hard fork, with a blog post listing operators' tasks. Operators had to install one of them before the stop-transaction slot at 10:00 UTC on 3 September. Version 3.5.0-mainnet-stop-slot is the manual path: from that slot upgraded nodes produce only empty blocks, block production halts at 15:00 UTC, and the operator then installs the separate Mesa release and restarts. Version 4.0.0-mainnet (automode) is the automatic path: it carries the Mesa software and switches the node over by itself at the halt. The Mesa network was scheduled to start at 18:00 UTC the same day. Devnet had gone through the same sequence on 19 August.
- Proposal:MIP6 to MIP9 approved in the December 2025 on-chain vote
- Implementation:Mesa implemented in daemon 4.0.0; 3.5.0 is the pre-fork build that sets the stop slots for the manual path
- Release:3.5.0-mainnet-stop-slot and 4.0.0-mainnet published 2026-08-21; the manual-path Mesa release 4.0.0-mainnet-mesa followed on 2026-09-03
- Activation:not an activation; Mesa went live on mainnet on 2026-09-03, recorded separately in mesa-hard-fork-mainnet-2026-09
Sources: MinaProtocol/mina maintainers (o1Labs) — Mina Mainnet 3.5.0 Stop Slot Release (external site) · MinaProtocol/mina maintainers (o1Labs) — Mina Mainnet 4.0.0 Automode Upgrade Release (external site) · Mina Protocol blog — Mesa MAINNET Upgrade: Timelines and Operators' Tasks (external site) · Mina documentation — Mesa Fork Schedule (external site)
-
ArbOS 61 Elara activated on Arbitrum One
Official documentation records governance approval (on-chain vote 16 to 30 July 2026) and activation on Arbitrum One and Nova at 17:00 UTC, with Offchain Labs allowed to adjust the minimum L2 base fee between 0.01 and 0.10 gwei for two years and the Stylus contract-size limit raised to 96 KB. Priority-fee collection, compliance filtering and AltDA were not enabled on One by this activation.
- Type:Upgrade
- Proposal:Governance approved
- Release:Released
- Activation:Activated mainnet
Sources: Arbitrum (blog.arbitrum.io) — ArbOS Elara: Compliance Filtering, Priority Fee Support (external site) · Arbitrum Documentation — ArbOS 61 Elara (external site)
-
Arbitrum described a roadmap toward ZK settlement
An official Arbitrum blog post with an individual author byline described engineering milestones and said Offchain Labs would bring a future DAO proposal, which would be required to upgrade Arbitrum One. Roadmap publication is not production activation.
- Type:Roadmap
- Proposal:Roadmap before dao proposal
- Release:Not established
- Activation:Not active from this evidence
Source: Arbitrum (blog.arbitrum.io) — ZK Settlement is Coming to Arbitrum (external site)
-
HONEY stablecoin renamed Bera USD (BUSD)
Berachain changed its stablecoin's name and symbol from HONEY to Bera USD (BUSD) on 19 August 2026. The contract address stayed the same, so balances, approvals and integrations carried over with no migration, swap or claim.
- Implementation:name and symbol changed at the existing contract
- Release:Done
- Activation:effective 2026-08-19
Sources: Berachain docs — BUSD Token (external site) · Berachain docs — Frequently Asked Questions (external site)
-
Movement's guide describes Ledger signing through Motion
Movement's guide explains importing Ledger accounts into Motion and signing Movement transactions with the Ledger Aptos app, noting that Motion requires blind signing so the device may show only a transaction hash.
- Implementation:guide published
- Release:current guide describes availability; original publication date unconfirmed
- Activation:Motion's homepage still lists hardware support as on the way; not tested here
Sources: Movement Network — How to Use Ledger with Motion Wallet (external site) · Movement Network — Motion Wallet (external site) · Ledger — Aptos Wallet (external site)
-
Ravencoin Core 4.8.0 fixed a KAWPOW header flaw exploited from 7 August 2026
Release 4.8.0 requires, from block 4,487,776, that the height declared inside a KAWPOW header match the block's real height, and adds a checkpoint at block 4,487,775. The release notes say the flaw let a miner bypass the DAG and GPU requirements and stopped nodes from syncing or restarting. According to 2Miners, pools rebuilt the chain from the last clean block after finding 96 forged blocks, replacing about three days of history.
- Implementation:fix published as pull request 1289 on 18 August 2026
- Release:Ravencoin Core 4.8.0 released 19 August 2026; 2Miners says it distributed a patched build on 10 August
- Activation:header check enforced by upgraded nodes from block 4,487,776
Sources: RavenProject — V4.8.0 Core Release: Patch 2 major bugs (external site) · RavenProject — V4p8p0: fix the DAG/GPU-bypass mining bug (pull request 1289) (external site) · 2Miners — August 2026 Work Progress: Ravencoin Chain Rescue, Pearl Hard Fork, and Kaspa Reward Cut (external site) · blockbook.ravencoin.org — Blockbook: Ravencoin block 4,487,775 (external site) · blockbook.ravencoin.org — Blockbook: Ravencoin block 4,487,776 (external site) · RavenProject — Ravencoin Core chainparams.cpp (develop) (external site)
-
Community continuance proposal passed, minting new SCRT to fund the chain
Proposal 365 passed on 19 August 2026, scheduling the 1.26.0 community continuance upgrade at height 26,790,327. The plan keeps the existing chain, creates a new stewardship entity, and funds it, core development, validators, relayers, builders and bridge exploit victims with a large new mint and a fixed 5% inflation rate. The upgrade was later applied at that height.
- Proposal:passed on chain
- Implementation:upgrade released from the community repository
- Release:v1.26.0-community-continuance published 2026-08-20
- Activation:applied at height 26,790,327
Sources: Secret Network governance (public REST endpoint) — Proposal 365: Community Continuance of Secret Network (L1) (external site) · Lavender.Five Nodes public endpoint — Applied upgrade plan v1.26.0-community-continuance (public REST endpoint) (external site) · Secret3dev on GitHub — v1.26.0-community-continuance release (external site) · Secret Network Forum (Secret Network Foundation post) — Secret^3: Community Continuance of Secret Network L1 (external site) · Lavender.Five Nodes public endpoint — Total uscrt supply (public REST endpoint) (external site) · Lavender.Five Nodes public endpoint — Current inflation (public REST endpoint) (external site)
-
dcrd 2.1.6 ships an emergency fix for a consensus vulnerability
dcrd 2.1.6 fixed a critical consensus-related vulnerability and told everyone to upgrade or risk being forked off the network. It also fixed a possible periodic deanonymisation attack on mixing and several denial-of-service issues.
- Implementation:shipped in dcrd 2.1.6
- Release:stable release published 2026-08-18
- Activation:tightened rules enforced by upgraded nodes immediately; not a ticket-holder vote
Sources: Decred developers — dcrd v2.1.6 release notes (external site) · Decred developers — Decred binary releases (dcrd, dcrwallet, Decrediton) (external site) · Decred blog — Decred Consensus Vulnerability: Post-Incident Report (external site) · Decred developers (GitHub) — dcrd releases (Atom feed) (external site)
-
Report on the July 2026 peer-message flood: ledger kept validating
An incident report described a flood of junk validator manifest messages that began on the evening of 30 July 2026 and caused mass peer disconnects across the network, including at two default-list validators. The report says the ledger never halted or forked, no funds or keys were affected, and a 3.2.1 hotfix limiting manifest sizes and caches was released on 31 July, with limits adjusted in 3.3.0.
- Implementation:manifest size, per-message and cache limits added to the reference server
- Release:3.2.1 hotfix released 2026-07-31; limits loosened in 3.3.0 the following week
- Activation:server software change, effective as each operator upgrades; the report describes no amendment
Source: XRP Ledger blog (xrpl.org) — Vulnerability Disclosure Report: XRPL Manifest Flood (external site)
-
Abstract's Ethereum contracts moved to ZK Stack protocol version 0.30.1 with new proof verifiers
L2BEAT recorded three upgrades of Abstract's main contract on Ethereum in August 2026, moving it to protocol version 0.29.5 (4 August), 0.30.0 (8 August) and 0.30.1 (16 August), each with new Boojum proof verifiers. L2BEAT names Abstract's multisig as applying the last two, says ZKsync Era uses the first two verifier sets too, and says the 0.30.1 verifiers had been registered in the shared ZK Stack contracts beforehand. For each upgrade L2BEAT noted that the new verifiers had not yet been reproduced.
- Implementation:applied to Abstract's contracts on Ethereum mainnet
- Release:protocol version 0.30.1 recorded by L2BEAT
- Activation:active since 2026-08-16 per L2BEAT's contract record
Sources: L2BEAT — Abstract (external site) · Abstract Foundation (GitHub) — abstract-node releases (external site)
-
August 17 notice delays CIP-0104 MainNet activation; later activation unverified
The Canton Foundation said traffic-based app rewards would not go live on MainNet on 18 August 2026 because the on-chain proposal combining the supporting Daml models with activation was not approved. The notice said the models would instead be enabled on 18 August and Super Validators would gain a voting interface for featured-app weights, while activation awaits further governance with no revised date. Current docs describe traffic-based accounting, but no subsequent dated MainNet activation result was verified on October 11.
- Proposal:CIP-0104 approved on 2026-02-12
- Implementation:supporting Daml models scheduled to be enabled on MainNet on 18 August 2026, per the 17 August notice
- Release:shipped in Splice; the combined activation proposal was not approved
- Activation:August 18 activation was cancelled in the August 17 notice; a later dated MainNet activation result was not verified on 2026-10-11
Sources: Canton Network Forum (Announcements) — CIP-0104 MainNet Go-Live Update (external site) · Canton Foundation (CIPs repository) — CIP-0104: Traffic-Based App Rewards (external site) · Canton Network Docs — Canton Coin Tokenomics (external site) · Canton Network — Traffic-Based App Rewards (external site)
-
A public short-term Glamsterdam testnet was announced
The Foundation announced Platåberget for post-Glamsterdam experimentation and warned about tooling with hard-coded gas limits. A testnet announcement is not Mainnet activation.
- Type:Testnet
- Proposal:Selected for testing
- Release:Testnet
- Activation:Testnet announced not mainnet
Sources: Ethereum Foundation — Announcing the Platåberget Testnet (external site) · ethereum.org community — Glamsterdam (external site)
-
Node release v2026.08 adds collators to Catchain 2.0
TON's v2026.08 node release added collators to its Simplex-based consensus, letting specialized nodes build blocks on behalf of validators, along with better node metrics and stability fixes.
- Implementation:implemented in node software
- Release:released 2026-08-17
- Activation:mainnet use not verified
Sources: ton-blockchain maintainers — TON v2026.08 release notes (external site) · ton-blockchain maintainers — TON releases (external site)
-
WAX announces a smaller guild set and API provider program
WAX planned September reductions from ten to seven active guilds and six to three standbys, plus three lead API providers. A schedule read on October 12, 2026 still listed eight active guilds.
- Proposal:announced plan
- Implementation:not complete on October 12, 2026: eight active guilds were scheduled
- Release:announcement, not a software release
- Activation:September target not reflected in the October 12, 2026 schedule
Sources: WAX — Streamlining WAX: Infrastructure for a Resilient Future (external site) · Greymass (public WAX API node) — WAX Chain API get_producer_schedule via wax.greymass.com (external site)
-
Dogecoin Core development branch caps inbound peers per network subnet
A change merged into Dogecoin Core's master branch limits how many inbound connections a node accepts from the same public network range, so a node's peers come from more varied networks. It is not in any release yet.
- Proposal:pull request 4036
- Implementation:merged into the development branch
- Release:not in any release (latest release 1.14.9)
- Activation:no activation needed; applies only to nodes running a future release that includes it
Sources: Dogecoin Core developers — Improve inbound peer diversity/limit subnet conns, pull request 4036 (external site) · Dogecoin Core developers — Dogecoin Core releases (external site)
-
Harmony publishes rollback recovery rules and operator procedures
Harmony released v2026.1.2 with abandoned-block rejection and emergency recovery safeguards. Its recovery documents identify checkpoints at shard-0 block 92,730,034 and shard-1 block 94,978,278. Validator instructions stage v2026.1.2 and require a coordinated start; the separate post-rollback node guide requires v2026.1.3 or newer. Exact restart timing and per-operator uptake were not independently verified.
- Implementation:recovery code and operator procedures published
- Release:v2026.1.2 on 2026-08-15, v2026.1.3 on 2026-08-19
- Activation:rollback checkpoints documented; precise restart and uptake not verified
Sources: Harmony (GitHub) — Mainnet Release 2026.1.2 (external site) · Harmony (GitHub) — Reject abandoned branch hashes (#5106) (external site) · Harmony (GitHub, rollback-92730034 branch) — Node operator rollback guide (external site) · Harmony (GitHub, rollback-92730034 branch) — Validator rollout notes: shard-0 clean-database recovery (external site) · Ankr — Harmony reaches end of support (5 October 2026) (external site) · harmony-migration repository (polymorpher) — Harmony migration user FAQ (external site)
-
Proposal to finalise Mint and Lend parameters and extend claims is rejected (proposal 221)
Proposal 221, the second phase of the wind-down, would have finalised the Mint and Lend parameter changes, aligned limits on deprecated markets and extended the incentive claim deadline to 31 December 2026. Voting closed on 15 August 2026 with about 45 million KAVA voting no and about 22 million no with veto, against about 0.13 million yes.
- Proposal:Rejected
- Implementation:not applied
- Release:no software release involved
- Activation:not activated
Sources: Kava Labs public REST endpoint — Proposal 221: Phase 2, Finalize Kava CDP and Lend Debt Parameters, Extend Incentive Claims (external site) · Kava Labs public REST endpoint — Proposal 222: Phase 2, End Incentives, Limit Borrowing, and Signal Protocol Wind-Down (external site)
-
Pasteur hard fork scheduled and then activated on BSC mainnet
BNB Chain announced Pasteur for 25 August 2026 at 02:30 UTC with client v1.7.7; a 14 September post confirms activation. It rejects duplicate validators in CometBFT bridge checks (BEP-682) and hardens staking/governance key handling (BEP-695). BEP-675's builder-prepared block path needs no fork itself but becomes available after Pasteur and is enabled through RPC.
- Proposal:BEP-673 meta proposal with BEP-675, BEP-682 and BEP-695
- Implementation:shipped in client v1.7.7
- Release:mandatory mainnet release
- Activation:activated on mainnet 2026-08-25 02:30 UTC
Sources: BNB Chain Blog — Pasteur Hardfork Arrives on BSC Mainnet on August 25 (external site) · BNB Chain Docs — Pasteur Upgrade of BSC (external site) · BNB Chain (GitHub) — bsc v1.7.7 (Pasteur hardfork) (external site) · BNB Chain Blog — Post-Pasteur Hard Fork: BSC Packs 28% More Gas Per Block With More Scale Ahead (external site)
-
Governance appointed Solva as Neutron's security-only maintainer
Proposal 4, submitted 14 August and passed 21 August 2026, appointed Solva as security maintainer for up to 12 months, recognised solva-solutions/neutron as the canonical patch repository and funded a capped allocation from the community pool. The first patch under the mandate, v11.2.0, was applied at height 61317700 around 27 August 2026.
- Proposal:proposal 4 passed 2026-08-21
- Implementation:mandate active
- Release:v11.2.0 released 2026-08-24; v11.2.1 on 2026-09-07
- Activation:v11.2.0 applied at height 61317700
Sources: Neutron on-chain governance (via Solva REST endpoint) — Governance proposal 4: Neutron Security Maintenance Mandate (external site) · Solva — Proposal: Neutron Long-Term Security Maintenance Mandate and 12-Month Funding (external site) · Solva — Neutron v11.2.0 release (external site) · Solva — solva-solutions/neutron (canonical maintenance repository) (external site)