News
Follow what has changed.
Reviewed news adds a checked explanation of a development and the stage the evidence supports. Automatic headlines are for discovery and are labelled as not yet reviewed. Publication dates and review dates are shown separately, and older items stay as history.
Reviewed news
894 reviewed developments across 151 chains. Each record retains its own review date. A missing review date stays unknown; a check or collection date never replaces it.
A weekly reviewed news run is planned and not yet running, so many chains will show Review overdue until it starts. The items stay available as history.
Sorted by publication date · newest first; equal dates follow the alphabetical chain order. Page 9 of 18.
One chain's developments, A to Z
-
Validator instructions and mainnet validator configuration published
Plasma's node templates v1.0.0 added instructions and configuration for running a validator on devnet, testnet and mainnet: generating a BLS12-381 keystore, setting a fee recipient and switching the node role. The templates say this does not place a node in the active validator set; enrolment still needs the Plasma team.
- Implementation:validator templates published
- Release:released 2026-08-14
- Activation:no open enrolment; validators join through the Plasma team
Sources: Plasma (PlasmaLaboratories, GitHub) — node-templates v1.0.0 release (external site) · Plasma (PlasmaLaboratories, GitHub) — Plasma Node Templates README (external site) · Plasma Docs — Tokenomics (external site)
-
Spark multi-input forgery bug disclosed and temporarily mitigated
Firo disclosed a bug that could let multi-input Spark transactions forge coins, reported on 1 August 2026. Version 0.14.17.2 limited Spark spends to a single input until a permanent fix. Firo said it found no evidence of inflation beyond about 200 FIRO created by the researcher to prove the issue.
- Implementation:single-input restriction shipped in v0.14.17.2
- Release:v0.14.17.2 released 2026-08-13
- Activation:the code applies the single-input rule from block 1,355,970 (mined 2026-08-09); the hard fork at block 1,371,000 on 2026-09-04 restored multi-input spends with a new spend format
Sources: Firo — Spark vulnerability mitigated (external site) · Firo developers (firoorg) — Firo v0.14.17.2 (GitHub release) (external site) · Firo — Firo v0.14.18.0 released: Spark functionality to be fully restored (external site) · Firo developers (firoorg) — Firo reference node: src/chainparams.cpp (master) (external site) · Firo — Firo Insight API: block 1,355,970 (external site) · Firo — Firo Insight API: block 1,371,000 (external site)
-
Protocol 28 (Adapter) activated on Mainnet with earlier consensus voting and shared contract code
Protocol 28 took effect on Mainnet on 16 September 2026 according to Stellar Docs' version history. SDF announced it on 13 August, when stellar-core v28.0.0 was released. It lets validators begin voting before a full transaction set arrives and drop a late or invalid set, enables shared upgradable contract code, and adds contract-data migration support.
- Proposal:CAP-83, CAP-85 and CAP-86 listed for Protocol 28
- Implementation:stellar-core v28.0.0 released 2026-08-13
- Release:stable releases scheduled from 13 to 21 August 2026
- Activation:Mainnet active from 16 September 2026 per Stellar Docs; the separately planned parallel transaction-set download rollout was not independently verified.
Sources: Stellar Development Foundation — Introducing Adapter, Protocol 28 on Stellar (external site) · Stellar Development Foundation — Stellar blog (external site) · Stellar Development Foundation (GitHub) — stellar-core v28.0.0 (external site) · Stellar Protocol (GitHub) — CAP-0083: Allow validators to vote to drop the transaction set from the current ledger (external site) · Stellar Docs (Stellar Development Foundation) — Software Versions (external site)
-
Algorand 5.0.0 consensus upgrade added post-quantum accounts and size-based fees
go-algorand 5.0.0 shipped native Falcon-1024 accounts, a per-byte surcharge for oversized transaction content, larger apps and AVM version 13. The Foundation reported reaching 90% upgrade support on 15 August 2026, with a mandatory 208,000-round wait before activation. Block headers read from a public mainnet node show protocol version 42 taking effect at round 64,318,659 on 22 August 2026 (UTC).
- Proposal:approved by block-proposer upgrade vote, per the Foundation
- Implementation:released in go-algorand 5.0.0, followed by patch releases 5.0.1 and 5.0.2
- Release:5.0.0 stable released 2026-08-12
- Activation:active on mainnet since round 64,318,659 (2026-08-22 17:43 UTC), per public-node block headers matched to consensus version 42
Sources: algorand/go-algorand maintainers — Algorand 5.0.0 release notes (external site) · Algorand Foundation — Getting ahead of the (elliptic) curve: what's in the next consensus upgrade (external site) · Algorand Foundation — Algorand v5.0.0 is here. Here's what it means for you. (external site) · Algorand Developer Portal — Post-Quantum Accounts (external site) · algorand/go-algorand maintainers — go-algorand protocol/consensus.go (external site) · Nodely — Mainnet block 64,318,659 header (Nodely public algod) (external site)
-
Nitro v3.11.3 was released for ArbOS 61 operators
Offchain Labs published Nitro v3.11.3 on GitHub on August 12 (its release notes carry an August 3 version date), and the ArbOS 61 documentation identifies it as the minimum mandatory version for Arbitrum One and Nova node operators ahead of Elara activation. The client release alone is not activation evidence.
- Type:Release
- Proposal:Not applicable
- Release:Released
- Activation:Not established by release
Sources: Offchain Labs — Arbitrum Nitro v3.11.3 (external site) · Arbitrum Documentation — ArbOS 61 Elara (external site)
-
Grin wallet 5.5.0 adds a built-in Tor client and mixing APIs
grin-wallet v5.5.0 integrates the Arti Tor client, exposes interfaces for the experimental mwixnet mixing service, resumes and speeds up output scanning, and fixes Slatepack address handling. It followed node v5.5.1 on 2026-08-11, which updated TLS and HTTP dependencies and switched the terminal interface backend.
- Implementation:shipped in wallet v5.5.0 and node v5.5.1
- Release:stable releases published 2026-08-11 and 2026-08-12
- Activation:no consensus change; takes effect as users upgrade
Sources: GitHub API (mimblewimble/grin-wallet) — Grin wallet release records (external site) · GitHub API (mimblewimble/grin-wallet) — Grin wallet commits between v5.4.1 and v5.5.0 (external site) · GitHub API (mimblewimble/grin) — Grin v5.5.1 release record (external site) · GitHub API (mimblewimble/grin) — Grin commits between v5.5.0 and v5.5.1 (external site)
-
Harmony v2026.1.1 fixes cross-shard receipt replay and a quorum-counting flaw
Harmony published node release v2026.1.1, whose only listed change is pull request 5101. Its commits fix two flaws. The signature check used for committees from before staking began counted every committee member instead of the members who actually signed, so a block with no signers and an empty signature could pass as having a quorum. And for receipts from blocks older than an earlier replay fix, the marker that records a cross-shard receipt as already used was built from unsigned fields, so a genuine receipt could be resubmitted with altered details and credited again on the receiving shard with no matching debit on the sending shard. The release notes do not call the upgrade mandatory and set no activation epoch.
- Implementation:fixes merged 2026-08-12 in pull request 5101
- Release:v2026.1.1 published 2026-08-12
- Activation:no hard fork or activation epoch stated; applied on nodes that installed it; uptake not verified
Sources: Harmony (GitHub) — Mainnet Release 2026.1.1 (external site) · Harmony (GitHub) — Cx receipt fixes main (#5101) (external site) · Ankr — Harmony reaches end of support (5 October 2026) (external site) · Harmony (GitHub, rollback-92730034 branch) — Validator rollout notes: shard-0 clean-database recovery (external site) · Harmony (GitHub, rollback-92730034 branch) — Node operator rollback guide (external site)
-
Elements 29.4.1 release-candidate tag published for testing
The Elements project published a signed elements-29.4.1rc1 tag on 12 August 2026. It is a release candidate, and its tag page provides no release notes. Blockstream's May roadmap described Bitcoin Core 29 parity work, with the final release subject to Technology Board and federation review. The official release list checked on 11 October 2026 still marks 23.3.4 as the latest final release.
- Proposal:on the May 2026 roadmap with a July 2026 release-candidate goal
- Implementation:release candidate 29.4.1rc1 tagged on 12 August 2026
- Release:candidate tag only; no final 29.x release listed in the official release index checked 11 October 2026
- Activation:none confirmed; final release subject to Technology Board and federation review
Sources: ElementsProject (GitHub) — elements-29.4.1rc1 (external site) · ElementsProject (GitHub) — Elements releases (external site) · The Liquid Blog — Blockstream Shares Liquid Development Roadmap: 0-Conf, PQ Readiness, BitVM & More (external site)
-
Base released a hinted-P384 design for onchain AWS Nitro validation
Base published an open-source redesign that moves expensive P-384 inversions offchain as checked calldata hints and reported Base measurements below the per-transaction gas cap. The post said Base planned to use the approach in its canonical bridge's proofs system; Base's Cobalt upgrade, live on Mainnet since September 30, 2026, now verifies AWS Nitro attestations for TEE signer registration fully onchain using checked P-384 hints, replacing the RISC Zero and Boundless proving flow.
- Type:Release
- Proposal:Not applicable
- Release:Open source library released
- Activation:Canonical bridge use live observed in current docs
Sources: Base Engineering Team — Making AWS Nitro Validation feasible onchain (external site) · Base — Cobalt Overview (external site)
-
Operator reports confirm Moonbeam's halt; exact stop date remains unresolved
Moralis's August 11 deprecation notice, later updated August 26, reports that the Moonbeam and Moonriver chains stopped producing blocks and that holders migrated tokens to Base. Moralis gives August 1 as the stop date; a Nightswatch issue opened August 11 describes approximately August 10. The exact final Moonbeam block was not reverified.
- Implementation:Operator notices report stopped block production after the announced July wind-down.
- Release:Moralis published its original deprecation notice August 11 and updated it August 26.
- Activation:Halted status is supported; final height, exact shutdown time and the August 1/August 10 discrepancy remain unresolved.
Sources: Moralis — Moralis product changelog (Moonbeam support removal notices) (external site) · nightswatchhq (GitHub) — A halted chain renders as a perfectly healthy subgraph (issue 15) (external site) · Moonbeam — Moonbeam Strategic Update: Moonbeam Network Relaunches on Base (external site)
-
stacks-core 4.0.2 node and signer release
A maintenance release of the Stacks node and signer software that works with existing 4.0.x chainstate. Miners must now name an existing Bitcoin Core wallet in their configuration, a change the notes tie to Bitcoin Core 31 and later. It also cuts Clarity memory use, makes signers reject unknown configuration fields, and carries two contract-rule fixes that apply only from a later Epoch 4.1.
- Implementation:Released
- Release:stable release 4.0.2; optional but recommended
- Activation:no network activation; its Epoch 4.1-gated fixes wait for an activation height the notes do not give
Sources: Stacks core contributors (GitHub) — stacks-core release 4.0.2 (external site) · Stacks core contributors (GitHub) — stacks-core releases (external site)
-
ICF published its Q3 2026 ATOM delegation selections
The Interchain Foundation published the Q3 adjustment for its ATOM delegation program, including selected validators, ecosystem-growth recipients, and updated qualification criteria. This is a foundation delegation program, not Cosmos Hub consensus or a protocol activation.
- Release:published program update
- Activation:not a Cosmos Hub protocol activation
Sources: Interchain Foundation — ICF Delegation Program: Q3 Selected Validators (external site) · Interchain Foundation — Interchain Foundation Medium RSS (external site)
-
Noble v11.6.0 includes closure of Noble Swap pools
Release v11.6.0 includes an upgrade handler to close Noble Swap pools and claim accrued yield and protocol fees. Its swap-module change removes automatic per-block handling, leaving unbondings for the upgrade handler. The chain's upgrade record shows it applied at height 56,800,000, a block dated 12 August 2026, and on 12 October 2026 the one remaining pool had zero liquidity shares.
- Implementation:released as v11.6.0
- Release:released 2026-08-10
- Activation:applied on mainnet at height 56,800,000 (12 August 2026) per the chain's upgrade record
Sources: Noble on-chain state via Noble public REST endpoint — Noble applied upgrade plan v11.6.0 (on-chain query) (external site) · Polkachu public Noble RPC endpoint — Noble block 56,800,000 (RPC query) (external site) · Noble on-chain state via Noble public REST endpoint — Noble Swap pools (on-chain query) (external site) · noble-assets/noble maintainers — Noble v11.6.0 release notes (external site) · Noble documentation — Mainnet Chain Upgrades (external site)
-
HIP 149 approved: Proof-of-Coverage retired, Mobile target minimum, supplement mint and Advisory Council
Helium's August 7 post confirms HIP 149 passed and its Mobile target minimum was operating. The package retires Proof-of-Coverage rewards, defines a burn-limited reward top-up, authorizes a separate operations supplement and establishes council oversight. HIP 150 later raised the original 50% target to 80% for a stated term. The approximately 141 million HNT supplement over 36 months is an authorization; actual vault minting was not independently verified.
- Proposal:HIP 149 front matter says Approved; Helium's August 7 post confirms passage
- Implementation:oracle 4.0.0 includes HIP-149 tracking; 4.1.0 removes the Mobile PoC reward path
- Release:oracle-data docs date PoC removal to July 6; oracle 4.1.0 release is dated July 29, 2026
- Activation:target active per August 7 announcement; HIP 150 supersedes its 50% rate; supplement execution independently unverified
Sources: Helium (HIP repository) — HIP 149: Helium Utility and Emissions Realignment (external site) · Helium Documentation — Helium Oracle Data (external site) · Helium (GitHub) — helium/oracles release 4.0.0 (HIP-149 tracking) (external site) · Helium (GitHub) — helium/oracles release 4.1.0 (external site) · Helium blog — New Earnings Safety Net for Helium Deployers (external site) · Helium (HIP repository) — HIP 150: Mobile Deployer Prioritization (external site)
-
Node patch 9.0.4 fixes gas estimation and Import Sync
Rootstock published version 9.0.4 of RSKj as an optional patch in the Vetiver line. It stops eth_estimateGas from using the gas amount supplied by the caller as the simulation budget, repairs the Import Sync feature, fixes handling of invalid ports and adds logging for monitoring federation (peg signer set) changes, along with security and performance work the notes do not itemize. Rootstock recommends that node operators upgrade.
- Implementation:released as RSKj 9.0.4
- Release:optional patch release; upgrade recommended for node operators
- Activation:no network activation; changes apply when an operator installs the release
Sources: Rootstock — Vetiver 9.0.4: Patch Release (external site) · Rootstock (GitHub) — RSK Vetiver Release 9.0.4 (external site) · Rootstock (GitHub) — rskj releases (external site)
-
v4.4.0 brought Cosmos SDK v0.53.8 security fixes to Babylon through a coordinated upgrade
Node release v4.4.0 moved Babylon to Cosmos SDK v0.53.8 and wasmd v0.60.5, both listed as state-breaking in the change log. Its v4.4 upgrade handler changes no state; the code says it exists to coordinate the binary swap for the SDK security release. The Cosmos SDK team had published v0.53.8 on 27 July 2026 with fixes to transaction signing, signer and multisig checks and public-key validation, and asked chains to adopt it through a coordinated upgrade.
- Proposal:proposal 23 shown passed, with voting end dated 7 August 2026
- Implementation:Cosmos SDK v0.53.8 and wasmd v0.60.5; upgrade handler makes no state changes
- Release:released as v4.4.0 on GitHub on 6 August 2026
- Activation:governance approval documented; exact mainnet activation height unverified
Sources: Babylon Labs — babylon v4.4.0 release (external site) · Babylon Labs — Babylon node CHANGELOG at tag v4.4.0 (external site) · Babylon Labs — v4.4 upgrade handler source (external site) · Babylon Labs — babylon go.mod at tag v4.4.0 (external site) · Cosmos SDK maintainers (cosmos/cosmos-sdk) — Cosmos SDK v0.53.8 release (external site) · Valopers — Babylon governance proposals (external site)
-
Fiber Network v0.9.0 focuses on reliability and security
The Fiber reference node added a database migration system, backup and restore, on-chain settlement of pending payments after a channel is force-closed, and routing, watchtower and recovery improvements, with broad input-validation and resource-exhaustion hardening. A follow-up v0.9.1 on 2026-09-11 fixed settlement edge cases.
- Implementation:Released
- Release:v0.9.0 published 2026-08-06; v0.9.1 published 2026-09-11
- Activation:not a CKB consensus change
Sources: Nervos Network (nervosnetwork/fiber) — Fiber v0.9.0 (external site) · Nervos Network (nervosnetwork/fiber) — Fiber releases (external site) · Nervos Network (nervosnetwork/fiber) — Fiber Network Node (external site)
-
Era node software core v31.4.0 added support for Protocol Upgrade 29.5
Matter Labs published release core v31.4.0 of the zksync-era node software. Its notes list support for Protocol Upgrade 29.5; let the node's Ethereum watcher take proof verification key hashes from the new-protocol-version event and handle both formats of upgrade events; fix how the verifier component masks factory dependency hashes; and remove a sort from one database query. The notes do not say whether node operators must install it or when version 29.5 took effect on mainnet. Core v31.5.0 followed on 8 August 2026; its notes list one change, a vm2 library update labelled v32.
- Implementation:Protocol Upgrade 29.5 support merged into the core node code, with Ethereum watcher, verifier and database changes
- Release:core v31.4.0 published on GitHub on 2026-08-06; core v31.5.0 marked Latest from 2026-08-08
- Activation:takes effect on each node when its operator installs it; the release gives no mainnet activation time for protocol version 29.5
Sources: Matter Labs (GitHub) — core: v31.4.0 (external site) · Matter Labs (GitHub) — core: v31.5.0 (external site) · Matter Labs (GitHub) — matter-labs/zksync-era releases (external site) · ZK Nation Forum — Notice of 2026 Instant Upgrades: Security Patches (external site)
-
Greymass launched a browser version of the Anchor wallet with free Vaulta accounts
Aaron Cox of Greymass announced Anchor for the web, a non-custodial wallet that runs in the browser with passkey-protected keys created on the user's device and Ledger support in Chrome-based browsers. Account creation is free through social logins handled by Greymass's account service; Anchor's current site names Google or Apple sign-in. Apps built on Wharf can offer it in-app. The post says the project began as network-funded web-authenticator work and was first planned as a Vaulta Account at account.vaulta.com.
- Implementation:Launched
- Release:available at anchorwallet.io
- Activation:application service, not a protocol activation; operations not tested
Sources: Aaron Cox (Greymass), jesta.blog — Anchor for the web (external site) · Greymass — Anchor Wallet (external site) · Greymass — Anchor with a Ledger (external site) · Vaulta Documentation — Accounts (external site)
-
Shielded transfers announced live on Dash Platform mainnet
dash.org announced that shielded transfers are live on the Dash Platform (Evolution) mainnet. Dash Platform 4.0, released on 1 July 2026, introduced an Orchard-based shielded pool for Platform credits under protocol version 12, with private transfers, shielding from a main-chain asset lock and shielded withdrawals back to the main chain.
- Implementation:shipped in Dash Platform 4.0.0
- Release:v4.0.0 published 2026-07-01; v4.1.0 (protocol version 13) followed on 2026-07-27
- Activation:announced live on mainnet 2026-08-04; exact activation height not verified
Sources: Dash (dash.org) — Shielded transactions are live on the Dash Evolution mainnet (external site) · Dash Platform developers (dashpay) — Dash Platform v4.0.0 release notes (external site) · Dash Platform developers (dashpay) — Dash Platform v4.1.0 release notes (external site) · Dash documentation — Dash Platform docs: Shielded Pool (external site)
-
Repository for the retired proof-of-work client archived
The HorizenOfficial/zen repository, home of the client for Horizen's former proof-of-work chain, was archived and made read-only; its notice says vulnerability reports are no longer accepted and points to the current Horizen docs.
- Implementation:repository archived
- Release:final release was zend 6.0.0 (1 July 2025)
- Activation:archived 4 August 2026
Sources: Horizen contributors — HorizenOfficial/zen (archived) (external site) · Horizen contributors — zend v6.0.0 release notes (external site)
-
Dash Core 23.1.8 fixes three remotely triggerable node crashes
Dash Core 23.1.8, still the latest stable Dash Core release on 4 October 2026, fixed three crashes a remote peer could trigger: one while removing masternode provider transactions after an operator-key change, one from an unchecked quorum type in signature-share messages and one from quorum commitments that reference a block with no known parent. It also added limits and checks across many peer message handlers, including quorum signing, ChainLock, governance, CoinJoin, spork and bloom-filter messages. The developers said consensus rules and funds are not affected.
- Implementation:shipped in Dash Core 23.1.8
- Release:stable patch release published 2026-08-03; latest stable Dash Core release on 4 October 2026
- Activation:no consensus change; takes effect on each node as it upgrades
Sources: Dash Core developers (dashpay) — Dash Core 23.1.8 release announcement (external site) · Dash Core developers (dashpay) — Dash Core v23.1.8 release notes (external site) · Dash Core developers (dashpay) — Dash Core releases (Atom feed) (external site)
-
Mwixnet mixing service opened for community testing on testnet
A Grin developer reported deploying a public testnet route for mwixnet, with one swap server and one mixer running over Tor, and published a test guide while wallet and server compatibility work continued.
- Proposal:community test
- Implementation:testnet route deployed by a developer
- Release:not released for mainnet
- Activation:not active on mainnet as of 2026-10-04
Sources: Grin forum — Mwixnet community TEST (external site) · Grin developers — mimblewimble/mwixnet (external site) · Grin forum — Grin Development Progress Reports (external site)
-
Node release v2026.07 improves QUIC connection and public-broadcast performance
TON's v2026.07 node release improved the performance of QUIC connections and public broadcasts between nodes, added metrics for QUIC and fixed stability issues. The release notes credit several bug-bounty participants. They describe no change to contract behaviour, fees or consensus rules.
- Implementation:implemented in node software
- Release:released 2026-08-03
- Activation:no network-wide activation described; changes apply to nodes that install the release
Sources: ton-blockchain maintainers — TON v2026.07 release notes (external site) · ton-blockchain maintainers — TON releases (external site)
-
AtomicAssets v2 contract released; current WAX deployment not re-established
AtomicAssets maintainers released version 2.0.0 on August 3, 2026, adding mutable templates, per-field media types, collection author succession and CPU reductions. New backing fails; burning an already-backed asset credits tokens to the user's contract balance for separate withdrawal. The previous WAX code-hash observation could not be reproduced.
- Implementation:released as v2.0.0 after five release candidates
- Release:GitHub release v2.0.0 published 2026-08-03
- Activation:Current WAX mainnet code hash not re-established; the previous observation is not used as fresh deployment evidence.
Sources: AtomicAssets (GitHub) — AtomicAssets v2.0.0 release (external site) · AtomicAssets (GitHub) — AtomicAssets CHANGELOG (external site) · AtomicAssets (GitHub) — AtomicAssets contract repository and README (external site)
-
Community node 3.2: security fixes, gas changes and a six-month proof window
Community node 3.2 was released on 2 August 2026 for activation by miner vote. It implements Pact 5.4.1, revised gas charges and six-month cross-chain proof expiry. The team's 21 August disclosure describes the fork as having occurred, explains security fixes and reports no exploitation found in its review. The exact activation height and time remain unverified.
- Proposal:released for miner vote
- Implementation:implemented in 3.2 and 3.2.1
- Release:released 2026-08-02 (3.2) and 2026-08-21 (3.2.1)
- Activation:the 21 August 2026 disclosure describes the 3.2 fork as completed; precise block height and activation time not verified
Sources: Kadena Community Edition — chainweb-node Community Edition 3.2 (external site) · Kadena Community Edition — chainweb-node Community Edition releases (external site) · Kadena Community Edition — chainweb-node Community Edition changelog (external site) · Kadena Community Edition — chainweb-node Community Edition 3.1 (external site) · Kadena Community Edition — Chainweb Community v3.2 (external site) · Kadena Community Edition — Chainweb 3.2 Ad-Vitam Transparency Report (external site)
-
Litecoin Core 0.21.5.6 added MWEB relay limits and a soft-fork rule
An urgent maintenance release that limits expensive MWEB light-client requests, caps MWEB transaction weight and inputs in relay policy, and adds a soft-fork rule from height 3,154,440 rejecting MWEB kernels that signal a peg-out with an empty peg-out list.
- Implementation:merged and released
- Release:Released
- Activation:rule scheduled from height 3,154,440; chain tip is past that height
Sources: litecoin-project — Litecoin Core v0.21.5.6 (external site) · Litecoin Space — Litecoin Space API: chain tip height (external site)
-
IBC closed in both directions on Sei
Governance Proposal 121, which passed on 31 July 2026, switched off outbound IBC transfers on Sei, after Proposals 116 and 120 had already disabled inbound transfers. IBC tokens still on Sei can move between Sei addresses but can no longer be sent back to their origin chains over IBC.
- Proposal:Proposal 121 passed 31 July 2026
- Implementation:IBC module outbound transfers disabled; inbound disabled by Proposals 116 and 120
- Release:governance parameter change; v6.4 (April 2026) added the inbound switch
- Activation:active: Sei's inbound and outbound IBC switches both read false on 4 October 2026
Sources: Sei Documentation — SIP-03 Migration Guide (external site) · Sei Documentation — Sei EVM Upgrade for Exchanges and Custodians (external site) · Sei Documentation — Sei Network Interoperability Framework (external site) · Sei Blog — Sei v6.4 Is Live on Mainnet: What It Means for IBC (external site) · Sei (public REST endpoint, sei-apis.com) — Sei mainnet REST: ibc InboundEnabled parameter (false, read 2026-10-04) (external site) · Sei (public REST endpoint, sei-apis.com) — Sei mainnet REST: ibc OutboundEnabled parameter (false, read 2026-10-04) (external site)
-
Sei v6.6 brought the first Giga components to mainnet
The mandatory v6.6.0 release, targeting mainnet height 224,201,091 on 4 August 2026, made the Ares execution client the default execution path for upgraded nodes and began the first, operator-controlled phase of the Eidos storage migration, which separates EVM history from other chain state. Autobahn consensus code is included but disabled until a separate network activation.
- Proposal:Software upgrade Proposal 122 (v6.6, height 224,201,091) passed; its voting ended on 3 August 2026
- Implementation:Released
- Release:v6.6.0 released 31 July 2026 as a mandatory mainnet upgrade
- Activation:active: mainnet reached the upgrade height 224,201,091 at 15:16 UTC on 4 August 2026, and Sei's Giga pages report v6.6 live from that day
Sources: Sei Protocol contributors — sei-chain v6.6.0 release notes (external site) · Sei Blog — Ares and Eidos, the first components of the Giga Upgrade, will go live in Sei 6.6 (external site) · Sei Blog — The Eidos Upgrade: replacing Sei's storage database while the chain is running (external site) · Sei Documentation — Sei Giga Technical Specification (external site) · Sei (public REST endpoint, sei-apis.com) — Sei mainnet REST: latest governance proposals (112 to 123, read 2026-10-04) (external site) · Seiscan (Etherscan) — Sei block 224,201,091 (2026-08-04 15:16:13 UTC) (external site)
-
java-tron GreatVoyage-v4.8.2.1 (Heraclitus) non-mandatory maintenance release
GreatVoyage-v4.8.2.1 (Heraclitus) was published as a non-mandatory upgrade after Pyrrho. Its notes list one functional change, improved HTTP API performance, plus two dependency updates: libp2p from 2.2.8 to 2.2.9 and grpc-java from 1.81.0 to 1.83.0. They describe no new virtual-machine feature, TIP or governance parameter.
- Implementation:shipped in java-tron v4.8.2.1
- Release:non-mandatory release; no deadline stated in the release notes
- Activation:no network activation described; the changes apply to nodes that install the release
Sources: tronprotocol (GitHub) — GreatVoyage-v4.8.2.1 (Heraclitus) release notes (external site) · tronprotocol (GitHub) — java-tron releases (external site) · TRON Developer Hub — Release Announcements (external site)
-
Governance revives expired IBC light clients for Injective, UX Chain and Secret
Kava governance passed three proposals replacing expired IBC light clients with fresh ones: Injective (voting closed 26 May 2026), UX Chain (3 June 2026) and Secret (30 July 2026). An expired client stops token transfers on that path until a vote restores it. The same Secret client had already been revived in August and December 2025, and the UX Chain client had expired again by 27 September 2026.
- Proposal:Passed
- Implementation:substitute clients applied on-chain
- Release:no software release involved
- Activation:paths restored after each vote; the UX Chain client had expired again by 27 September 2026
Sources: Kava Labs public REST endpoint — Proposal 216: Recover IBC light client for Injective (external site) · Kava Labs public REST endpoint — Proposal 217: Recover IBC light client for UX Chain (external site) · Kava Labs public REST endpoint — Proposal 220: Recover IBC light client for Secret (external site) · Kava Labs public REST endpoint — Proposal 203: Recover IBC light client for Secret (external site) · Kava Labs public REST endpoint — Proposal 209: Recover IBC light client for Secret (external site) · Kava Labs public REST endpoint — Kava IBC client 07-tendermint-124 (UX Chain) status (REST endpoint) (external site)
-
SIMD-0286 block limit increase reported activated on Mainnet
The July 30 official changelog reported Mainnet activation of the 100-million-compute-unit block limit. That is a historical limit for 400ms slots: SIMD-0525 scales per-slot budgets with reduced slot duration. The July figure is not a timeless limit or a guarantee of transaction inclusion.
- Stage:Activated
Sources: Solana Foundation — Solana Changelog: July 30, 2026 (external site) · Solana Foundation and contributors — SIMD-0525: Reduce slot times (external site)
-
PoX-5 hard fork activated at Bitcoin block 960,230
Stacks activated Epoch 4.0, bringing PoX-5 (SIP-045) and Clarity 6 (SIP-044). The change added Bitcoin bonds that pair BTC with locked STX, removed most staking cooldown cycles, sent miner BTC into a reward pool converted to sBTC instead of paying stakers' Bitcoin addresses directly, and restored the 1,000 STX coinbase.
- Proposal:SIP-044 and SIP-045 approved by community vote (reported 21 July 2026)
- Implementation:implemented in stacks-core 4.0.1
- Release:stacks-core 4.0.1 released 15 July 2026 as a mandatory upgrade
- Activation:active from Bitcoin block 960,230, reached 30 July 2026
Sources: Stacks Labs — The Stacks PoX-5 Hardfork Is Live: What Comes Next (external site) · Stacks Labs — SIP-044 and SIP-045 Approved: Bitcoin Staking Is Ratified (external site) · Stacks Improvement Proposals (stacksgov) — SIP-045: PoX-5 Bitcoin Staking (external site) · Stacks core contributors (GitHub) — stacks-core release 4.0.1 (external site) · Stacks Foundation — Stacks 4.0.1 Network Upgrade - Clarity 6 & Bitcoin Staking (Hard Fork) (external site) · Stacks Documentation — Epoch 4.0 Consensus Changes (external site)
-
Osaka1 fork set a 1 gwei minimum base fee from 5 August 2026
Bera-Reth v1.4.3 announced the Osaka1 hard fork for 5 August 2026 at 16:00 UTC, enforcing a network-wide minimum base fee and minimum blob base fee of 1 gwei each. The release notes say fees at these floors are burned rather than paid to the proposer. Operators were told to run v1.4.4, released the same day, which restored a transaction-pool tip check. BeaconKit's notes for the fork say Osaka1 changed only the execution layer, so the consensus client did not need an upgrade.
- Implementation:Bera-Reth v1.4.3, superseded by v1.4.4
- Release:Released
- Activation:live on mainnet since 2026-08-05 per Berachain's upgrade table
Sources: Berachain (GitHub) — bera-reth v1.4.3 (Osaka1) (external site) · Berachain docs — Protocol Features (upgrade timeline) (external site) · Berachain (GitHub) — Bera-Reth releases (external site) · Berachain (GitHub) — BeaconKit v1.4.2-rc.0 (Osaka1 on Bepolia) (external site) · Berachain (GitHub) — Bera-Reth v1.4.4 (external site)
-
Bitcoin Cash Node v29.1.0 minor release
Bitcoin Cash Node released v29.1.0, a minor release with RPC and REST usability improvements, bug fixes and performance work, and recommended that users of earlier releases upgrade.
- Implementation:Released
- Release:released 2026-07-29
- Activation:not a protocol activation
Sources: Bitcoin Cash Node — Announcing Bitcoin Cash Node v29.1.0 (external site) · Bitcoin Cash Node (GitHub) — Bitcoin Cash Node release 29.1.0 (external site) · Bitcoin Cash Node — Bitcoin Cash Node v29.1.0 release notes (external site)
-
Bitlayer announces its public testnet shutdown
Bitlayer announced that it would shut down its public testnet at 23:00 UTC on 31 July 2026, discontinuing all testnet services, data and endpoints. Test data would not be kept and test assets would not be converted to mainnet. Mainnet services were stated to be unaffected.
- Proposal:service closure announced
- Implementation:not independently verified
- Release:not a software release
- Activation:scheduled for 31 July 2026 at 23:00 UTC; completion not independently established
Sources: Bitlayer Blog — Bitlayer Testnet Shutdown Notice (external site) · Bitlayer Documentation — Network (external site)
-
csprUSD contract upgrade and payment integration announced
The Casper Association announced a csprUSD upgrade for Casper 2.0 and signed CEP-3009 transfers. Sarson Funds' 30 July 2026 post anticipated a mainnet deployment later in the third quarter, conditional on testing, audits and compliance. The earlier 2024 announcement was for testnet, and current mainnet contract and supply were not verified.
- Proposal:upgrade announced by the Casper Association
- Implementation:new contract described; address not published in the post
- Release:not confirmed
- Activation:not confirmed on mainnet
Sources: Casper Association — Introducing csprUSD: The Stablecoin of the Machine Economy (external site) · Casper Association — Sarson Funds csprUSD Stablecoin Live on Casper Network Testnet (external site) · Casper Association — The latest from the Casper Association (news index) (external site) · Sarson Funds — csprUSD Revival: Why It Matters for Casper (external site)
-
Node v3.1.2 schedules four EIP features for the Ontology EVM
Ontology's 29 July 2026 notice schedules PUSH0, BASEFEE, MCOPY and transient storage (TSTORE and TLOAD) at height 20,800,000, estimated for 21 August. The v3.1.2 release tells all mainnet nodes to upgrade before that height. The notice limits compatibility to those features; an activation receipt was not recovered.
- Implementation:shipped in ontology v3.1.2
- Release:released 29 July 2026; upgrade mandatory for all mainnet nodes
- Activation:Scheduled for height 20,800,000; actual activation and execution were not independently established in this check.
Sources: Ontology News — Ontology MainNet v3.1.2: Four Ethereum Opcodes Arrive on the Ontology EVM (external site) · Ontology (GitHub) — ontology v3.1.2 release (external site)
-
Akash announced confidential-compute deployments
Akash announced that tenants can request trusted-execution hardware (Intel TDX or AMD SEV-SNP, with NVIDIA GPUs in confidential mode) so that provider operators cannot read workload memory, under AEP-83. The post says provider capacity is at an early stage and that automatic attestation is still being built.
- Proposal:AEP-83
- Implementation:announced as available with early provider capacity
- Release:Announced
- Activation:not a chain upgrade; availability depends on provider hardware
Source: Akash Network — Confidential Compute Comes to Akash (external site)
-
Runtime 2300 moved Astar to Polkadot SDK stable2512 and lowered the collator minimum to 1
Referendum 60 enacted runtime 2300, which moves Astar's runtime to the Polkadot SDK and Frontier stable2512 line, sets the relay parent offset to 0 and reduces the minimum number of collator candidates from 5 to 1. Collators and RPC nodes had to run client v5.50.0 alongside it.
- Proposal:passed as referendum 60
- Implementation:shipped in runtime 2300 with client v5.50.0
- Release:released 2026-07-28 (runtime) and 2026-07-30 (client)
- Activation:Enacted on Astar per referendum 60; exact execution date not freshly established.
Sources: Subsquare (Astar democracy) — Referendum 60: Runtime upgrade to 2300 (Polkadot SDK stable2512; collator minimum lowered to 1) (external site) · Astar Network (GitHub) — runtime-2300 release notes (external site) · Astar Network (GitHub) — v5.50.0 client release notes (external site)
-
Beam proposed lustration to verify circulating supply
Beam proposed a one-time disclosure step: each output created before a future activation height would reveal its amount and asset type the first time it is spent, so nodes can check disclosed totals against the emission schedule. Ownership would stay hidden, and new outputs would stay fully confidential.
- Proposal:published proposal; draft BIP-5 posted 8 August 2026 for discussion, status unassigned, replies into October 2026, no vote result found
- Implementation:not verified
- Release:no release carrying it was verified
- Activation:not active; activation height to be set by vote
Sources: Beam blog — Lustration Proposal: Verifying Beam's Supply Integrity (external site) · Beam Biweekly (community newsletter by Danai Raza) — Beam Biweekly: August 2026 Ed. #2 (external site) · Beam community forum (test forum) — BIP-5: BeamX DAO vote on Lustration (draft and discussion) (external site)
-
Juno v30 approved: fee market and Cosmos SDK 0.53
Governance proposal 377 passed and scheduled the v30.0.0 upgrade at height 40,420,069. The release moves Juno to Cosmos SDK 0.53, CometBFT 0.38, IBC-Go 10 and CosmWasm 2.2 support, turns on an on-chain fee market for JUNO with a minimum base gas price of 0.075 ujuno, adds voting-snapshot state and removes several retired modules, including the global fee and interchain query modules.
- Proposal:proposal 377 passed
- Implementation:released as v30.0.0
- Release:released 2026-07-16
- Activation:applied at height 40,420,069 per on-chain upgrade record
Sources: Juno on-chain state via PublicNode REST endpoint — Juno proposal 377: Upgrade Juno Mainnet to v30.0.0 (external site) · CosmosContracts — Juno v30.0.0 release (external site) · CosmosContracts mainnet repository — Juno v30 mainnet upgrade instructions (external site) · Juno on-chain state via PublicNode REST endpoint — Juno applied upgrade plan v30 (external site) · Juno on-chain state via PublicNode REST endpoint — Juno proposal 379: Juno v31 Software Upgrade (external site) · Juno on-chain state via PublicNode REST endpoint — Juno applied upgrade plan v31 (external site)
-
Kaia announces Safe Global support and retirement of its hosted interface
Kaia's 28 July 2026 announcement says Safe Global supports Kaia mainnet and Kairos, with existing Safe accounts unchanged by the interface move. Its main notice schedules safe.kaia.io retirement for 31 August, but the address-book section says 9 August. The later migration guide and Safe app could not be read in this check, so the exact completed shutdown date remains unverified.
- Implementation:Kaia supported on Safe Global
- Release:announced 2026-07-28
- Activation:Safe Global support announced live. Kaia-hosted interface sunset dates conflict within the announcement; completion was not independently verified.
Source: Kaia Blog — Important Update: Kaia Safe is moving to Safe Global (external site)
-
Movement said MVMT Labs filed for Chapter 11 and the network is not part of the filing
In a CEO update, Movement said the network was operating normally, that MVMT Labs, Inc. had filed for Chapter 11 as a separate entity, and that Move Industries, the foundation, MOVE and the network are not part of that filing.
- Implementation:filing reported by Movement
- Release:not applicable to software
- Activation:Movement states network operations are unaffected
Source: Movement Network — An update from Torab Torabi, CEO, Movement (external site)
-
Holders rejected SCRT Labs' proposal to migrate SCRT to Arbitrum
SCRT Labs proposed migrating SCRT to a new ERC-20 token on Arbitrum, claimable one-for-one from a 1 September snapshot, and said it would end support for the existing chain on that date either way. Signaling proposal 360 was rejected when voting closed on 28 July 2026; a Foundation counter-proposal (361) voted the same day was also rejected.
- Proposal:rejected on chain
- Implementation:not implemented
- Release:not applicable
- Activation:no migration activated
Sources: Secret Network governance (public REST endpoint) — Proposal 360: Migrate $SCRT to Arbitrum via Snapshot (external site) · Secret Network governance (public REST endpoint) — Proposal 361: Continue Secret Network on Cosmos under community stewardship (external site) · Secret Network Forum (SCRT Labs post) — $SCRT is Moving to Arbitrum (external site) · Secret Network Forum (SCRT Labs post) — Signaling Proposal: Migrate $SCRT to Arbitrum via Snapshot (external site) · Secret Network Forum (Secret Network Foundation post) — Signaling Proposal: Continue SCRT under community with remediation (external site) · Secret Network Forum (Secret Network Foundation draft, with an SCRT Labs reply) — Community Continuance of Secret Network (L1) (external site)
-
ApeChain's docs removed the native-yield and interim Security Council sections
A 27 July 2026 commit titled 'Removed native yield and security council' deleted the 'Functional Native Yield' line from ApeChain's architecture page and the section describing an interim Security Council of Ape Foundation and infrastructure-partner signers, which ApeCoin DAO elections were meant to replace. The same cleanup pull request removed several third-party tool pages.
- Implementation:documentation change merged
- Release:live on docs.apechain.com
- Activation:no change to chain rules; effect on yield or signers not established
Sources: Ape Foundation (GitHub, ape-foundation/apechaindocs) — Commit 45d84d1: Removed native yield and security council (external site) · Ape Foundation (GitHub, ape-foundation/apechaindocs) — Pull request #73 (cleanup): commits (external site) · Ape Foundation (ApeChain Docs) — ApeChain Architecture (external site) · L2BEAT — ApeChain (external site) · ApeCoin DAO forum (via Internet Archive) — AIP-596: Sunsetting the DAO and Launching ApeCo (Accepted AIPs; archived copy of 2 Jan 2026) (external site)
-
ApeChain's node guide moved to the apechain-3.9.9 Nitro image and a July 2026 snapshot
The Ape Foundation's docs repository updated the Run a Node page on 27 July 2026 to point operators to a v3.9.9 replica guide and the Docker image nitro-node:apechain-3.9.9, replacing the apechain-v3.5.6 image. On 3 August 2026 it added a snapshot dated 30 July 2026 with resumable download steps and its exact size.
- Implementation:node image apechain-3.9.9 referenced in ApeChain's docs
- Release:documented for operators; no release notes found
- Activation:ApeCoin announced the ArbOS 51 upgrade on 9 September 2026; no activation block published
Sources: Ape Foundation (GitHub, ape-foundation/apechaindocs) — Commit 692f0fa: Update run-node.mdx (v3.9.9 replica guide and image) (external site) · Ape Foundation (GitHub, ape-foundation/apechaindocs) — Commit aea95f3: Update run-node.mdx (30 July 2026 snapshot) (external site) · Ape Foundation (ApeChain Docs) — Run a Node (external site) · Arbitrum Docs (Offchain Labs) — ArbOS 51 Dia (external site) · ApeCoin (@apecoin on X) — ApeCoin on X: ApeChain has upgraded to ArbOS 51 (post embed) (external site)
-
Lotus v1.36.2 corrected Ethereum JSON-RPC responses and tracing settings
Lotus Node v1.36.2 is a recommended patch release, not tied to a network upgrade. It corrects several Ethereum JSON-RPC methods (eth_call and eth_estimateGas now accept a from address that is a contract or not yet on-chain, and lookups of replaced transactions return null), makes StateWaitMsg wait for the confirmation depth a caller asks for, and replaces the Jaeger tracing exporter with an OpenTelemetry (OTLP) exporter.
- Implementation:changes shipped in Lotus v1.36.2
- Release:released 2026-07-27 as a recommended patch
- Activation:takes effect per node when operators upgrade; no network upgrade attached; adoption not observed
Source: filecoin-project/lotus — Lotus v1.36.2 (external site)
-
Accepted FLIP 370 fee recalibration included in a node release
Flow's 27 July 2026 post described FLIP 370's recalibration of execution-effort weights and projected higher fees with lower reward-funded issuance. The proposal is marked accepted and flow-go v0.51.0 includes its mainnet weights. This confirms a software release, not the date when every charged fee parameter changed.
- Proposal:FLIP 370 marked accepted in Flow's FLIP repository
- Implementation:flow-go v0.51.0 updates the node software's built-in mainnet weights to FLIP 370 values
- Release:flow-go v0.51.0 released for a mainnet height-coordinated upgrade dated 18 August 2026
- Activation:whether the fee weights charged on mainnet have switched was not confirmed
Sources: Flow Foundation — Transaction Fees Are Rising, FLOW Issuance Is Falling (external site) · onflow/flips repository — FLIP 370: Execution effort calibration III (external site) · onflow/flow-go repository — v0.51.0: 18th Aug 2026 - Height Coordinated Upgrade on Mainnet28 (external site)
-
Telos mainnet switched to Savanna finality
Telos announced that the switchtosvnn multisig executed at block 480,286,656 on 27 July 2026, moving mainnet to Savanna consensus. Active block producers now also run finalizers that vote with BLS keys, and Telos reported finalizer policy generation 1 with a threshold of 15, all 21 scheduled finalizers active, and the last irreversible block trailing the head by 2 blocks instead of about 330. The system contract used for the upgrade was deployed on 16 July and recorded as telos.contracts v1.8.0.
- Proposal:executed as an on-chain multisig proposal (switchtosvnn)
- Implementation:shipped in TelosZero Core and the v1.8.0 system contract
- Release:system contract deployed 2026-07-16
- Activation:active on mainnet since block 480,286,656 on 2026-07-27
Sources: Telos blog — Telos Lightspeed: Instant Finality is live (external site) · Telos Network (GitHub) — telos.contracts v1.8.0: Telos Instant Finality system contract (external site) · Telos blog — Project Lightspeed: Instant Finality Upgrade (external site)